Valid

NB/T 35044-2014Specification for designing service power system for hydropower station (English PDF)

水力发电厂厂用电设计规程

Preview PDF

This is a limited preview

Buy now to download the full PDF (79 pages)

Need quotation for your management?

Get a formal quotation for NB/T 35044-2014 in 30 minutes.

Issued by

NEA

Level / Type

Industry · Recommended

Issue date

October 15, 2014

Implementation date

March 1, 2015

Scope

NB/T 35044-2014 is the English-translated version of 水力发电厂厂用电设计规程.

NB/T 35044-2014 is the Chinese energy industry standard covering specification for designing service power system for hydropower station. It was issued on 15 October 2014 and has been in force since 1 March 2015, replacing DL/T 5164-2002.

The document is under the responsibility of the National Energy Administration. This page is published from the official record of the 2014 edition. The figures, limits and tables the standard contains are those of the document itself, delivered in full with the English translation.

Found what you need?

Document preview — NB/T 35044-2014

National Standard of the People's Republic of China

Replacing
DL/T 5164-2002

Issued by: National Energy Administration of the People's Republic of China

Contents

  • [Preview only]
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 General requirements
  • 4.1 Environmental conditions
  • 4.2 Basic principles
  • 4.3 Basic process
  • 5 Technical Requirements
  • 6 Test methods
  • 7 Inspection Rules
  • 8 Marking, packaging, transportation and storage
  • 9 Evaluation indicators

1 Foreword

NB/T 35044-2014 was issued by National Energy Administration of the People's Republic of China on 15 October 2014 and has been in force since 1 March 2015.

The NB/T prefix marks a recommended standard. It is not law in itself: it becomes binding when a contract names it, when a regulation or a mandatory standard refers to it, or when a producer declares conformity with it.

The document runs to 79 pages in English translation.

2 Scope Preview

NB/T 35044-2014 carries no ICS number and no Chinese Standard Classification code.

This catalogue holds 4,537 other NB/T standards.

Of the 1,959 NB/T standards that do carry an ICS number, 1,265 (65%) fall under ICS 27, in the field of energy and heat transfer engineering.

3 About this standard

Issued by: National Energy Administration of the People's Republic of China

English translation: about 79 pages

4 Related standards

Other editions:

NB/T 35044-2023 (later edition)

Standards on related subjects:

NB 35047-2015 — Code for seismic design of hydraulic structures of hydropower projects

SL 314-2004 — Design specification for roller compacted concrete dams

SL 282-2003 — Design specification for concrete arch dams

NB/T 35052-2025 — Specifications for Water Quality Analysis in Geological Exploration of Hydropower Projects

NB/T 35041-2025 — Design Specifications for Diversion Design in Hydropower Project Construction

NB/T 35038-2025 — Code for Comprehensive Supervision of Resettlementfor Hydropower Projects

5 Classification and status

Prefix NB/T: recommended standard.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 79 pages — is available in the English PDF.

Referenced standards

Similar standards

Editions of NB/T 35044

EditionTitleRevisionStatus
NB/T 35044-2014Specification for designing service power system for hydropower stationcurrent editionCurrent
DL/T 5164-2002Specification for designing service power system for hydropower stationprevious editionSuperseded

This page sells the current edition, NB/T 35044-2014. Earlier editions are listed for reference only.

How to Download NB/T 35044-2014

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
79 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 35044-2014

$1,325.00