NB/T 20037.5-2013Probabilistic safety assessment for nuclear power plant applications. Part 5: Earthquake (English PDF)
应用于核电厂的概率安全评价 第5部分:地震
NB/T 20037.5 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| NB/T 20037.5-2021 | Probabilistic safety assessment for nuclear power plant applications - Part 5 : Earthquake | Valid |
| NB/T 20037.5-2013 | Probabilistic safety assessment for nuclear power plant applications. Part 5: Earthquake | Obsolete |
NB/T 20037.5-2013 is obsolete. It has been replaced by NB/T 20037.5-2021. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for NB/T 20037.5-2013 in 30 minutes.
Issued by
National Energy Administration
Level / Type
Industry · Recommended
Issue date
June 8, 2013
Implementation date
October 1, 2013
Scope
NB/T 20037.5-2013 is the English-translated version of 应用于核电厂的概率安全评价 第5部分:地震.
NB/T 20037.5-2013 is the Chinese industry standard "Probabilistic safety assessment for nuclear power plant applications. Part 5: Earthquake". It was issued on June 8, 2013 by the National Energy Administration, and took effect on October 1, 2013. It is obsolete: it has been replaced by NB/T 20037.5-2021.
Found what you need?
Document preview — NB/T 20037.5-2013
National Standard of the People's Republic of China
Issued by: National Energy Administration
Contents
- Document data
1 Document data
Sector: Energy Industry (industry standard).
Issuing body: National Energy Administration.
Date of issue: 2013-06-08.
Date of implementation: 2013-10-01.
Status: obsolete, replaced by NB/T 20037.5-2021.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Referenced standards
How to Download NB/T 20037.5-2013
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
NB/T 20037.6-2017 — Level 1 probabilistic safety assessment for nuclear power plant applications - Part 6: Screening and conservative analysis of other external events at power
NB/T 20037.4-2013 — Probabilistic safety assessment for nuclear power plant applications. Part 4: Fire
NB/T 20037.7-2017 — Level 1 probabilistic safety assessment for nuclear power plant applications - Part 7: High wind events at power
NB/T 20037.5-2013
$700.00