NB/T 11000-2022Specification for bills of quantities and valuation for onshore wind power projects (English PDF)

陆上风电场工程工程量清单计价规范

Open the NB/T 11000-2022 preview as PDF

Preview — first pages of NB/T 11000-2022 (full document: 239 pages)

This is a limited preview

Buy now to download the full PDF (239 pages)

Issued by

NEA

Level / Type

Industry · Recommended

Issue date

November 4, 2022

Implementation date

March 4, 2023

Scope

NB/T 11000-2022 is the English-translated version of 陆上风电场工程工程量清单计价规范.

NB/T 11000-2022 is the Chinese specification for the bill of quantities and its valuation in onshore wind power projects. It is the commercial rulebook of the trade: the document that fixes how a wind farm is measured, tendered, priced and paid for, and it exists because a wind farm is an unusual construction contract. The turbines themselves are bought, not built, and often supplied free issue by the owner; the civil works are spread over tens of kilometres of access road, foundations and collector cable rather than concentrated on one site; and a large part of the cost is plant hire - the crawler crane that erects the towers is idle whenever the wind blows too hard to lift. A contract that does not say clearly how those are measured and who carries which risk is a contract that ends in dispute. This specification supplies the common language. It defines the commercial terms the parties argue over, from the bill of quantities and the priced bill through the all-in unit rate, work sections and trades, preliminaries, provisional sum, prime cost sum, dayworks and the main contractor's attendance to the health, safety and environmental provisions. It then sets out the preparation of the bill, with separate lists for work sections and trades, for the purchase of equipment and installation materials, for preliminaries and for other items, together with the item coding scheme; and the valuation clause covering the maximum tender price limit, the tender price, the agreement of the contract price, measurement, price adjustment, interim payment, final account, settlement on termination, the handling of disputes and the archiving of records. Its annexes carry the measurement rules and the model tender item lists for each part of a wind farm, from the access roads and foundations to the collector system and the substation. It is the onshore companion to NB/T 10999, which does the same job for offshore projects. It was issued on 4 November 2022 by the National Energy Administration and took effect on 4 March 2023.

Document preview — NB/T 11000-2022

National Standard of the People's Republic of China

ICS
27.180
Classification
P 02

Issued by: National Energy Administration of the PRC

Contents

  • 1 Scope1
  • 2 Normative references1
  • 3 Terms and definitions1
  • 4 General requirements3
  • 5 Preparation of the bill of quantities4
  • 5.1 General requirements4
  • 5.2 Explanatory notes on the preparation of the bill of quantities4
  • 5.3 Bill of quantities for divisional and itemized works4
  • 5.4 Procurement list for equipment and installation materials4
  • 5.5 List of measure items5
  • 5.6 List of other items5
  • 5.7 Coding of bill of quantities items5
  • 6 Bill of quantities valuation8
  • 6.1 General requirements8
  • 6.2 Maximum bid price9
  • 6.3 Tender price9
  • 6.4 Agreement on the contract price10
  • 6.5 Measurement of works11
  • 6.6 Adjustment of the contract price11
  • 6.7 Interim payment of the contract price16
  • 6.8 Completion settlement and payment18
  • 6.9 Settlement and payment of the price on termination of the contract18
  • 6.10 Handling of valuation disputes19
  • 6.11 Valuation records and archiving19
  • 7 Composition and format of the bill of quantities20
  • 7.1 Composition of the bill of quantities20
  • 7.2 Format of the bill of quantities20
  • 8 Composition and format of the bill of quantities valuation20
  • 8.1 Composition of the bill of quantities valuation20
  • 8.2 Format of the bill of quantities valuation21
  • Annex A (normative) Bill of quantities items and calculation rules for civil works22
  • A.1 Earthwork and rock excavation works22
  • A.2 Foundation treatment works25
  • A.3 Masonry works27
  • A.4 Concrete and reinforcement works29
  • A.5 Metal structure works34
  • A.6 Interior and exterior decoration works35
  • A.7 Indoor water supply and drainage, heating, ventilation, lighting and fire protection works41
  • A.8 Outdoor works of the station area44
  • A.9 Road works49
  • Annex B (normative) Bill of quantities items and calculation rules for installation works51
  • B.1 Power generation equipment installation works51
  • B.2 Step-up substation equipment installation works51
  • B.3 Cable and busbar installation works58
  • B.4 Overhead line works60
  • B.5 Earthing installation works63
  • B.6 Station area lighting installation works64
  • B.7 Commissioning and testing works64
  • Annex C (normative) Items and calculation rules for the procurement list of equipment and installation materials67
  • C.1 Procurement of wind farm equipment67
  • C.2 Procurement of step-up substation equipment68
  • C.3 Procurement of other equipment77
  • C.4 Procurement of installation materials80
  • Annex D (normative) List of measure items and calculation rules85
  • D.1 Measure items85
  • Annex E (informative) Tender item list for the wind farm part of the works87
  • E.1 Tender item list for wind farm civil works87
  • E.2 Tender item list for wind farm installation works98
  • Annex F (informative) Tender item list for the collector line part of the works101
  • F.1 Tender item list for collector overhead line civil works101
  • F.2 Tender item list for collector overhead line installation works104
  • F.3 Tender item list for collector cable line civil works107
  • F.4 Tender item list for collector cable line installation works109
  • Annex G (informative) Tender item list for the step-up substation part of the works112
  • G.1 Tender item list for step-up substation civil works112
  • G.2 Tender item list for step-up substation installation works148
  • Annex H (informative) Tender item list for the procurement of equipment and installation materials158
  • H.1 Tender item list for the procurement of wind farm equipment and installation materials158
  • H.2 Tender item list for the procurement of collector line equipment and installation materials160
  • H.3 Tender item list for the procurement of step-up substation equipment and installation materials164
  • Annex I (informative) Tender item list for measure items184
  • I.1 Tender item list for measure items184
  • Annex J (normative) Format of the bill of quantities186
  • J.1 Cover sheet186
  • J.2 Title page187
  • J.3 Explanatory notes188
  • J.4 Bill of quantities for divisional and itemized works189
  • J.5 Procurement list for equipment and installation materials189
  • J.6 List of measure items190
  • J.7 List of other items190
  • J.8 Detailed schedule of provisional sums191
  • J.9 Schedule of provisional unit prices for equipment and materials191
  • J.10 Schedule of provisional prices for specialist works192
  • J.11 Daywork schedule192
  • J.12 Schedule of the content of main contractor attendance services193
  • J.13 Schedule of the content of unloading and storage of equipment and materials supplied by the employer193
  • J.14 Schedule of materials priced by the tenderer194
  • J.15 Schedule of equipment and materials supplied by the employer194
  • Annex K (normative) Format of the maximum bid price195
  • K.1 Cover sheet195
  • K.2 Title page196
  • K.3 Explanatory notes197
  • K.4 Summary schedule of the maximum bid price198
  • K.5 Summary schedule of the maximum bid price for civil and installation works198
  • K.6 Summary schedule of the maximum bid price for the procurement of equipment and installation materials199
  • K.7 Valuation schedule for the bill of quantities of divisional and itemized works199
  • K.8 Valuation schedule for the procurement list of equipment and installation materials200
  • K.9 Valuation schedule for the list of measure items200
  • K.10 Valuation schedule for the list of other items201
  • K.11 Detailed schedule of provisional sums201
  • K.12 Schedule of provisional unit prices for equipment and materials202
  • K.13 Schedule of provisional prices for specialist works202
  • K.14 Daywork schedule203
  • K.15 Valuation schedule for main contractor attendance fees203
  • K.16 Valuation schedule for the unloading and storage fees of equipment and materials supplied by the employer204
  • K.17 Analysis schedule of all-in unit prices204
  • K.18 Schedule of main material prices205
  • Annex L (normative) Format of the tender price206
  • L.1 Cover sheet206
  • L.2 Title page207
  • L.3 Explanatory notes208
  • L.4 Summary schedule of the tender price209
  • L.5 Summary schedule of the tender price for civil and installation works209
  • L.6 Summary schedule of the tender price for the procurement of equipment and installation materials210
  • L.7 Valuation schedule for the bill of quantities of divisional and itemized works210
  • L.8 Valuation schedule for the procurement list of equipment and installation materials211
  • L.9 Valuation schedule for the list of measure items211
  • L.10 Valuation schedule for the list of other items212
  • L.11 Detailed schedule of provisional sums212
  • L.12 Schedule of provisional unit prices for equipment and materials213
  • L.13 Schedule of provisional prices for specialist works213
  • L.14 Daywork schedule214
  • L.15 Valuation schedule for main contractor attendance fees214
  • L.16 Valuation schedule for the unloading and storage fees of equipment and materials supplied by the employer215
  • L.17 Analysis schedule of all-in unit prices215
  • L.18 Schedule of materials priced by the tenderer216
  • Annex M (normative) Format of the completion settlement statement217
  • M.1 Cover sheet217
  • M.2 Title page218
  • M.3 Explanatory notes219
  • M.4 Summary schedule of the completion settlement220
  • M.5 Summary schedule of the completion settlement for civil and installation works220
  • M.6 Summary schedule of the completion settlement for the procurement of equipment and installation materials221
  • M.7 Valuation schedule for the bill of quantities of divisional and itemized works221
  • M.8 Valuation schedule for the procurement list of equipment and installation materials222
  • M.9 Analysis schedule of all-in unit prices222
  • M.10 Valuation schedule for the list of measure items223
  • M.11 Valuation schedule for the list of other items223
  • M.12 Schedule for the confirmation of provisional prices and the valuation of price differences for equipment and materials224
  • M.13 Settlement schedule for specialist works224
  • M.14 Daywork settlement schedule225
  • M.15 Valuation schedule for main contractor attendance fees225
  • M.16 Valuation schedule for the unloading and storage fees of equipment and materials supplied by the employer226
  • M.17 Summary valuation schedule for variations, site instructions and claims226
  • M.18 Application (approval) form for variation costs227
  • M.19 Application (approval) form for cost claims228
  • M.20 Application (approval) form for payment of works229

Foreword

This document was issued on 4 November 2022 by the National Energy Administration of the PRC and takes effect on 4 March 2023.

It is a NB/T standard: recommended rather than compulsory, but it is the text a Chinese reviewer applies when assessing a submission.

It is classified under ICS 27.180, Chinese classification P 02.

Standard identification

NB/T 11000-2022 is an energy sector standard of the People's Republic of China, issued by the National Energy Administration.

The cover carries the official English title Specification for bills of quantities and valuation for onshore wind power projects, printed under the Chinese title.

The standard is classified under ICS 27.180 and under the Chinese classification code CCS P 02.

It was released on 4 November 2022 and came into force on 4 March 2023.

The cover shows no replacement line, so this edition does not supersede an earlier standard: NB/T 11000 is a first edition.

The front matter is numbered in Roman numerals and runs to seven pages of contents, followed by a Foreword on page VIII and an Introduction on page IX.

The body of the standard is numbered in Arabic numerals and runs to at least page 229, the last page listed in the table of contents.

The document is built around eight numbered clauses followed by thirteen annexes, lettered A to M, of which A, B, C, D, J, K, L and M are normative and E, F, G, H and I are informative.

The subject matter is the pricing framework of onshore wind farm projects: how the bill of quantities is drawn up, coded, measured, priced at tender stage and settled at completion.

Figures and tables

The standard contains nine numbered figures. Figure 1, Composition of the item code for the bill of quantities of divisional and itemized works, appears on page 5 within clause 5.7.

The remaining eight figures are the cover sheets and title pages of the four documents governed by the standard: Figures J.1 and J.2 for the bill of quantities on pages 186 and 187, Figures K.1 and K.2 for the maximum bid price on pages 195 and 196, Figures L.1 and L.2 for the tender price on pages 206 and 207, and Figures M.1 and M.2 for the completion settlement statement on pages 217 and 218.

The tables are far more numerous and carry the substance of the annexes: Tables 1 and 2 in the main text on pages 6 and 7, nine tables in Annex A, seven in Annex B, four in Annex C, one in Annex D, and one for each tender item list in Annexes E to I.

The form annexes contribute thirteen tables in Annex J, sixteen in Annex K, sixteen in Annex L and eighteen in Annex M, so that every schedule required for pricing, tendering and settlement has a printed model.

1 Scope

NB/T 11000-2022 is the Chinese specification for the bill of quantities and its valuation in onshore wind power projects. It is the commercial rulebook of the trade: the document that fixes how a wind farm is measured, tendered, priced and paid for, and it exists because a wind farm is an unusual construction contract. The turbines themselves are bought, not built, and often supplied free issue by the owner; the civil works are spread over tens of kilometres of access road, foundations and collector cable rather than concentrated on one site; and a large part of the cost is plant hire - the crawler crane that erects the towers is idle whenever the wind blows too hard to lift. A contract that does not say clearly how those are measured and who carries which risk is a contract that ends in dispute. This specification supplies the common language. It defines the commercial terms the parties argue over, from the bill of quantities and the priced bill through the all-in unit rate, work sections and trades, preliminaries, provisional sum, prime cost sum, dayworks and the main contractor's attendance to the health, safety and environmental provisions. It then sets out the preparation of the bill, with separate lists for work sections and trades, for the purchase of equipment and installation materials, for preliminaries and for other items, together with the item coding scheme; and the valuation clause covering the maximum tender price limit, the tender price, the agreement of the contract price, measurement, price adjustment, interim payment, final account, settlement on termination, the handling of disputes and the archiving of records. Its annexes carry the measurement rules and the model tender item lists for each part of a wind farm, from the access roads and foundations to the collector system and the substation. It is the onshore companion to NB/T 10999, which does the same job for offshore projects. It was issued on 4 November 2022 by the National Energy Administration and took effect on 4 March 2023.

Clause 1, Scope, occupies page 1 of the standard, immediately after the front matter.

As the title on the cover states, the document addresses bills of quantities and their valuation for onshore wind power projects, that is wind farms built on land as opposed to offshore installations.

2 Normative references

Clause 2, Normative references, also begins on page 1 and lists the documents that are indispensable for the application of this standard.

3 Terms and definitions

Clause 3, Terms and definitions, starts on page 1 and runs to page 2, ahead of clause 4 on page 3.

The vocabulary it establishes underpins the whole document, since clauses 5 to 8 and the annexes all rely on a consistent naming of bill items, measure items, provisional sums and settlement documents.

4 General requirements

Clause 4, General requirements, occupies page 3 and sets the overall rules that apply before the detailed provisions of the following clauses.

5 Preparation of the bill of quantities

Clause 5, Preparation of the bill of quantities, runs from page 4 to page 8 and is divided into seven subclauses.

5.1 General requirements, page 4, states the conditions under which the bill of quantities is compiled.

5.2 Explanatory notes on the preparation of the bill of quantities, page 4, covers the statement that accompanies the bill and explains how it was drawn up.

5.3 Bill of quantities for divisional and itemized works, page 4, deals with the list of measured work items broken down by division and sub-item.

5.4 Procurement list for equipment and installation materials, page 4, covers the separate list used for plant and for materials of an installation nature.

5.5 List of measure items, page 5, covers the items that are not permanent works but are needed to carry them out.

5.6 List of other items, page 5, covers provisional sums, provisional prices, dayworks and main contractor attendance.

5.7 Coding of bill of quantities items, page 5, establishes the item numbering system; it is supported by Figure 1, Composition of the item code for the bill of quantities of divisional and itemized works, on page 5.

Two tables belong to this subclause: Table 1, Third-level and fourth-level engineering codes, on page 6, and Table 2, Item classification codes, on page 7.

6 Bill of quantities valuation

Clause 6, Bill of quantities valuation, is the longest clause of the main text, running from page 8 to page 20 across eleven subclauses.

6.1 General requirements, page 8, sets out the common rules of valuation.

6.2 Maximum bid price, page 9, covers the ceiling price fixed by the employer for the tender.

6.3 Tender price, page 9, covers the price submitted by the tenderer.

6.4 Agreement on the contract price, page 10, covers how the agreed contract price is established.

6.5 Measurement of works, page 11, covers the measurement of the executed works.

6.6 Adjustment of the contract price, pages 11 to 16, is the largest subclause of the standard and deals with the circumstances in which the contract price is adjusted.

6.7 Interim payment of the contract price, pages 16 to 18, covers payments made during the course of the works.

6.8 Completion settlement and payment, page 18, covers the final account drawn up when the works are completed.

6.9 Settlement and payment of the price on termination of the contract, page 18, covers the case in which the contract is brought to an end before completion.

6.10 Handling of valuation disputes, page 19, covers disagreements arising from the valuation of the works.

6.11 Valuation records and archiving, page 19, covers the documents produced during valuation and the way they are filed.

7 Composition and format of the bill of quantities

Clause 7, Composition and format of the bill of quantities, occupies page 20 and has two subclauses.

7.1 Composition of the bill of quantities, page 20, states the parts of which a complete bill of quantities is made up.

7.2 Format of the bill of quantities, page 20, refers to the forms reproduced in normative Annex J.

8 Composition and format of the bill of quantities valuation

Clause 8, Composition and format of the bill of quantities valuation, runs from page 20 to page 21 and closes the main text.

8.1 Composition of the bill of quantities valuation, page 20, states the parts of which a valuation document is made up.

8.2 Format of the bill of quantities valuation, page 21, refers to the forms reproduced in normative Annexes K, L and M, respectively for the maximum bid price, the tender price and the completion settlement statement.

Annex A Bill of quantities items and calculation rules for civil works (normative)

Annex A is normative and covers the bill of quantities items and the calculation rules for civil works, from page 22 to page 51, in nine subclauses each supported by a table of the same number.

A.1 Earthwork and rock excavation works, page 22, with Table A.1 on page 22.

A.2 Foundation treatment works, page 25, with Table A.2 on page 25.

A.3 Masonry works, page 27, with Table A.3 on page 27.

A.4 Concrete and reinforcement works, page 29, with Table A.4 on page 29.

A.5 Metal structure works, page 34, with Table A.5 on page 34.

A.6 Interior and exterior decoration works, page 35, with Table A.6 on page 36.

A.7 Indoor water supply and drainage, heating, ventilation, lighting and fire protection works, page 41, with Table A.7 on page 41.

A.8 Outdoor works of the station area, page 44, with Table A.8 on page 44.

A.9 Road works, page 49, with Table A.9 on page 49.

Annex B Bill of quantities items and calculation rules for installation works (normative)

Annex B is normative and covers the bill of quantities items and the calculation rules for installation works, from page 51 to page 67, in seven subclauses each supported by a table.

B.1 Power generation equipment installation works, page 51, with Table B.1 on page 51.

B.2 Step-up substation equipment installation works, page 51, with Table B.2 on page 52.

B.3 Cable and busbar installation works, page 58, with Table B.3 on page 58.

B.4 Overhead line works, page 60, with Table B.4 on page 60.

B.5 Earthing installation works, page 63, with Table B.5 on page 63.

B.6 Station area lighting installation works, page 64, with Table B.6 on page 64.

B.7 Commissioning and testing works, page 64, with Table B.7 on page 64.

Annex C Items and calculation rules for the procurement of equipment and installation materials (normative)

Annex C is normative and covers the items and calculation rules of the procurement list for equipment and installation materials, from page 67 to page 85, in four subclauses each supported by a table.

C.1 Procurement of wind farm equipment, page 67, with Table C.1 on page 67.

C.2 Procurement of step-up substation equipment, page 68, with Table C.2 on page 68; at nine pages it is the largest procurement group of the annex.

C.3 Procurement of other equipment, page 77, with Table C.3 on page 77.

C.4 Procurement of installation materials, page 80, with Table C.4 on page 80.

Annex D List of measure items and calculation rules (normative)

Annex D is normative and covers the list of measure items together with their calculation rules, on pages 85 and 86.

D.1 Measure items, page 85, with Table D.1 on page 85.

Annexes E to I Tender item lists (informative)

Annexes E to I are informative and give model tender item lists for the four parts into which an onshore wind farm contract is usually split, plus the measure items; together they run from page 87 to page 186.

Annex E, Tender item list for the wind farm part of the works, page 87.

E.1 Tender item list for wind farm civil works, page 87, with Table E.1 on page 87.

E.2 Tender item list for wind farm installation works, page 98, with Table E.2 on page 98.

Annex F, Tender item list for the collector line part of the works, page 101.

F.1 Tender item list for collector overhead line civil works, page 101, with Table F.1 on page 101.

F.2 Tender item list for collector overhead line installation works, page 104, with Table F.2 on page 104.

F.3 Tender item list for collector cable line civil works, page 107, with Table F.3 on page 107.

F.4 Tender item list for collector cable line installation works, page 109, with Table F.4 on page 110.

Annex G, Tender item list for the step-up substation part of the works, page 112.

G.1 Tender item list for step-up substation civil works, page 112, with Table G.1 on page 112; at thirty-six pages it is the longest single item list of the standard.

G.2 Tender item list for step-up substation installation works, page 148, with Table G.2 on page 148.

Annex H, Tender item list for the procurement of equipment and installation materials, page 158.

H.1 Tender item list for the procurement of wind farm equipment and installation materials, page 158, with Table H.1 on page 158.

H.2 Tender item list for the procurement of collector line equipment and installation materials, page 160, with Table H.2 on page 160.

H.3 Tender item list for the procurement of step-up substation equipment and installation materials, page 164, with Table H.3 on page 164.

Annex I, Tender item list for measure items, page 184, with subclause I.1 and Table I.1 on page 184.

Annex J Format of the bill of quantities (normative)

Annex J is normative and reproduces the complete set of forms that make up a bill of quantities, from page 186 to page 195, in fifteen subclauses.

J.1 Cover sheet, page 186, illustrated by Figure J.1, Cover sheet of the bill of quantities, on page 186.

J.2 Title page, page 187, illustrated by Figure J.2, Title page of the bill of quantities, on page 187.

J.3 Explanatory notes, page 188, with Table J.1, Explanatory notes on the preparation of the bill of quantities, on page 188.

J.4 Bill of quantities for divisional and itemized works, page 189, with Table J.2 on page 189.

J.5 Procurement list for equipment and installation materials, page 189, with Table J.3 on page 189.

J.6 List of measure items, page 190, with Table J.4 on page 190.

J.7 List of other items, page 190, with Table J.5 on page 190.

J.8 Detailed schedule of provisional sums, page 191, with Table J.6 on page 191.

J.9 Schedule of provisional unit prices for equipment and materials, page 191, with Table J.7 on page 191.

J.10 Schedule of provisional prices for specialist works, page 192, with Table J.8 on page 192.

J.11 Daywork schedule, page 192, with Table J.9 on page 192.

J.12 Schedule of the content of main contractor attendance services, page 193, with Table J.10 on page 193.

J.13 Schedule of the content of unloading and storage of equipment and materials supplied by the employer, page 193, with Table J.11 on page 193.

J.14 Schedule of materials priced by the tenderer, page 194, with Table J.12 on page 194.

J.15 Schedule of equipment and materials supplied by the employer, page 194, with Table J.13 on page 194.

Annex K Format of the maximum bid price (normative)

Annex K is normative and reproduces the forms of the maximum bid price, from page 195 to page 206, in eighteen subclauses.

K.1 Cover sheet, page 195, illustrated by Figure K.1 on page 195, and K.2 Title page, page 196, illustrated by Figure K.2 on page 196.

K.3 Explanatory notes, page 197, with Table K.1, Explanatory notes on the preparation of the maximum bid price, on page 197.

K.4 Summary schedule of the maximum bid price, page 198, with Table K.2 on page 198.

K.5 Summary schedule of the maximum bid price for civil and installation works, page 198, with Table K.3 on page 198.

K.6 Summary schedule of the maximum bid price for the procurement of equipment and installation materials, page 199, with Table K.4 on page 199.

K.7 Valuation schedule for the bill of quantities of divisional and itemized works, page 199, with Table K.5 on page 199.

K.8 Valuation schedule for the procurement list of equipment and installation materials, page 200, with Table K.6 on page 200.

K.9 Valuation schedule for the list of measure items, page 200, with Table K.7 on page 200.

K.10 Valuation schedule for the list of other items, page 201, with Table K.8 on page 201.

K.11 Detailed schedule of provisional sums, page 201, with Table K.9 on page 201.

K.12 Schedule of provisional unit prices for equipment and materials, page 202, with Table K.10 on page 202.

K.13 Schedule of provisional prices for specialist works, page 202, with Table K.11 on page 202.

K.14 Daywork schedule, page 203, with Table K.12 on page 203.

K.15 Valuation schedule for main contractor attendance fees, page 203, with Table K.13 on page 203.

K.16 Valuation schedule for the unloading and storage fees of equipment and materials supplied by the employer, page 204, with Table K.14 on page 204.

K.17 Analysis schedule of all-in unit prices, page 204, with Table K.15 on page 204.

K.18 Schedule of main material prices, page 205, with Table K.16 on page 205.

Annex L Format of the tender price (normative)

Annex L is normative and reproduces the forms of the tender price, from page 206 to page 217, in eighteen subclauses that mirror those of Annex K.

L.1 Cover sheet, page 206, illustrated by Figure L.1 on page 206, and L.2 Title page, page 207, illustrated by Figure L.2 on page 207.

L.3 Explanatory notes, page 208, with Table L.1, Explanatory notes on the preparation of the tender price, on page 208.

L.4 Summary schedule of the tender price, page 209, with Table L.2 on page 209.

L.5 Summary schedule of the tender price for civil and installation works, page 209, with Table L.3 on page 209.

L.6 Summary schedule of the tender price for the procurement of equipment and installation materials, page 210, with Table L.4 on page 210.

L.7 Valuation schedule for the bill of quantities of divisional and itemized works, page 210, with Table L.5 on page 210.

L.8 Valuation schedule for the procurement list of equipment and installation materials, page 211, with Table L.6 on page 211.

L.9 Valuation schedule for the list of measure items, page 211, with Table L.7 on page 211.

L.10 Valuation schedule for the list of other items, page 212, with Table L.8 on page 212.

L.11 Detailed schedule of provisional sums, page 212, with Table L.9 on page 212.

L.12 Schedule of provisional unit prices for equipment and materials, page 213, with Table L.10 on page 213.

L.13 Schedule of provisional prices for specialist works, page 213, with Table L.11 on page 213.

L.14 Daywork schedule, page 214, with Table L.12 on page 214.

L.15 Valuation schedule for main contractor attendance fees, page 214, with Table L.13 on page 214.

L.16 Valuation schedule for the unloading and storage fees of equipment and materials supplied by the employer, page 215, with Table L.14 on page 215.

L.17 Analysis schedule of all-in unit prices, page 215, with Table L.15 on page 215.

L.18 Schedule of materials priced by the tenderer, page 216, with Table L.16 on page 216.

Annex M Format of the completion settlement statement (normative)

Annex M is normative and reproduces the forms of the completion settlement statement, from page 217 to page 229, in twenty subclauses; it closes the standard.

M.1 Cover sheet, page 217, illustrated by Figure M.1 on page 217, and M.2 Title page, page 218, illustrated by Figure M.2 on page 218.

M.3 Explanatory notes, page 219, with Table M.1, Explanatory notes on the preparation of the completion settlement, on page 219.

M.4 Summary schedule of the completion settlement, page 220, with Table M.2 on page 220.

M.5 Summary schedule of the completion settlement for civil and installation works, page 220, with Table M.3 on page 220.

M.6 Summary schedule of the completion settlement for the procurement of equipment and installation materials, page 221, with Table M.4 on page 221.

M.7 Valuation schedule for the bill of quantities of divisional and itemized works, page 221, with Table M.5 on page 221.

M.8 Valuation schedule for the procurement list of equipment and installation materials, page 222, with Table M.6 on page 222.

M.9 Analysis schedule of all-in unit prices, page 222, with Table M.7 on page 222.

M.10 Valuation schedule for the list of measure items, page 223, with Table M.8 on page 223.

M.11 Valuation schedule for the list of other items, page 223, with Table M.9 on page 223.

M.12 Schedule for the confirmation of provisional prices and the valuation of price differences for equipment and materials, page 224, with Table M.10 on page 224.

M.13 Settlement schedule for specialist works, page 224, with Table M.11 on page 224.

M.14 Daywork settlement schedule, page 225, with Table M.12 on page 225.

M.15 Valuation schedule for main contractor attendance fees, page 225, with Table M.13 on page 225.

M.16 Valuation schedule for the unloading and storage fees of equipment and materials supplied by the employer, page 226, with Table M.14 on page 226.

M.17 Summary valuation schedule for variations, site instructions and claims, page 226, with Table M.15 on page 226.

M.18 Application (approval) form for variation costs, page 227, with Table M.16 on page 227.

M.19 Application (approval) form for cost claims, page 228, with Table M.17 on page 228.

M.20 Application (approval) form for payment of works, page 229, with Table M.18 on page 229.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 239 pages — is available in the English PDF.

Similar standards

How to Buy NB/T 11000-2022

  1. 1Add to cart. Click the "Buy NB/T 11000-2022" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
239 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 11000-2022

$4,040.00

$3,435.00for partners