MT 820-1999Coal mine belt conveyor technical conditions (English PDF)

煤矿井下用带式输送机技术条件

Preview PDF

MT 820 | Evolution and historical versions

Std IDTitleStatus
MT 820-2006Belt conveyor for coal mines. Technical specificationValid
MT 820-1999Coal mine belt conveyor technical conditionsObsolete

MT 820-1999 is obsolete. It has been replaced by MT 820-2006. This page sells the obsolete edition, for projects and contracts that still cite it.

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for MT 820-1999 in 30 minutes.

Issued by

National Mine Safety Administration

Level / Type

National · Mandatory

Issue date

June 2, 1999

Implementation date

October 1, 1999

Scope

MT 820-1999 is the English-translated version of 煤矿井下用带式输送机技术条件.

MT 820-1999 is the Chinese industry standard "Coal mine belt conveyor technical conditions". It was issued on June 2, 1999 by the National Mine Safety Administration, and took effect on October 1, 1999. It is obsolete: it has been replaced by MT 820-2006.

Found what you need?

Document preview — MT 820-1999

National Standard of the People's Republic of China

Issued by: National Mine Safety Administration

Contents

  • Document data
1 Document data

Sector: Coal (industry standard).

Issuing body: National Mine Safety Administration.

Date of issue: 1999-06-02.

Date of implementation: 1999-10-01.

Status: obsolete, replaced by MT 820-2006.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

Referenced standards

How to Download MT 820-1999

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

MT 820-1999

$105.00