DL/T 1805-2018Selection guide to the on-load tap-changer for power transformers (English PDF)
This is a limited preview
Buy now to download the full PDF (17 pages)
Need quotation for your management?
Get a formal quotation for DL/T 1805-2018 in 30 minutes.
Issued by
National Energy Administration
Level / Type
National · Recommended
Issue date
April 3, 2018
Implementation date
July 1, 2018
Scope
DL/T 1805-2018 (Selection guide to the on-load tap-changer for power transformers) is available as an English-translated PDF.
DL/T 1805-2018 — This standard specifies the selection principles, selection process, technical requirements, protection and distribution marks, packaging, transportation and storage requirements for on-load tap-changers (resistive type) for power transformers.
Found what you need?
Document preview — DL/T 1805-2018
National Standard of the People's Republic of China
- ICS
- 29.180
- Classification
- K 41
Issued by: National Energy Administration
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard specifies the selection principles, selection process, technical requirements, protection and distribution marks, packaging, transportation and storage requirements for on-load tap-changers (resistive type) for power transformers. This standard applies to oil-immersed AC power transformers with a rated voltage of 35kV to 500kV.
Document data
International classification (ICS): 29.180.
Chinese classification (CCS): K41.
Estimated length of the Chinese original: 26,266 words.
Standards quoted by this document
GB/T 1094.1; GB/T 1094.3; GB/T 1094.5; GB/T 1094.7; GB 2536; GB/T 6451; GB/T 7354; GB/T 10230.1-2007; GB/T 10230.2; DL/T 596; JB/T 7065; JB/T 8314; JB/T 10372
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 17 pages — is available in the English PDF.
How to Download DL/T 1805-2018
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 1210-2025 — Code for Testing and Acceptance of Automatic Generation Control Performance of Thermal Power Plant
DL/T 1332-2025 — Guidelines for on-site low-frequency test of excitation characteristic of the current transformer
DL/T 2875.1-2025 — Technical specification for dust suppression of coal transportation equipment in thermal power plants - Part 1: General provisions
Secure payment via Stripe
Payments accepted
DL/T 1805-2018
$584.00