Valid

NB/T 14020.1-2017Shale gas - Tools and equipment - Part 1: Composite bridge plug (English PDF)

页岩气 工具设备 第1部分:复合桥塞

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for NB/T 14020.1-2017 in 30 minutes.

Issued by

NEA

Level / Type

Industry · Recommended

Issue date

March 28, 2017

Implementation date

August 1, 2017

Scope

NB/T 14020.1-2017 is the English-translated version of 页岩气 工具设备 第1部分:复合桥塞.

NB/T 14020.1-2017 opens the recommended Chinese energy industry series on shale gas tools and equipment, and this first part is on the composite bridge plug. It covers the classification and types of the plug, the technical requirements, the test methods, the inspection rules and the marking, packaging, transport and storage.

The part applies to composite bridge plugs used in shale gas wells; plugs used in other oil and gas wells may be handled by reference to it. Its Chinese classification is E14 and its international classification 75.020.

It quotes GB/T 5305, GB/T 20739, GB/T 20970 and SY/T 6327. Issued on 28 March 2017, it has applied since 1 August 2017.

Found what you need?

Document preview — NB/T 14020.1-2017

National Standard of the People's Republic of China

ICS
75.020

Issued by: National Energy Administration of the People's Republic of China

Contents

  • 2 Normative references

2 Normative references

NB/T 14020.1-2017 cites the following standards, which apply in full or in part through the references made to them in its clauses.

GB/T 5305

GB/T 20739

GB/T 20970

SY/T 6327

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download NB/T 14020.1-2017

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 14020.1-2017

$145.00