Valid

NB/T 33019-2015Specification of operation and management for electric vehicle charging/battery swap infrastructure (English PDF)

电动汽车充换电设施运行管理规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for NB/T 33019-2015 in 30 minutes.

Issued by

NEA

Level / Type

Industry · Recommended

Issue date

April 2, 2015

Implementation date

September 1, 2015

Scope

NB/T 33019-2015 is the English-translated version of 电动汽车充换电设施运行管理规范.

NB/T 33019-2015 is the Chinese standard "Specification of operation and management for electric vehicle charging/battery swap infrastructure". Its scope clause reads: This standard specifies the operational management duties, management content and related requirements for electric vehicle charging/battery swap infrastructure.

This standard is applicable to electric vehicle charging/battery swap infrastructure using conductive charging, including charging stations, battery replacement stations, battery distribution centers, charging spots, etc. Its clauses include terms and definitions; defect management.

Found what you need?

Document preview — NB/T 33019-2015

National Standard of the People's Republic of China

Issued by: National Energy Administration of the People's Republic of China

Contents

  • Foreword3
  • 1 Scope4
  • 2 Normative references4
  • 3 Terms and definitions4
  • 4 Management duties5
  • 5 Handover acceptance of charging/battery swap infrastructure5
  • 6 Operation management5
  • 7 Overhaul and emergency repair9
  • 8 Defect management10
  • 9 Tools and spare parts12
  • 10 Safety management12
  • 11 Technology management14

1 Scope

This standard specifies the operational management duties, management content and related requirements for electric vehicle charging/battery swap infrastructure.

This standard is applicable to electric vehicle charging/battery swap infrastructure using conductive charging, including charging stations, battery replacement stations, battery distribution centers, charging spots, etc.

2 Normative references

The following documents are essential to the application of this document. For the dated documents, only the versions with the dates indicated are applicable to this document; for the undated documents, only the latest version (including all the amendments) are applicable to this standard.

GB/T 19596-2004 Terminology of electric vehicles

GB/T 29317-2012 Terminology of electric vehicle charging/battery swap infrastructure

GB/T 29318-2012 Electric energy metering for electric vehicle off-board charger

GB/T 28569-2012 Electric energy metering for electric vehicle AC charging spot

GB 50229-2006 Code for design of fire protection for fossil fuel power plants and substations

DL/T 448-2000 Technical administrative code of electric energy metering

3 Terms and definitions

The terms and definitions established in GB/T 29317-2012 apply to this standard.

6.3.3 Special patrol inspection

Special patrol inspections of charging/battery swap infrastructure shall be carried out:

a) When there is special weather such as wind, fog, rain, ice, and hail;

b) When the equipment is newly put into operation or put into operation again after being repaired, rebuilt, or long-term outage;

c) When suspicious phenomena are found during operation of the equipment.

6.4 Charging/battery swap operation

a) The charging/battery swap operation procedures or work instructions shall be formulated to regulate the charging/battery swap operations;

b) Safety protective gear such as overalls and insulated shoes shall be worn during operation. During manual charging/battery swap operation, there shall be personnel monitoring;

c) It shall confirm that the charging connection is correct before charging;

d) During battery swap operation, it shall be carried out in strict accordance with the battery swap process;

8 Defect management

8.1 Defect classification

Charging/battery swap infrastructure can be classified into critical, serious and general defects in accordance with the degree of defects. The operation and maintenance unit (department) shall establish a sound defect management system for charging/battery swap infrastructure to ensure the safe operation of the charging/battery swap infrastructure.

8.1.1 Critical defect

Critical defects refer to defects in the charging/battery swap infrastructure that directly threaten the safe operation and need to be dealt with immediately. For example, the following:

a) The charging/battery swap equipment or the battery box insulation is seriously damaged;

b) The busbar and cable of the charging device are overheated;

c) The battery box emits smoke;

d) The temperature of the battery box pole exceeds limit for a long time;

e) The battery box connector is damaged and the locking mechanism is loose;

f) The load-bearing components and transmission mechanism of the battery swap equipment are broken and worn.

8.1.2 Serious defects

A serious defect is a defect that poses a serious threat to the person or equipment, which must be dealt with as soon as possible even though operation can be maintained, for example:

a) Monitoring communication failure during charging/battery swap services;

10.1 Safety control

a) It shall take organizational and technical measures to ensure safety in the operation and maintenance of charging/battery swap infrastructure;

b) All staff of the charging/battery swap infrastructure shall be informed of the work area, safety measures, surrounding live objects and dangerous points before entering the site;

c) It shall implement the relevant provisions of the safety work procedures, the person in charge of work and the safety management personnel shall supervise and promptly stop and correct unsafe acts;

d) It shall perform regular safety inspections and anti-violation pick-up activities to increase safety supervision and anti-violation work;

e) It shall fully implement risk factor identification, evaluation and control procedures, to effectively control risk factors.

10.2 Fire safety

a) It shall establish the operational procedures for the fire safety system and fire safety equipment, and implement it strictly;

b) It shall establish firefighting facilities distribution maps, ledgers and records, and arrange special person to manage them, the contents of the ledgers include the nameplate parameters of the fire-fighting facilities, the place of setting, and the regular inspection results;

c) It shall perform one inspection of the firefighting facilities and materials on a monthly basis, fill the inspection records, and any problems such as expiration and invalidation shall be reported to the competent department in time;

d) It shall organize staff for firefighting training regularly to make them be familiar with the correct use of firefighting materials;

e) It shall hold regular fire emergency drills;

f) Smoking is prohibited in critical fire prevention areas and shall be clearly marked;

g) The inspection of the fire alarm system shall be included in the comprehensive inspection management. Any abnormalities or faults shall be reported and handled in time.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Similar standards

How to Download NB/T 33019-2015

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 33019-2015

$169.00