QB/T 6019-2023Specifications for construction quality acceptance of professional equipment installation projects for pulping and papermaking (English PDF)
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for QB/T 6019-2023 in 30 minutes.
Level / Type
National · Recommended
Scope
QB/T 6019-2023 (Specifications for construction quality acceptance of professional equipment installation projects for pulping and papermaking) is available as an English-translated PDF.
QB/T 6019-2023 is the Chinese industry standard "Specifications for construction quality acceptance of professional equipment installation projects for pulping and papermaking". It is in force and replaces QB/T 6019-2004.
Found what you need?
Document preview — QB/T 6019-2023
Contents
- Document data
1 Document data
Sector: Light Industry (industry standard).
Status: valid, replaces QB/T 6019-2004.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Editions of QB/T 6019
| Edition | Title | Revision | Status |
|---|---|---|---|
| QB/T 6019-2023 | Specifications for construction quality acceptance of professional equipment installation projects for pulping and papermaking | — | Valid |
| QB/T 6019-2004 | Code for acceptance of constructional quality of installation engineering for pulp and paper machines | — | Obsolete |
This page sells the current edition, QB/T 6019-2023. Earlier editions are listed for reference only.
How to Download QB/T 6019-2023
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
Secure payment via Stripe
Payments accepted
QB/T 6019-2023
$165.00