NB/T 35007-2013Geological Code of Construction Period for Hydropower Project (English PDF)
水电工程施工地质规程
This is a limited preview
Buy now to download the full PDF (50 pages)
Need quotation for your management?
Get a formal quotation for NB/T 35007-2013 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
June 8, 2013
Implementation date
October 1, 2013
Scope
NB/T 35007-2013 is the English-translated version of 水电工程施工地质规程.
NB/T 35007-2013 is the Chinese energy industry standard governing geological work during the construction period of a hydropower project. It applies to large and medium-sized hydropower projects, pumped storage projects included, and concerns the geological work carried out while the works are being built rather than during survey and design.
The code sits in classification P59. Its text quotes GB 50287, DL/T 5109-1999, DL/T 5123, DL 5180, DL/T 5185, DL/T 5347 and DL/T 5388. It replaced DL/T 5109-1999, the earlier electric power industry code on the same subject. Issued on 8 June 2013, it has applied since 1 October 2013.
Found what you need?
Document preview — NB/T 35007-2013
National Standard of the People's Republic of China
- ICS
- 27.140
- Replacing
- DL/T 5109-1999
Issued by: National Energy Administration of the People's Republic of China
Contents
- [Preview only]
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Technical requirements
- 4.1 Environmental conditions
- 4.2 Operating conditions during on-grid operation
- 4.3 Wind turbine conditions during off-grid power supply
- 4.4 Bearing current
- 4.5 Isolation insulation resistance
- 4.6 Performance requirements
- 4.7 Sensors
- 4.8 Electromagnetic compatibility requirements
- 4.9 Human-machine interaction
- 5 Test methods
- 5.1 Test requirements
- 5.2 Test principles and methods
- 6.1 Samples and interfaces
- 6.2 Technical requirements for test items
- 7 Inspection rules
- 7.1 Basic function test
- 7.2 Touch current test
- 7.3 Loading test
- 7.4 Braking test
- 7.5 Machine-side differential mode voltage dU/dt value
- 7.6 Temperature rise test
- 7.7 Converter module current sharing test
- 7.8 Filter capacitor switching current test
- 7.9 Filter capacitor operating current test
- 8 Product nameplate, marking, packaging, transportation and storage
- 9 Assembly alignment of weldments
1 Foreword
NB/T 35007-2013 was issued by National Energy Administration of the People's Republic of China on 8 June 2013 and has been in force since 1 October 2013.
The NB/T prefix marks a recommended standard. It is not law in itself: it becomes binding when a contract names it, when a regulation or a mandatory standard refers to it, or when a producer declares conformity with it.
The document runs to 50 pages in English translation.
2 Scope Preview
This standard is the Chinese energy industry standard governing geological work during the construction period of a hydropower project. It applies to large and medium-sized hydropower projects, pumped storage projects included, and concerns the geological work carried out while the works are being built rather than during survey and design. The code sits in classification P59. Its text quotes GB 50287, DL/T 5109-1999, DL/T 5123, DL 5180, DL/T 5185, DL/T 5347 and DL/T 5388. It replaced DL/T 5109-1999, the earlier electric power industry code on the same subject.
NB/T 35007-2013 falls under ICS 27.140, in the field of energy and heat transfer engineering.
This catalogue holds 1,264 other NB/T standards in that field.
In this catalogue, NB/T standards carry edition years from 2009 to 2026.
3 Normative references
GB 50287
DL/T 5109-1999
DL/T 5123
DL 5180
DL/T 5185
DL/T 5347
DL/T 5388
4 About this standard
Issued by: National Energy Administration of the People's Republic of China
English translation: about 50 pages
5 Related standards
Standards on related subjects:
NB 35047-2015 — Code for seismic design of hydraulic structures of hydropower projects
SL 314-2004 — Design specification for roller compacted concrete dams
SL 282-2003 — Design specification for concrete arch dams
NB/T 35002-2025 — Design Specifications for Industrial Television Systems in Hydropower Plants
NB/T 35009-2024 — Specification for site selection planning of pumped storage power stations
NB/T 35001-2024 — Design specification for water regulation automation system of cascade hydropower stations
6 Classification and status
International classification (ICS): 27.140
Prefix NB/T: recommended standard.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 50 pages — is available in the English PDF.
Referenced standards
Normative references
DL/T 5109-1999 · DL/T 5123 · DL 5180 · DL/T 5185 · DL/T 5347 · DL/T 5388
Similar standards
Editions of NB/T 35007
| Edition | Title | Revision | Status |
|---|---|---|---|
| NB/T 35007-2013 | Geological Code of Construction Period for Hydropower Project | current edition | Current |
| DL/T 5109-1999 | Geological Code of Construction Period for Hydropower Project | previous edition | Superseded |
This page sells the current edition, NB/T 35007-2013. Earlier editions are listed for reference only.
How to Download NB/T 35007-2013
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 50287-1999 — Code for water resource and hydropower engineering geological investigation
GB 50287-2006 — Code for hydropower engineering geological investigation
GB 50287-2016 — Code for hydropower engineering geological investigation
Secure payment via Stripe
Payments accepted
NB/T 35007-2013
$800.00