NB/T 20034-2010Regulation for Content of Feasibility Study Report of Nuclear Power Plants (English PDF)
核电厂可行性研究报告内容深度规定
This is a limited preview
Buy now to download the full PDF (28 pages)
Need quotation for your management?
Get a formal quotation for NB/T 20034-2010 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
May 1, 2010
Implementation date
October 1, 2010
Scope
NB/T 20034-2010 is the English-translated version of 核电厂可行性研究报告内容深度规定.
NB/T 20034-2010 is the Chinese standard "Regulation for Content of Feasibility Study Report of Nuclear Power Plants".
Its scope clause reads: This standard specifies requirements for basic work content and report preparation of engineering feasibility study report of nuclear power plants and is the essential basis for report preparation and examination.
This standard is applicable to newly-built, expanded or rebuilt engineering projects of nuclear power plants. Its clauses include general provisions.
Found what you need?
Document preview — NB/T 20034-2010
National Standard of the People's Republic of China
- ICS
- 27.120.10
Issued by: National Energy Administration of the People's Republic of China
Contents
- Foreword i
- Introduction ii
- 1 Scope
- 2 Normative References
- 3 General Provisions
- 4 Preparation Content and Depth of Report
- 5 Attached Drawings to the Report
- 6 Supportive Documents of Report
- Annex A (Normative) Division Principle and Requirements for Volume and Book of Feasibility Study Report
1 Scope
This standard specifies requirements for basic work content and report preparation of engineering feasibility study report of nuclear power plants and is the essential basis for report preparation and examination.
This standard is applicable to newly-built, expanded or rebuilt engineering projects of nuclear power plants.
2 Normative References
The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies.
GB 6249 Regulations for Environmental Radiation Protection of Nuclear Power Plant
HAF 001/01 Application and Issue of Nuclear Power Plant Safety License
HAD 102/09 Ultimate Heat Sink and Directly-related Heat Transfer System of Nuclear Power Plant
HAD 501/02 Physical Protection of Nuclear Facilities
HAF-J 0067 Format and Content of Plant Site Safety Analysis Report for Feasibility Study Stage of Nuclear Power Plants
NEPA-RG1 Content and Format of Environmental Impact Reports for Nuclear Power Plants
HEZONGFA [1995] No. 136
Design Regulation for Occupational Safety and Health of Nuclear Power Plant
WEIFAJIANFA [2002] No.63
Catalogue for Classification of Occupational Hazard Factors
FAGAITOUZI [2006] No. 1325
Methodology and Parameters of Economic Assessment on Construction Projects
Revised No. 24 Decree of Ministry of Water Resources in July 2005
Administrative Regulations on Preparation and Examination of Water and Soil Conservation Scheme for Development and Construction Projects
3 General Provisions
3.1 For newly-built or expanded engineering of nuclear power plants, feasibility study shall be carried out and engineering feasibility study report shall be prepared to provide scientific basis for project decision. The feasibility study report shall be prepared based on authorized preliminary feasibility study report according to The National Electricity Master Plan and National Nuclear Power Development Planning.
3.2
Mature and advanced technology shall be adopted for the engineering construction of nuclear power plant and high-efficient, energy-saving, land-saving, water-saving, material-saving, consumption-reducing and environmental schemes are strongly recommended.
3.3
Engineering feasibility study (including monographic study) of nuclear power plant shall be entrusted to the organization with appropriate qualification; the organization responsible for the study shall be selected in accordance with the relevant national requirements for construction and management of engineering project.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 28 pages — is available in the English PDF.
Referenced standards
Normative references
HAF 001/01 · HAD 102/09 · HAD 501/02
Similar standards
How to Download NB/T 20034-2010
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 6249-2025 — Regulations for environmental radiation protection of nuclear power plants
NB/T 10086-2025 — Regulations for Compiling Energy Conservation Reports for Wind Farm Projects
NB/T 10103-2025 — Technical Specifications for Micro-Site Selection in Wind Farm Projects
Secure payment via Stripe
Payments accepted
NB/T 20034-2010
$365.00