Valid

JJF 1741-2019Calibration Specification for Surge Simulators (English PDF)

浪涌(冲击)模器校准规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (36 pages)

Need quotation for your management?

Get a formal quotation for JJF 1741-2019 in 30 minutes.

Issued by

State Administration for Market Regulation

Level / Type

National · Mandatory

Issue date

January 1, 2019

Implementation date

December 27, 2019

Scope

JJF 1741-2019 is the English-translated version of 浪涌(冲击)模器校准规范.

JJF 1741-2019 is the Chinese standard "Calibration Specification for Surge Simulators".

Found what you need?

Document preview — JJF 1741-2019

National Standard of the People's Republic of China

ICS
17.220

Contents

  • Introduction (II)
  • 1 Scope (1)
  • 2 Reference documents (1)
  • 3 Terms and measurement units (1)
  • 3.1 Surge (Shock) (1)
  • 3.2 Front time (1)
  • 3.3 Duration (1)
  • 3.4 Residual surge (impact) voltage(2)
  • 3.5 Undesired surge (impact) voltage(2)
  • 4 Overview (2)
  • 5 Metering characteristics (4)
  • 5.1 Surge generator (4)
  • 5.2 Surge generator connected to power line coupling and decoupling network (4)
  • 5.3 Surge generator connected to asymmetric interconnection line coupling and decoupling network (6)
  • 5.4 Surge generator connected to symmetric interconnection line coupling and decoupling network (7)
  • 5.5 Communication surge generator (8)
  • 5.6 Communication surge generator coupling and decoupling network (9)
  • 6 Calibration conditions (9)
  • 6.1 Environmental conditions (9)
  • 6.2 Measurement standards and other equipment (9)
  • 7 Calibration items and calibration methods (10)
  • 7.1 Calibration of surge generator (11)
  • 7.2 Calibration of the coupling and decoupling network of the surge generator connected to the power line (13)
  • 7.3 Calibration of coupling and decoupling network of surge generator connected to asymmetric interconnection (16)
  • 7.4 Calibration of coupling and decoupling network of surge generator connected to symmetric interconnection (17)
  • 7.5 Calibration of communication surge generator (18)
  • 7.6 Calibration of the coupling and decoupling network of the communication surge generator (19)
  • 8 Calibration results (20)
  • 9 Re-calibration interval (20)
  • Appendix A Original Record Format (21)
  • Appendix B. Internal page format of calibration certificate (33)
  • Appendix C Calibration Uncertainty Evaluation Examples of Major Items (44)

1 Scope (1)

2 Reference documents (1)

3 Terms and measurement units (1)

3.1 Surge (Shock) (1)

3.2 Front time (1)

3.3 Duration (1)

3.4 Residual surge (impact) voltage(2)

3.5 Undesired surge (impact) voltage(2)

4 Overview (2)

5 Metering characteristics (4)

5.1 Surge generator (4)

5.2 Surge generator connected to power line coupling and decoupling network (4)

5.3 Surge generator connected to asymmetric interconnection line coupling and decoupling network (6)

5.4 Surge generator connected to symmetric interconnection line coupling and decoupling network (7)

5.5 Communication surge generator (8)

5.6 Communication surge generator coupling and decoupling network (9)

6 Calibration conditions (9)

6.1 Environmental conditions (9)

6.2 Measurement standards and other equipment (9)

7 Calibration items and calibration methods (10)

7.1 Calibration of surge generator (11)

7.2 Calibration of the coupling and decoupling network of the surge generator connected to the power line (13)

7.3 Calibration of coupling and decoupling network of surge generator connected to asymmetric interconnection (16)

7.4 Calibration of coupling and decoupling network of surge generator connected to symmetric interconnection (17)

7.5 Calibration of communication surge generator (18)

7.6 Calibration of the coupling and decoupling network of the communication surge generator (19)

8 Calibration results (20)

9 Re-calibration interval (20)

Appendix A Original Record Format (21)

Appendix B. Internal page format of calibration certificate (33)

Appendix C Calibration Uncertainty Evaluation Examples of Major Items (44)

Introduction

This specification is based on JJF 1071-2010 "Rules for the Compilation of National Metrology and Calibration Specifications", JJF 1059.1-2012 "Measurement the requirements in "Evaluation and Expression of Uncertainty of Measurement" shall be compiled.

This specification refers to GB/T 17626.5 "Electromagnetic compatibility test and measurement technology surge (impact) immunity test Test" and IEC 61000-4-5:2014 "Electromagnetic compatibility test and measurement technology surge (impact) immunity test" Relevant clauses in the this specification is released for the first time.

Surge (impact) simulator calibration specification

1 Scope

This specification applies to surge (impact) resistance in accordance with GB/T 17626.5 "Electromagnetic compatibility test and measurement technology" Disturbance Test" and IEC 61000-4-5:2014 "Electromagnetic Compatibility Test and Measurement Technology Surge (Impact) Immunity the calibration of the surge (impact) generator and coupling and decoupling network required in the "Degree Test" is also suitable for electromagnetic compatibility immunity Calibration of the surge (impact) simulator part of the comprehensive test system.

2 Reference documents this specification refers to the following documents.

GB/T 17626.5 Electromagnetic compatibility test and measurement technology surge (impact) immunity test IEC 61000-4-5:2014 Electromagnetic compatibility test and measurement technology surge (impact) immunity test (Electromagneticcompatibility-Testingandmeasurementtechniques-Surgeimmunity test) for dated reference documents, only the dated version applies to this specification; for undated references the latest version (including all amendments) is applicable to this specification.

3 Terms and units of measurement the following terms and definitions defined in GB/T 17626.5 apply to this code.

3.1 Surge (impact) surge A transient wave of current, voltage or power transmitted along a line or circuit, which is characterized by a rapid rise first and then a slow decline.

3.2 Fronttime

The wavefront time of the surge (impact) voltage is a virtual parameter, defined as two points. 30% peak and 90% peak the corresponding time interval between 1.67 times, the unit is µs.

The wavefront time of the surge (impact) current is a virtual parameter, defined as two points. 10% peak and 90% peak 1.25 times of the time interval corresponding to between, the unit is µs.

3.3 duration

The duration of surge (impact) voltage is that the surge (impact) voltage rises to 50% peak value and drops to 50% the time interval between the two peak points, in µs.

The duration of surge (impact) current (differential mode) is a virtual parameter, defined as surge (impact) current 1.18 times the corresponding time interval between the two points rising to 50% peak and falling to 50% peak, the unit is µs.

The duration of surge (impact) current (common mode) is a virtual parameter, defined as surge (impact) current 1.04 times the corresponding time interval between the two points rising to 50% peak and falling to 50% peak, the unit is µs.

The short-circuit current duration of a surge simulator used for unshielded outdoor symmetrical communication lines is defined as surge (impact) current the time interval between the two points when the flow rises to 50% peak value and when it drops to 50% peak value, the unit is µs.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 36 pages — is available in the English PDF.

How to Download JJF 1741-2019

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
36 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

JJF 1741-2019

$590.00