RB/T 112-2014Energy management system - Requirements for certification on chemical fertilizer and methanol plants (English PDF)
This is a limited preview
Buy now to download the full PDF (27 pages)
Need quotation for your management?
Get a formal quotation for RB/T 112-2014 in 30 minutes.
Issued by
National Certification and Accreditation Administration
Level / Type
National · Recommended
Issue date
October 16, 2023
Implementation date
December 1, 2023
Scope
RB/T 112-2014 (Energy management system - Requirements for certification on chemical fertilizer and methanol plants) is available as an English-translated PDF.
RB/T 112-2014 — This document specifies the energy management system requirements for fertilizer and methanol companies: This document is applicable to fertilizer and methanol enterprises to establish, implement, maintain and continuously improve their energy management system: Energy management system certification for methanol enterprises: Reference for other stakeholders to evaluate the energy management system of fertilizer and methanol enterprises:
Found what you need?
Document preview — RB/T 112-2014
National Standard of the People's Republic of China
- ICS
- 27.010
- Classification
- F 01
- Replacing
- RB/T 112-2014
Issued by: National Certification and Accreditation Administration
Contents
- Preface
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Organizational environment
- 5 Leadership
- 6 Planning
- 7 Support
- 8 Run
- 9 Performance Evaluation
- 10 Improvement
- Appendix A (Informative) Basic Information on Energy Management in Fertilizer and Methanol Enterprises
- Appendix B (Informative) List of commonly used laws, regulations, standards and other requirements for energy management in fertilizer and methanol enterprises
- Appendix C (Informative) Application Examples of Energy Management System Requirements for Fertilizer and Methanol Enterprises --- Energy Review
- Reference
- Figure A:1 Schematic diagram of the process flow of a fixed bed gasifier for smokeless lump coal or briquette feedstock
- Figure A:2 Schematic diagram of the process flow of a fluidized flow pressurized gasifier for bituminous coal or lignite raw materials
- Figure A:3 Schematic diagram of a typical production process for producing synthetic ammonia and urea using natural gas as raw material
- Figure A:4 Schematic diagram of a typical production process for methanol using coal as raw material
- Figure A:5 Schematic diagram of a typical production process for methanol using natural gas as raw material
- Figure A:6 Schematic diagram of a typical acid production process for producing phosphate fertilizer using phosphate rock as raw material
- Figure A:7 Schematic diagram of potassium chloride flotation production process
- Table B:1 Commonly used laws, regulations and other requirements for energy management in fertilizer and methanol enterprises
- Table B:2 Main Standard Catalogs for Energy Management in Fertilizer and Methanol Enterprises
- Table C:1 Main energy consumption data and proportions in
- Table C:2 List of main electrical equipment
- Table C:3 Main steam consuming equipment
- Table C:4 Main equipment using natural gas
- Table C:5 Energy metering equipment configuration table
- Table C:6 Comprehensive energy consumption per unit of major products in:201926
- Table C:7 Comprehensive energy consumption per unit of major products in
- Table C:8 High energy consumption motors to be eliminated
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting:
This document is the specific requirements for the application of GB/T 23331-2020 "Energy Management System Requirements and Usage Guide" in fertilizer and methanol enterprises:
This is a refinement of GB/T 23331-2020:
This document replaces RB/T 112-2014 "Energy Management System Certification Requirements for Fertilizer and Methanol Enterprises":
Compared with the previous version, in addition to structural adjustments and editorial changes, the main technical changes are as follows:
a) The structure, core technical elements, common terms and definitions of GB/T 23331-2020 are adopted;
b) Added the environment in which the enterprise is located (see 4.1);
c) added measures to address risks and opportunities (see 6.1);
d) Added planning for energy data collection (see 6.6);
e) Added improvements (see 10.3);
f) The scope of the management system has been changed (see 4.3, 4:1:2 of the:2014 edition);
g) Changed the energy review (see 6.3, 4:4:3 of the:2014 edition);
h) The energy performance parameters have been changed (see 6.4, 4:4:5 of the:2014 edition);
i) Changed the energy benchmark (see 6.5, 4:4:4 of the:2014 edition);
j) Operational planning and control have been changed (see 8.1, 8:2, 8:3, 4:5:5, 4:5:6, 4:5:7 of the:2014 edition);
k) Appendices A, B and C were modified;
l) The terms and definitions have been changed (see Chapter 3, Chapter 3 of the:2014 edition);
m) Management representative (see 4.2:2 of the:2014 edition) has been deleted:
1 Scope
This document specifies the energy management system requirements for fertilizer and methanol companies:
This document is applicable to fertilizer and methanol enterprises to establish, implement, maintain and continuously improve their energy management system:
Energy management system certification for methanol enterprises: Reference for other stakeholders to evaluate the energy management system of fertilizer and methanol enterprises:
2 Normative references
The contents of the following documents constitute the essential clauses of this document through normative references in this document:
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to this document:
GB/T 2589 General rules for calculation of comprehensive energy consumption GB 17167 General rules for the allocation and management of energy metering instruments in energy-consuming units GB/T 21367 Requirements for the allocation and management of energy metering instruments in chemical enterprises GB/T 23331-2020 Energy Management System Requirements and Usage Guide
3 Terms and definitions
The terms and definitions defined in GB/T 23331-2020 and GB/T 2589 apply to this document:
4 Organizational environment
4.1 Understanding the organization and its environment
4.1.1 Enterprises should comply with the requirements of 4:1 of GB/T 23331-2020:
4.1.2 The enterprise shall identify the internal and external factors (positive or negative) that affect its energy performance and energy management system, such as the following factors:
a) External factors:
---National, local, industry, and superior unit goals, requirements, or standards: For example: energy control indicators issued by the competent authorities, unit Product energy consumption limit standards, elimination of outdated processes and high-energy-consuming equipment, etc:;
--- The cost or availability of the main energy sources used, the use of renewable energy, etc:;
--- Environmental and climate factors, such as high temperature, sudden weather, etc:;
---Others: Such as the impact of global greenhouse gases, carbon emissions trading, carbon peak, carbon neutrality, etc:
b) Internal factors:
---Mission, vision and development strategy;
---Human resources, finance, energy costs, etc:;
---The degree of perfection of the energy management system;
--- Emergency plans to deal with energy supply disruptions;
--- Current status of production process and application of energy-saving technology;
---other:
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 27 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 2589General rules for calculation of the comprehensive energy consumption
- GB 17167General rules for energy measuring instrument equipping and managing of energy user
- GB/T 21367Specification for equipping and managing of the measuring instrument of energy in chemical enterprise
- GB/T 23331-2020Energy management system requirements and guidelines
How to Download RB/T 112-2014
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 17167-2025 — General rules for energy measuring instrument equipping and managing of energy user
GB/T 21367-2008 — Specification for equipping and managing of the measuring instrument of energy in chemical enterprise
GB/T 23331-2020 — Energy management system requirements and guidelines
Secure payment via Stripe
Payments accepted
RB/T 112-2014
$355.00