Valid

NB/T 10134-2019Code for Core Collection and Filing of Hydropower Projects (English PDF)

水电工程岩芯收集与归档规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (26 pages)

Need quotation for your management?

Get a formal quotation for NB/T 10134-2019 in 30 minutes.

Issued by

NEA

Level / Type

Industry · Recommended

Issue date

June 4, 2019

Implementation date

October 1, 2019

Scope

NB/T 10134-2019 is the English-translated version of 水电工程岩芯收集与归档规范.

NB/T 10134-2019 is a recommended Chinese energy industry standard governing the collection and the filing of drill cores in hydropower projects. Its subject is the whole handling chain: collecting the cores, sorting them, and filing them in the project archive.

The international classification places it with hydraulic energy engineering, alongside the survey and design rules of hydropower schemes. It works with GB/T 11821, NB/T 35028, NB/T 35115, DL/T 1396, DA/T 38 and DA/T 54, the last two coming from the archival field. Issued on 4 June 2019, it has applied since 1 October 2019.

Found what you need?

Document preview — NB/T 10134-2019

National Standard of the People's Republic of China

ICS
27.140

Issued by: National Energy Administration of the People's Republic of China

Contents

  • 2 Normative references

2 Normative references

NB/T 10134-2019 cites the following standards, which apply in full or in part through the references made to them in its clauses.

GB/T 11821

NB/T 35028

NB/T 35115

DL/T 1396

DA/T 38

DA/T 54

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 26 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download NB/T 10134-2019

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
26 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 10134-2019

$700.00