JJF 1435-2013Examination Specification for China Metrological Certificate. Water Meters (English PDF)
水表制造计量器具许可考核必备条件
This is a limited preview
Buy now to download the full PDF (10 pages)
Need quotation for your management?
Get a formal quotation for JJF 1435-2013 in 30 minutes.
Issued by
General Administration of Quality Supervision, Inspection and Quarantine
Level / Type
National · Mandatory
Issue date
October 25, 2013
Implementation date
January 25, 2014
Scope
JJF 1435-2013 is the English-translated version of 水表制造计量器具许可考核必备条件.
JJF 1435-2013 is the Chinese standard "Examination Specification for China Metrological Certificate. Water Meters". Issued on 2013-10-25, in force from 2014-01-25.
Found what you need?
Document preview — JJF 1435-2013
Contents
- Introduction (II)
- 1 Scope (1)
- 2. References (1)
- 3 Production facilities (1)
- 3.1 Production equipment (1)
- 3.2 Process Equipment (1)
- 3.3 Testing equipment (2)
- 4 Factory inspection condition (3)
- 4.1 Examination place, environment and test medium (3)
- 4.2 Factory inspection staff (3)
- 4.3 Test basis (4)
- 4.4 Factory inspection equipment (4)
- 5 Technical staff (6)
1 Scope (1)
2 References (1)
3 Production facilities (1)
3.1 Production equipment (1)
3.2 Process Equipment (1)
3.3 Testing equipment (2)
4 Factory inspection condition (3)
4.1 Examination place, environment and test medium (3)
4.2 Factory inspection staff (3)
4.3 Test basis (4)
4.4 Factory inspection equipment (4)
5 Technical staff (6)
Safety Requirements 6 (6)
7 Other requirements (6)
7.1 Plant area (6)
7.2 Plant ownership and use (6)
Appendix A assessment record sheet (7)
Introduction
In order to regulate water meter measurement equipment manufacturing license assessment work to ensure that scientific assessment work, objective, fair and public Positive and effective, according to "manufacture and repair of measuring instruments license supervision and management measures" and "new measurement instruments management Approach "metrology regulations, development of this specification.
This specification is based on the assessment of measurement equipment manufacturing license requirements, combined with our water meter production industry status and management needs Demand for the former State Quality and Technical Supervision, "water meter manufacturing measurement apparatus permits evaluation Prerequisites" file (Zhi Jijian Board amount [2000] No. 117) be amended. This specification applies to the meter manufacturer's test measurement equipment manufacturing license Nuclear, effective review and daily supervision and inspection after the expiration. Material for water meter, with reference to the Ministry of Health issued Wei Office of Oversight [2010] No. 134, "drinking water health and safety evaluation meter (Trial)" provides water meter manufacturer shall not country this specification is JJF 1246-2010 "measurement equipment manufacturing license evaluation general specification" of the contents of the supplement Regulations, according to the specifications in Appendix A of the structure and format requirements to write.
Meter measurement equipment manufacturing license Examination Prerequisites
1 Scope
This specification applies to the production of water Enterprise of measurement equipment manufacturing license examination, review, and after the expiration date Regular supervision and inspection.
Note. This specification refers to common household water meter flow Q3<=16m3/h of water, non-household water table refers to the common flow Q3 > 16m3/h Water meter.
2. References
This specification refers to the following documents.
JJG162 cold water
JJG686 water table
GB/T 778.1-2007/ISO 4064-1:2005 closed conduits measuring water flow of cold potable water
Table and hot water - Part 1. Specification
GB/T 778.3-2007/ISO 4064-3:2005 closed conduits measuring water flow of cold potable water
Table and hot water - Part 3. Test equipment and test methods
GB/T 25920-2010 drinking cold water plastic case and pressure parts Technical Specification CJ266-2008 drinking water, cold water safety rules CJ/T 133-2012 IC card cold water meter CJ/T 224-2012 electronic remote meter Note. For dated references, only the dated edition applies to this specification; undated reference documents, the most the new version (including any amendments) applies to this specification.
3 production facilities Production facilities including production equipment, process equipment (including molds), and testing equipment of three parts.
3.1 Production Equipment 3.1.1 corporate statement made parts list or product drawings listed companies should have the appropriate processing equipment, Equipment should be in good condition, quantity and production capacities. All equipment should be included in the list of production equipment.
3.1.2 mechanical meter movement assembly or movement of some parts of its own production, and must have the capacity to adapt Injection molding machines and molds. Based on the work of the meter electronics or electromagnetic principles, such as self-produced measuring sensors, should be Adapted production equipment.
3.1.3 meter housing, movement assembly, electronics and measurement sensors for outsourcing, companies should provide external Covariance equipment capacity and management assessment records, quality assurance and signed a contract with the Association party.
3.2 Process Equipment If the self-production parts, according to the processing and assembly process requirements, enterprises should have the appropriate process equipment, provided
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 10 pages — is available in the English PDF.
How to Download JJF 1435-2013
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
JJF 2425-2026 — Calibration specification for carbon dioxide incubators
JJF 1183-2025 — Calibration Specification for Temperature Transmitters
JJF 1282-2025 — Calibration Specification for Time Delay Relays
JJF 1435-2013
$195.00