NB/T 20037.3-2012Probabilistic safety assessment for nuclear power plant applications. Part 3: Flooding (English PDF)
应用于核电厂的概率安全评价 第3部分:水淹
NB/T 20037.3 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| NB/T 20037.3-2021 | Probabilistic safety assessment for nuclear power plant applications - Part 3 : Flooding | Valid |
| NB/T 20037.3-2012 | Probabilistic safety assessment for nuclear power plant applications. Part 3: Flooding | Obsolete |
NB/T 20037.3-2012 is obsolete. It has been replaced by NB/T 20037.3-2021. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for NB/T 20037.3-2012 in 30 minutes.
Issued by
National Energy Administration
Level / Type
Industry · Recommended
Issue date
January 6, 2012
Implementation date
April 6, 2012
Scope
NB/T 20037.3-2012 is the English-translated version of 应用于核电厂的概率安全评价 第3部分:水淹.
NB/T 20037.3-2012 is the Chinese industry standard "Probabilistic safety assessment for nuclear power plant applications. Part 3: Flooding". It was issued on January 6, 2012 by the National Energy Administration, and took effect on April 6, 2012. It is obsolete: it has been replaced by NB/T 20037.3-2021.
Found what you need?
Document preview — NB/T 20037.3-2012
National Standard of the People's Republic of China
Issued by: National Energy Administration
Contents
- Document data
1 Document data
Sector: Energy Industry (industry standard).
Issuing body: National Energy Administration.
Date of issue: 2012-01-06.
Date of implementation: 2012-04-06.
Status: obsolete, replaced by NB/T 20037.3-2021.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Referenced standards
How to Download NB/T 20037.3-2012
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
NB/T 20037.4-2021 — Level 1 probabilistic safety assessment for nuclear power plant applications - Part 4: Internal fire at power
NB/T 20037.2-2012 — Probabilistic safety assessment for nuclear power plant applications. Part 2: Level PSA for internal events at-low power and shutdown
NB/T 20037.4-2013 — Probabilistic safety assessment for nuclear power plant applications. Part 4: Fire
NB/T 20037.3-2012
$345.00