Valid

RB/T 112-2023Energy management system - Requirements for certification on chemical fertilizer and methanol plants (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (27 pages)

Need quotation for your management?

Get a formal quotation for RB/T 112-2023 in 30 minutes.

Issued by

National Certification and Accreditation Administration

Level / Type

National · Recommended

Issue date

October 16, 2023

Implementation date

December 1, 2023

Scope

RB/T 112-2023 (Energy management system - Requirements for certification on chemical fertilizer and methanol plants) is available as an English-translated PDF.

RB/T 112-2023 — This document specifies the energy management system requirements for fertilizer and methanol companies: This document is applicable to fertilizer and methanol enterprises to establish, implement, maintain and continuously improve their energy management system: Energy management system certification for methanol enterprises: Reference for other stakeholders to evaluate the energy management system of fertilizer and methanol enterprises:

Found what you need?

Document preview — RB/T 112-2023

National Standard of the People's Republic of China

ICS
27.010
Classification
F 01
Replacing
RB/T 112-2014

Issued by: National Certification and Accreditation Administration

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 Organizational environment
  • 5 Leadership
  • 6 Planning
  • 7 Support
  • 8 Run
  • 9 Performance Evaluation
  • 10 Improvement
  • Appendix A (Informative) Basic Information on Energy Management in Fertilizer and Methanol Enterprises
  • Appendix B (Informative) List of commonly used laws, regulations, standards and other requirements for energy management in fertilizer and methanol enterprises
  • Appendix C (Informative) Application Examples of Energy Management System Requirements for Fertilizer and Methanol Enterprises --- Energy Review
  • Reference
  • Figure A:1 Schematic diagram of the process flow of a fixed bed gasifier for smokeless lump coal or briquette feedstock
  • Figure A:2 Schematic diagram of the process flow of a fluidized flow pressurized gasifier for bituminous coal or lignite raw materials
  • Figure A:3 Schematic diagram of a typical production process for producing synthetic ammonia and urea using natural gas as raw material
  • Figure A:4 Schematic diagram of a typical production process for methanol using coal as raw material
  • Figure A:5 Schematic diagram of a typical production process for methanol using natural gas as raw material
  • Figure A:6 Schematic diagram of a typical acid production process for producing phosphate fertilizer using phosphate rock as raw material
  • Figure A:7 Schematic diagram of potassium chloride flotation production process
  • Table B:1 Commonly used laws, regulations and other requirements for energy management in fertilizer and methanol enterprises
  • Table B:2 Main Standard Catalogs for Energy Management in Fertilizer and Methanol Enterprises
  • Table C:1 Main energy consumption data and proportions in
  • Table C:2 List of main electrical equipment
  • Table C:3 Main steam consuming equipment
  • Table C:4 Main equipment using natural gas
  • Table C:5 Energy metering equipment configuration table
  • Table C:6 Comprehensive energy consumption per unit of major products in:201926
  • Table C:7 Comprehensive energy consumption per unit of major products in
  • Table C:8 High energy consumption motors to be eliminated

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting:

This document is the specific requirements for the application of GB/T 23331-2020 "Energy Management System Requirements and Usage Guide" in fertilizer and methanol enterprises:

This is a refinement of GB/T 23331-2020:

This document replaces RB/T 112-2014 "Energy Management System Certification Requirements for Fertilizer and Methanol Enterprises":

Compared with the previous version, in addition to structural adjustments and editorial changes, the main technical changes are as follows:

a) The structure, core technical elements, common terms and definitions of GB/T 23331-2020 are adopted;

b) Added the environment in which the enterprise is located (see 4.1);

c) added measures to address risks and opportunities (see 6.1);

d) Added planning for energy data collection (see 6.6);

e) Added improvements (see 10.3);

f) The scope of the management system has been changed (see 4.3, 4:1:2 of the:2014 edition);

g) Changed the energy review (see 6.3, 4:4:3 of the:2014 edition);

h) The energy performance parameters have been changed (see 6.4, 4:4:5 of the:2014 edition);

i) Changed the energy benchmark (see 6.5, 4:4:4 of the:2014 edition);

j) Operational planning and control have been changed (see 8.1, 8:2, 8:3, 4:5:5, 4:5:6, 4:5:7 of the:2014 edition);

k) Appendices A, B and C were modified;

l) The terms and definitions have been changed (see Chapter 3, Chapter 3 of the:2014 edition);

m) Management representative (see 4.2:2 of the:2014 edition) has been deleted:

1 Scope

This document specifies the energy management system requirements for fertilizer and methanol companies:

This document is applicable to fertilizer and methanol enterprises to establish, implement, maintain and continuously improve their energy management system:

Energy management system certification for methanol enterprises: Reference for other stakeholders to evaluate the energy management system of fertilizer and methanol enterprises:

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document:

For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to this document:

GB/T 2589 General rules for calculation of comprehensive energy consumption GB 17167 General rules for the allocation and management of energy metering instruments in energy-consuming units GB/T 21367 Requirements for the allocation and management of energy metering instruments in chemical enterprises GB/T 23331-2020 Energy Management System Requirements and Usage Guide

3 Terms and definitions

The terms and definitions defined in GB/T 23331-2020 and GB/T 2589 apply to this document:

4 Organizational environment

4.1 Understanding the organization and its environment

4.1.1 Enterprises should comply with the requirements of 4:1 of GB/T 23331-2020:

4.1.2 The enterprise shall identify the internal and external factors (positive or negative) that affect its energy performance and energy management system, such as the following factors:

a) External factors:

---National, local, industry, and superior unit goals, requirements, or standards: For example: energy control indicators issued by the competent authorities, unit Product energy consumption limit standards, elimination of outdated processes and high-energy-consuming equipment, etc:;

--- The cost or availability of the main energy sources used, the use of renewable energy, etc:;

--- Environmental and climate factors, such as high temperature, sudden weather, etc:;

---Others: Such as the impact of global greenhouse gases, carbon emissions trading, carbon peak, carbon neutrality, etc:

b) Internal factors:

---Mission, vision and development strategy;

---Human resources, finance, energy costs, etc:;

---The degree of perfection of the energy management system;

--- Emergency plans to deal with energy supply disruptions;

--- Current status of production process and application of energy-saving technology;

---other:

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 27 pages — is available in the English PDF.

Referenced standards

How to Download RB/T 112-2023

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
27 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

RB/T 112-2023

$654.00