DL/T Standards

Found: 2904 — page 34 of 61

Valid

DL/T 1000.1-2018 — Application guide of insulators for overhead lines with a nominal voltage over 1000V - Part 1: Ceramic or glass insulators for a. c. systems

National·Recommended
Instant delivery (0–9 sec)
$180.0016 pages
Valid

DL/T 1000.4-2018 — Application guide of insulators for overhead lines with a nominal voltage over 1000V - Part 4: Composite insulators for d. c. systems

National·Recommended
Instant delivery (0–9 sec)
$240.0011 pages
Valid

DL/T 1013-2018 — Test and adjustment guide of microcomputer-based excitation regulator for large and medium hydraulic generators

National·Recommended
Instant delivery (0–9 sec)
$165.001 pages
Valid

DL/T 1035.1-2018 — Guideline for maintenance of circulating fluidized bed boiler -- Part 1: General provisions

National·Recommended
Instant delivery (0–9 sec)
$150.007 pages
Valid

DL/T 1035.2-2018 — Guide for inspection of circulating fluidized bed boilers - Part 2:

National·Recommended
Instant delivery (0–9 sec)
$300.0015 pages
Valid

DL/T 1035.3-2018 — Guideline for maintenance of circulating fluidized bed boiler -- Part 3: The maintenance of flue gas and air system

National·Recommended
Instant delivery (0–9 sec)
$255.0013 pages
Valid

DL/T 1035.4-2018 — Guide for inspection of circulating fluidized bed boilers - Part 4: Maintenance of boiler ash cooling and conveyor systems

National·Recommended
Instant delivery (0–9 sec)
$240.0011 pages
Valid

DL/T 1035.5-2018 — Guides for inspection of circulating fluidized bed boilers - Part 5: Refractory

National·Recommended
Instant delivery (0–9 sec)
$120.007 pages
Valid

DL/T 1035.6-2018 — Guide for inspection of circulating fluidized bed boilers - Part 6: Maintenance of limestone conveying systems and SNCR denitration systems

National·Recommended
Instant delivery (0–9 sec)
$200.008 pages
Valid

DL/T 1077-2018 — Ion exchange resin organic elution method

National·Recommended
Instant delivery (0–9 sec)
$110.005 pages
Valid

DL/T 1080.100-2018 — Power Enterprise Application Integration Distribution Management System Interface Part 100: Implementation Framework

National·Recommended
Instant delivery (0–9 sec)
$1,325.0073 pages
Valid

DL/T 1091-2018 — Code of furnace safeguard supervisory system for thermal power plant

National·Recommended
Instant delivery (0–9 sec)
$435.0018 pages
Valid

DL/T 1093-2018 — Guide for reactance method to detect and diagnose winding deformation of power transformer

National·Recommended
Instant delivery (0–9 sec)
$255.009 pages
Valid

DL/T 1094-2018 — Guide to the choice of power transformer insulating oil

National·Recommended
Instant delivery (0–9 sec)
$210.009 pages
Valid

DL/T 1095-2018 — On-site determination methods of electrostatic charging degree of transformer oil

National·Recommended
Instant delivery (0–9 sec)
$85.004 pages
Valid

DL/T 1096-2018 — Limited value of particulate pollutant of transformer oil

National·Recommended
Instant delivery (0–9 sec)
$55.003 pages
Valid

DL/T 1100.1-2018 — Time synchronism systems of power system - Part 1: Technical specifications

National·Recommended
Instant delivery (0–9 sec)
$420.0019 pages
Valid

DL/T 1100.3-2018 — Time synchronism systems of power system - Part 3: Technical specifications for time synchronization based on SDH

National·Recommended
Instant delivery (0–9 sec)
$150.007 pages
Valid

DL/T 1100.4-2018 — Time synchronization systems for power systems - Part 4: Specifications

National·Recommended
Instant delivery (0–9 sec)
$210.009 pages
Valid

DL/T 1100.6-2018 — Time synchronism systems of power system -- Part 6: Monitoring specifications

National·Recommended
Instant delivery (0–9 sec)
$225.0011 pages
Valid

DL/T 1120-2018 — Hydraulic turbine control system test and real-time simulation device technical specification

National·Recommended
Instant delivery (0–9 sec)
$290.0011 pages
Valid

DL/T 1231-2018 — Power System Stabilizer Tuning Test Guide

National·Recommended
Instant delivery (0–9 sec)
$335.0011 pages
Valid

DL/T 1405.2-2018 — Synchrophasor measurement unit for smart substation - Part 2: Technical specifications

National·Recommended
Instant delivery (0–9 sec)
$240.0013 pages
Valid

DL/T 1405.3-2018 — Synchrophasor measurement unit for smart substation - Part 3: Test specifications

National·Recommended
Instant delivery (0–9 sec)
$420.0020 pages
Valid

DL/T 1414.351-2018 — Electricity market communication Part 351: Partitioning of partitioned electricity price market models

National·Recommended
Instant delivery (0–9 sec)
$815.0041 pages
Valid

DL/T 1798-2018 — Code of commissioning and prophylactic test for converter transformer

National·Recommended
Instant delivery (0–9 sec)
$175.007 pages
Valid

DL/T 1799-2018 — The method of ability to withstand DC bias test for power transformers

National·Recommended
Instant delivery (0–9 sec)
$235.009 pages
Valid

DL/T 1800-2018 — Technical guide for modeling and testing of hydraulic turbine governing system

National·Recommended
Instant delivery (0–9 sec)
$725.0022 pages
Valid

DL/T 1801-2018 — Phased array ultrasonic testing of welded joints of hydropower metal structures and equipment

National·Recommended
Instant delivery (0–9 sec)
$500.0017 pages
Valid

DL/T 1802-2018 — Technical Specification for Automatic Generation Control and Automatic Voltage Control System of Hydropower Plant

National·Recommended
Instant delivery (0–9 sec)
$255.009 pages
Valid

DL/T 1803-2018 — Specification of control devices of auxiliary equipments for hydropower plant

National·Recommended
Instant delivery (0–9 sec)
$155.007 pages
Valid

DL/T 1804-2018 — Turbine generator vibration swing device technical conditions

National·Recommended
Instant delivery (0–9 sec)
$390.0017 pages
Valid

DL/T 1805-2018 — Selection guide to the on-load tap-changer for power transformers

National·Recommended
Instant delivery (0–9 sec)
$500.0017 pages
Valid

DL/T 1806-2018 — Guide for the choice of insulation board and component in oil-immersed transformers

National·Recommended
Instant delivery (0–9 sec)
$270.008 pages
Valid

DL/T 1807-2018 — Guidelines for ultrasonic detection and positioning of partial discharge in oil-immersed power transformers and reactors

National·Recommended
Instant delivery (0–9 sec)
$530.0018 pages
Valid

DL/T 1808-2018 — Guide for turn-to-turn overvoltage test of air-core reactors on site

National·Recommended
Instant delivery (0–9 sec)
$240.007 pages
Valid

DL/T 1809-2018 — Technical guidelines for condition-based maintenance decision support system of hydropower plant equipment

National·Recommended
Instant delivery (0–9 sec)
$270.008 pages
Valid

DL/T 1810-2018 — 110 (66) kV sulfur hexafluoride gas insulated power transformer using technical conditions

National·Recommended
Instant delivery (0–9 sec)
$390.0017 pages
Valid

DL/T 1811-2018 — Guide for selection of the natural esters insulating oil for power transformers

National·Recommended
Instant delivery (0–9 sec)
$390.0011 pages
Valid

DL/T 1813-2018 — Oil-immersed amorphous alloy core distribution transformer selection guide

National·Recommended
Instant delivery (0–9 sec)
$480.0013 pages
Valid

DL/T 1814-2018 — Analysis and Determination of Dissolved Gas in Test Oil of Oil-immersed Power Transformer Factory

National·Recommended
Instant delivery (0–9 sec)
$165.007 pages
Valid

DL/T 1815-2018 — Electrochemical energy storage plant equipment reliability evaluation procedures

National·Recommended
Instant delivery (0–9 sec)
$405.0019 pages
Valid

DL/T 1816-2018 — Code Guidelines for the Identification of Electrochemical Energy Storage Plants

National·Recommended
Instant delivery (0–9 sec)
$710.0022 pages
Valid

DL/T 1817-2018 — Technical conditions for the use of insulated copper pipe on the low side of the transformer

National·Recommended
Instant delivery (0–9 sec)
$330.009 pages
Valid

DL/T 1818-2018 — Specification of reversible pump-turbine governing system test

National·Recommended
Instant delivery (0–9 sec)
$560.0019 pages
Valid

DL/T 1819-2018 — Specification of static frequency converter for pumped storage power plant

National·Recommended
Instant delivery (0–9 sec)
$165.007 pages
Valid

DL/T 1821-2018 — Guide for the maintenance of power plant gate valve and globe valve

National·Recommended
Instant delivery (0–9 sec)
$500.0031 pages
Valid

DL/T 1822-2018 — Guide in order and acceptance of extraction check valves used for power station

National·Recommended
Instant delivery (0–9 sec)
$415.0015 pages