Withdrawn

JT 556-2004Technical requirements of lightningproof and earthing in the port (English PDF)

港口防雷与接地技术要求

Preview PDF

JT 556 | Evolution and historical versions

Std IDTitleStatus
JT 556-2004Technical requirements of lightningproof and earthing in the portObsolete

JT 556-2004 is obsolete. This page sells the obsolete edition, for projects and contracts that still cite it.

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for JT 556-2004 in 30 minutes.

Issued by

MOC

Level / Type

National · Mandatory

Issue date

June 3, 2004

Implementation date

September 1, 2004

Scope

JT 556-2004 is the English-translated version of 港口防雷与接地技术要求.

JT 556-2004 is the Chinese industry standard "Technical requirements of lightningproof and earthing in the port". It was issued on June 3, 2004 by MOC, and took effect on September 1, 2004. It is obsolete: it has been withdrawn (abolished on August 26, 2025).

Found what you need?

Document preview — JT 556-2004

National Standard of the People's Republic of China

Issued by: MOC

Contents

  • Document data
1 Document data

Sector: Highway & Transport (industry standard).

Issuing body: MOC.

Date of issue: 2004-06-03.

Date of implementation: 2004-09-01.

Status: obsolete, withdrawn on 2025-08-26.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

Referenced standards

How to Download JT 556-2004

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

JT 556-2004

$355.00