GB/Z 32519.3-20161 000 MW class hydraulic -- Generator -- Part 3: Quality inspection stands for installation (English PDF)
Also coversGBZ32519.3-2016
This is a limited preview
Buy now to download the full PDF (25 pages)
Need quotation for your management?
Get a formal quotation for GB/Z 32519.3-2016 in 30 minutes.
Issued by
General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China, China National Standardization Administration
Level / Type
National · Recommended
Issue date
February 24, 2016
Implementation date
September 1, 2016
Scope
GB/Z 32519.3-2016 (1 000 MW class hydraulic -- Generator -- Part 3: Quality inspection stands for installation) is available as an English-translated PDF.
GB/Z 32519.3-2016 — This Guidance Document sets forth the requirements for the installation, commissioning and testing of hydroelectric generating sets and their ancillary equipment.
This guideline technique the document is applicable to the installation and acceptance guidance of 1000MW Francis turbine units with single capacity.
Found what you need?
Document preview — GB/Z 32519.3-2016
National Standard of the People's Republic of China
- ICS
- 29.160.40
- Classification
- K 52
Issued by: General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China, China National Standardization Administration
Contents
- Foreword
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 General
- 5 General Provisions
- 6 Turbine installation test content
- 7 Generator installation test content
Foreword
This instructional document has been drafted in accordance with the rules given in GB/T 1.1-2009.
This guidance document is proposed by China Electrical Equipment Industry Association.
This guidance document is organized by the National Large Scale Generator Standardization Technical Committee (SAC/TC511).
The drafting of this technical guidance document. China Three Gorges Corporation, China Power Construction Co., Ltd., China's water conservancy and hydropower Fourth Engineering Bureau Co., Ltd. Mechanical and Electrical Installation Branch, Harbin Electric Machinery Co., Ltd., Dongfang Electric Group Dongfang Electrical Machinery Co., Ltd.
State Power Construction Group East China Survey and Design Institute Co., Ltd., the Yangtze River design company.
Introduction
Since the installation of the 700MW hydroelectric generating set of the Three Gorges Project in China, the installation of a domestic giant hydroelectric generating set has entered a Peak, Longtan, Xiaowan, Laxiwa, Xiluodu, Xiangjiaba power plant giant units have been put into operation, the installation of the giant unit of more attention to the quality of the total Results giant unit installation quality testing standards is imperative, the original GB GB/T 8564-2003 quality testing standards need to be improved, with After improving the quality inspection standards can also guide Baihetan, Wudongde and other follow-up giant unit installation.
This guidance document is based on the summary of the domestic large hydro-generator sets (single-flow capacity of 700MW and above Francis turbine Motor unit) installed on the basis of quality standards prepared for the future stand-alone capacity 1000MW Francis turbine installation Quality testing provide a standard basis.
1000MW water turbine generator Part 3. Installation quality inspection guidelines
1 Scope
This Guidance Document sets forth the requirements for the installation, commissioning and testing of hydroelectric generating sets and their ancillary equipment. This guideline technique the document is applicable to the installation and acceptance guidance of 1000MW Francis turbine units with single capacity.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 2900.25 Electrotechnical terminology rotary motor Hydropower plant hydraulic machinery and equipment GB/T 7894 hydroelectric generator basic technical conditions GB/T 8564 turbine generator installation technical specifications GB/T 11345 Weld non-destructive testing ultrasonic testing technology test grade and assessment GB/T 14541 operating turbine oil maintenance management guidance GB/T 20160 rotating motor insulation resistance test GB/T 20835 generator stator core magnetization test guidelines GB/T 50150 electrical installations installation of electrical equipment transfer test standards DL/T 330 Water conservancy and hydropower projects metal structures and equipment welded joints diffraction time difference method ultrasonic testing DL/T 1067 evaporative cooling hydro-generator (power generation/motor) basic technical conditions
3 Terms and definitions
GB/T 20160, GB/T 2900.45 and GB/T 2900.25 defined terms and definitions apply to this document.
4 General rules
General requirements for the installation of 1000MW hydro-generator set specifications should be consistent with the relevant provisions of GB/T 8564.
5 General provisions
General requirements for the installation of 1000MW hydro-generator set specifications should be consistent with the relevant provisions of GB/T 8564.
6 Turbine installation test content
6.1 Buried installation quality inspection Press "Buried installation quality inspection standards" (see Table 1 ~ Table 8) implementation.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 25 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 2900.25Electrotechnical terminology -- Rotating electrical machines
- GB/T 7894Fundamental technical requirements for hydro-generators
- GB/T 8564Technical specification for installation of hydraulic turbine-generator unit
- GB/T 11345Non-destructive testing of welds - Ultrasonic testing - Techniques, testing levels and assessment
- GB/T 14541Guide for maintenance and supervision of in-service mineral turbine oil used for power plants
- GB/T 20160Recommended practice for testing insulation resistance of rotating machinery
GB/T 50150
How to Download GB/Z 32519.3-2016
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 11345-2023 — Non-destructive testing of welds - Ultrasonic testing - Techniques, testing levels and assessment
GB/T 14541-2017 — Guide for maintenance and supervision of in-service mineral turbine oil used for power plants
GB/T 20160-2006 — Recommended practice for testing insulation resistance of rotating machinery