Valid

GB/Z 41289-2022Non-destructive testing instruments - Evaluation procedures (English PDF)

无损检测仪器 鉴定程序

Preview PDF

This is a limited preview

Buy now to download the full PDF (12 pages)

Need quotation for your management?

Get a formal quotation for GB/Z 41289-2022 in 30 minutes.

Issued by

State Administration for Market Regulation; Standardization Administration of China

Level / Type

National · Recommended

Issue date

March 9, 2022

Implementation date

March 9, 2022

Scope

GB/Z 41289-2022 is the English-translated version of 无损检测仪器 鉴定程序.

This document specifies the evaluation procedures for new non-destructive testing instrument products. This document applies to non-destructive testing instruments that require evaluation.

Found what you need?

Document preview — GB/Z 41289-2022

National Standard of the People's Republic of China

ICS
19.100
Classification
N78

Issued by: State Administration for Market Regulation; Standardization Administration of China

Contents

  • ForewordIII
  • 1 Scope1
  • 2 Normative references1
  • 3 Terms and definitions1
  • 4 Evaluation procedures1
  • Annex A (informative) Format of the evaluation report5
  • Annex B (informative) Preparation of evaluation documents6

Foreword

This document was drafted in accordance with the rules given in GB/T 1.1-2020, Directives for standardization - Part 1: Rules for the structure and drafting of standardizing documents.

Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. The issuing body of this document shall not be held responsible for identifying any or all such patent rights.

This document was proposed by the China Machinery Industry Federation.

This document is under the jurisdiction of the National Technical Committee on Testing Machines of Standardization Administration of China (SAC/TC 122).

The drafting organizations of this document are Jining Luke Testing Equipment Co., Ltd., Xiamen Huace Testing Technology Co., Ltd., Shenzhen Guoji Instrument Co., Ltd., Liaoning Instrumentation Research Institute Co., Ltd. and Dandong Aolong Radiative Instrument Group Co., Ltd.

The main drafters of this document are Ma Jun, Yang Yang, Guo Bing, Wang Lin and Jiang Shengjie.

1 Scope

This document specifies the evaluation procedures for new non-destructive testing instrument products.

This document applies to non-destructive testing instruments that require evaluation.

Note: new non-destructive testing instrument products include products never before developed or manufactured, and non-destructive testing instrument products whose main performance, structure, technical features and value coefficient are all clearly different from and improved over existing products.

2 Normative references

There are no normative references in this document.

3 Terms and definitions

No terms and definitions are listed in this document.

4 Evaluation procedures

4.1 Evaluation categories and levels. 4.1.1 The evaluation of new non-destructive testing instrument products is divided into: a) design finalization evaluation (including technical evaluation); b) production finalization evaluation. 4.1.2 The evaluation levels of new non-destructive testing instrument products are: a) self-evaluation; b) third-party evaluation.

4.2 Presiding evaluation organization. The presiding evaluation organization is an organization qualified for evaluation that can directly undertake evaluation tests; the evaluation tests of a new product may be completed by one or more testing organizations.

4.3 Design finalization evaluation. 4.3.1 Procedure of design finalization evaluation. 4.3.1.1 Application. Before evaluation of the product, the applicant organization shall prepare for the evaluation tests and prepare the necessary technical documents, for example: the technical assignment, design description, design drawings, necessary process documents, instructions for use, performance test report, standardization review report, user opinions or operation report, evaluation test programme and trial production summary. The applicant organization submits the new product evaluation application report to the presiding evaluation organization two months in advance, together with all the technical documentation required for the new product evaluation.

4.3.1.2 Preliminary review. The presiding evaluation organization designates a specific person to carry out a preliminary review of the new product evaluation application report and technical documentation and, when necessary, may carry out a verification at the applicant organization. 4.3.1.3 Approval. When the preliminary review is passed, the presiding evaluation organization approves the evaluation application, fixes the date of the evaluation meeting and notifies the applicant organization in good time.

4.3.1.4 Meeting preparation. The members of the evaluation committee are experts of the relevant speciality holding senior professional titles; the list may be designated by the presiding evaluation organization, or recommended by the applicant organization and confirmed by the presiding evaluation organization. Note: in principle, persons having an interest in the parties to the product evaluation or connected with the new product developer should not serve as members of the evaluation committee. After receiving formal approval from the presiding evaluation organization, the applicant organization sends the main meeting documents to each member organization of the evaluation committee at least fifteen days before the evaluation meeting.

4.3.1.5 Evaluation meeting. The evaluation meeting is presided over by the presiding evaluation organization and is usually divided into the following stages: a) technical review, carried out by a technical review group made up of some of the committee members, covering: 1) technical review and standardization review of the technical documentation; 2) review and approval of the evaluation test programme; 3) where the product evaluation requires a site visit and inspection of the physical product, the applicant organization actively cooperates and provides the conditions needed for the evaluation.

b) Evaluation tests: the evaluation testing department performs the tests according to the approved evaluation test programme. When the tests are performed by a temporarily designated testing department, a test supervisor attends; when they are performed by a testing department qualified for evaluation, no supervisor is sent. The evaluation testing department is responsible for submitting the evaluation test report. Where the applicant organization has a product testing centre, the evaluation tests may be carried out by that centre, which submits an evaluation test conformity report. c) Comprehensive assessment: on the basis of the technical review and the evaluation test report, all members of the evaluation committee make a comprehensive assessment of the product against the technical conditions, confirm whether it meets the evaluation requirements, and draft and adopt the evaluation report, which is submitted to the presiding evaluation organization for review.

Depending on the complexity of the non-destructive testing instrument and the amount of test work, the above stages of the evaluation meeting may be completed at one time or in phases. For major key equipment and new products of high technical level, a small number of industry experts and users may also be invited to the evaluation meeting, and the review and evaluation are carried out according to the evaluation procedure.

4.3.1.6 Evaluation conclusion. On the basis of the evaluation report and the conformity criteria of design finalization evaluation, the presiding evaluation organization draws the evaluation conclusion; for products that pass, it issues a design finalization certificate. Technical evaluation projects are conducted with reference to the design finalization evaluation requirements, and for those that pass the presiding evaluation organization issues a technical evaluation certificate. Persons taking part in the evaluation shall not, without permission of the right holder, disclose, use, allow others to use or transfer the commercial technology involved in the project.

4.3.2 Conditions for applying for design finalization evaluation: a) the developer has carried out the main design performance tests according to the product technical conditions, proving that the design requirements are met; b) complete technical documentation; c) trial use by users proving that the requirements of use are met; d) provision of formal prototypes, complete with accessories, in the specified quantity.

4.3.3 Technical documents submitted when applying for design finalization evaluation. The following should be submitted: a) design assignment; b) product technical conditions; c) product instructions for use; d) complete set of drawings and parts lists; e) prototype trial production summary; f) type test report; g) on-site (enterprise premises) test report; h) user trial report (prepared by the user); i) standardization review report for prototype evaluation; j) technical research report; k) technical and economic analysis report; l) design finalization evaluation test programme.

4.3.4 Conformity criteria of design finalization evaluation: a) product drawings and technical documents are complete, whole, correct and consistent; b) evaluation tests of the prototype prove that all indicators meet the design requirements; c) the product has value for wider application.

4.4 Production finalization evaluation. 4.4.1 Products that have passed design finalization evaluation undergo trial production and production finalization evaluation before being transferred to batch or repeated production. 4.4.2 The production finalization evaluation follows the design finalization evaluation procedure. 4.4.3 Conditions for applying for production finalization evaluation: a) the product has complete design finalization technical documents from the design finalization evaluation; b) the related product standard has been formally published; c) all production technical documents are complete; d) the manufacturer has completed the type tests according to the product standard and holds an inspection certificate from its inspection department; e) trial use by users has shown that the requirements are met; f) a sufficient quantity (as specified in the assignment) of trial production products is provided, manufactured strictly according to the specified production process.

4.4.4 The following documents should be submitted when applying for production finalization evaluation: a) product standard; b) small-batch trial production summary; c) production drawings and process specifications; d) lists of purchased and subcontracted parts and report on their sources of supply; e) standardization review report for small-batch trial production; f) product commissioning rules; g) product instructions for use; h) type test report.

4.4.5 Conformity criteria of production finalization evaluation: a) product drawings and technical documents are complete, whole, correct and consistent; b) evaluation tests prove that all technical indicators of the product meet the requirements of the product standard; c) the manufacturer has the production equipment, process tooling and metrological inspection and testing means to guarantee product quality; d) the sources of raw materials, components, purchased parts and subcontracted parts required by the product are secured; e) effective quality control has been initially established.

4.5 Evaluation report and documents required in the evaluation process. The format of the evaluation report is given in Annex A, and the preparation of the evaluation documents required in the evaluation process is given in Annex B.

Annex A (informative) Format of the evaluation report

The format of the evaluation report is given in Table A.1.

Table A.1 is a blank form with fields for: product model and product name; applicant organization; evaluation chairperson, date of the evaluation meeting and place of the evaluation meeting; purpose of the evaluation; basis of the evaluation; evaluation process and content; evaluation conclusion and recommendations; signatures of the evaluation personnel, with columns for evaluator, department/organization and position; prepared by/date, reviewed by/date and approved by/date; and verification of the improvement measures stated in the evaluation conclusion, signed by the verifier.

Annex B (informative) Preparation of evaluation documents

B.1 Evaluation application report. The content should include: a) product model and product name; b) applicant organization; c) basis for the trial production of the product and main technical indicators; d) summary of the status of completion (indicators achieved, preparation of technical documentation, trial use of the product, etc.); e) planned date and place of the evaluation meeting and participating organizations; f) other remarks; g) complete set of technical documents.

B.2 Technical documents. B.2.1 General. The technical documents should include: a) technical requirements; b) acceptance rules and test methods; c) requirements for marking, packaging, transport and storage. B.2.2 Product instructions for use. The content should include: a) product model and product name; b) photograph or outline drawing; c) main structure, working principle, schematic diagram and system diagram; d) main performance and technical indicators; e) operating method and precautions; f) maintenance guide; g) list of spare parts and accessories and their instructions for use.

B.2.3 Prototype trial production summary. The content should include: a) source of the task and nature of the trial prototype; b) determination of the design scheme; c) outline of the trial production process; d) problems encountered during trial production, solutions adopted and outstanding problems; e) whether the technical requirements specified in the design assignment have been met; f) implementation of the comprehensive standardization requirements; g) assessment of the technical level; h) conclusion.

B.3 Type test report. The content should include: a) date, place and participants of the test; b) product model, product name and quantity of the test samples; c) test items, test methods and test conditions; d) standards relevant to the tested product; e) name, specification and technical condition of the instruments and equipment used; f) necessary original records and results; g) problems found during the test and how they were dealt with; h) conclusion.

B.4 On-site (enterprise premises) test report. The content should include: a) product model, name, quantity and serial numbers; b) date and place of the test, participating organizations and personnel; c) purpose, items and methods of the test; d) test conditions (environmental conditions); e) name, specification and technical condition of the instruments and equipment used; f) test results and problems found; g) conclusion.

B.5 User trial report. The content should include: a) product model, product name, quantity and serial numbers; b) period of the trial and organization conducting it; c) environmental conditions of the trial; d) technical level of the trial personnel; e) assessment (reliability, stability, ease of operation and maintenance, etc.); f) suggestions for improvement.

B.6 Standardization review report for prototype evaluation. The content should include: a) product model and product name; b) completeness and quality level of the drawings and technical documents; c) standardization coefficient and economic benefit; d) implementation of standards and main reasons for any standards not implemented; e) status of the product technical conditions or draft product standard; f) conclusion.

B.7 Standardization review report for small-batch trial production. The content should include: a) standardization and continuity of process and tooling; b) correctness, completeness and consistency of process documents; c) tooling standardization coefficient and economic benefit analysis; d) existing problems and solutions; e) conclusion. B.8 Key technology and key process report. The content should include: a) where the key technologies and key processes lie; b) solutions and the results achieved.

B.9 Design finalization evaluation test programme. The content should include: a) technical indicators; b) test items, test methods and data processing methods; c) model and specification of the instruments and equipment used; d) number of test samples; e) assessment criteria; f) explanatory notes.

B.10 Evaluation test report. The content should include: a) product model, name, quantity and serial numbers; b) evaluation testing department and test date; c) test items and model and specification of the instruments and equipment used; d) necessary original records and test results; e) problems found during the tests; f) conclusion; g) signatures of the test personnel.

B.11 Finalization evaluation report. The content should include: a) product model and name; b) evaluation category and evaluation date; c) developer, presiding evaluation department and evaluation testing department; d) main technical indicators and test results; e) conclusions of the review of documentation and drawings; f) evaluation opinion; g) recommendations and requirements; h) attachments: 1) evaluation test programme; 2) list of evaluation committee members (name, organization, professional title, position) with signatures.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 12 pages — is available in the English PDF.

Similar standards

Editions of GB/Z 41289

EditionTitleRevisionStatus
GB/Z 41289-2022Non-destructive testing instruments - Evaluation procedurescurrent editionCurrent

This page sells the current edition, GB/Z 41289-2022. Earlier editions are listed for reference only.

How to Download GB/Z 41289-2022

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
12 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/Z 41289-2022

$165.00