NB/T 20037.10-2017Level 1 probabilistic safety assessment for nuclear power plant applications - Part 10: Seismic margin assessment at power (English PDF)
RK应用于核电厂的一级概率安全评价 第10部分:功率运行抗震裕度评价
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for NB/T 20037.10-2017 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
February 10, 2017
Implementation date
July 1, 2017
Scope
NB/T 20037.10-2017 is the English-translated version of RK应用于核电厂的一级概率安全评价 第10部分:功率运行抗震裕度评价.
NB/T 20037.10-2017 is part 10 of the Chinese energy industry standard series on level 1 probabilistic safety assessment for nuclear power plant applications, and it treats seismic margin assessment at power.
It sets the requirements for assessing the seismic margin of a nuclear power plant while the plant is in power operation, and it applies to that assessment for pressurized water reactor plants; plants with other reactor types may follow it as a reference.
Being one part of a series, it is read with its companion parts NB/T 20037.1, NB/T 20037.2 and NB/T 20037.5. The standard is recommended in status and was published by the National Energy Administration. Issued on 10 February 2017, it has applied since 1 July 2017.
Found what you need?
Document preview — NB/T 20037.10-2017
National Standard of the People's Republic of China
- ICS
- 27.120.20
Issued by: National Energy Administration of the People's Republic of China
Contents
- 2 Normative references
2 Normative references
NB/T 20037.10-2017 cites the following standards, which apply in full or in part through the references made to them in its clauses.
NB/T 20037.1
NB/T 20037.2
NB/T 20037.5
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
- NB/T 20037.1Level 1 probabilistic safety assessment for nuclear power plant applications - Part 1: General requirements
- NB/T 20037.2Level 1 probabilistic safety assessment for nuclear power plant applications - Part 2: Internal events at low power and shutdown
- NB/T 20037.5Level 1 probabilistic safety assessment for nuclear power plant applications - Part 5: Earthquake at power
Similar standards
How to Download NB/T 20037.10-2017
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
NB/T 20037.1-2011 — Probabilistic Safety Assessment for Nuclear Power Plant Applications - Part 1: Level 1 PSA for Internal Events At-Power
NB/T 20037.1-2017 — Level 1 probabilistic safety assessment for nuclear power plant applications - Part 1: General requirements
NB/T 20037.2-2021 — Level 1 probabilistic safety assessment for nuclear power plant applications - Part 2: Internal events at low power and shutdown
Secure payment via Stripe
Payments accepted
NB/T 20037.10-2017
$195.00