GB/Z 21193.1-2007Fossil-fired steam power stations -- Part 1: Limiting controls (English PDF)
Also coversGBZ21193.1-2007
This is a limited preview
Buy now to download the full PDF (32 pages)
Need quotation for your management?
Get a formal quotation for GB/Z 21193.1-2007 in 30 minutes.
Issued by
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, China National Standardization Administration
Level / Type
National · Recommended
Issue date
November 14, 2007
Implementation date
May 1, 2008
Scope
GB/Z 21193.1-2007 (Fossil-fired steam power stations -- Part 1: Limiting controls) is available as an English-translated PDF.
GB/Z 21193.1-2007 — This section covers the limiting control of mineral-fired steam power stations. From the perspective of the task and role of the limit control, they are located between the actual operational control and the protection device.
The task of running control is the resulting output always controls the power generation process in a manner corresponding to the preset values, and for this purpose each subsystem is economically and cyclically the requirements of the environment are running.
The task of protecting equipment is primarily to protect people, the environment, and the equipment and its components from damage by means of downtime.
The limiter control is used to support the run control, so it can run continuously under the constraints that may be imposed during the transition, for example, at boot and during downtime, as well as in abnormal operating conditions.
Limiting control often uses actuators with operational controls that can be cut off like operational controls. However, when the limit control is when cutting off, the pre-automatic clipping of the process value no longer exists before the protection device is triggered.
Therefore, the limiting control is different from the protection device. The protective device cannot be cut off, and most of it works through its dedicated actuator.
This guidance technical document and operational control the system is independent of the protection device. Subsystem control tasks can vary with the overall device operating conditions.
In order to adapt to various control tasks, the structural transformation is carried out. The following are optional structures available for the device. --- between the operation control and the limit control; --- Within the limit control; --- In the operation control.
Therefore, for process tasks, structural transformation is not an isolated control solution, they are involved in this section along with clipping control. (See Appendix A to Appendix G).
Found what you need?
Document preview — GB/Z 21193.1-2007
National Standard of the People's Republic of China
- ICS
- 25.040.40; 27.100
- Classification
- N 18
Issued by: General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, China National Standardization Administration
Contents
- Foreword
- Introduction
- 1 Scope
- 2 Symbols, subscripts, abbreviations
- 2.1 Symbol
Foreword
GB/Z21193 "Mineral Combustion Steam Power Station" is divided into the following sections.
--- Part 1. Limiting control;
--- Part 2. Drum water level control;
--- Part 3. Steam temperature control.
This part is the first part of GB/Z21193.
This part is equivalent to IEC/T R62140-1.2002 "Mineral Combustion Steam Power Station Part 1. Limiting Control" (English version).
For ease of use, the following compile changes have been made to IEC/T R62140-1.2002.
a) the words "technical report" were replaced by the words "guidance technical documents";
b) delete the preface to IEC/T R62140-1.2002;
c) delete the introduction to IEC/T R62140-1.2002;
d) the term "limiter control" in this part is equivalent to "limit control" in the standard GB/T 2900.56-2002;
e) According to the regular publications and standards of the power industry, the abbreviation "Boiler SG" in this section is changed to "Boiler B".
Appendix A, Appendix B, Appendix C, Appendix D, Appendix E, Appendix F and Appendix G of this part are informative annexes.
This part was proposed by the China Machinery Industry Federation.
This part is under the jurisdiction of the Second Technical Committee of the National Industrial Process Measurement and Control Standardization Technical Committee.
This section is responsible for drafting the unit. Southwest University.
Participated in the drafting of this section. Mechanical Industry Instrumentation and Instrumentation Institute of Integrated Technology and Economics, China Silian Instrument and Meter Group, Xi'an Thermal Power Research Institute Co., Ltd., Beijing Machinery Industry Automation Research Institute, Shanghai Industrial Automation Instrumentation Institute.
Introduction
This part is part of GB/Z21193, which contains the correct design and operation of the control circuit for the mineral burning power station.
Suggestions. They are based on the current technical solutions, and in order to understand them correctly, this section also presents the necessary backs.
Scene information.
This section proposes or contains special technical solutions, mainly to meet the needs of similar user needs, forming a recognized Method to represent the functional needs of operators and suppliers of mineral burning power plants.
In the given time, this section is strictly regarded as a specific technical solution example, the purpose of which is to encourage the topic.
The idea is unified and the discussion is promoted.
There are two types of instructional technical documents in GB/Z21193.
The first type of guidance technical document relates to special control loops for boilers, such as drum water level control or steam temperature control, and the normal operating conditions in which they are located.
The second type of guidance technical document points out special ways to ensure proper operation under restricted conditions, such as rising and falling During the period, or in abnormal operating conditions, or they are related to the furnace control system, such as load control system or frequency control system. These ones Guidance technical documents usually group power plant units into one.
Each part of GB/Z21193 is independent of each other, however, their content is largely coordinated. This department Columns can be added.
GB/Z21193.1-2007/IEC/TR62140-1:2002 Mineral burning steam power station Part 1. Limiting control
1 Scope
This section covers the limiting control of mineral-fired steam power stations.
From the perspective of the task and role of the limit control, they are located between the actual operational control and the protection device. The task of running control is the resulting output always controls the power generation process in a manner corresponding to the preset values, and for this purpose each subsystem is economically and cyclically the requirements of the environment are running. The task of protecting equipment is primarily to protect people, the environment, and the equipment and its components from damage by means of downtime.
The limiter control is used to support the run control, so it can run continuously under the constraints that may be imposed during the transition, for example, at boot and during downtime, as well as in abnormal operating conditions.
Limiting control often uses actuators with operational controls that can be cut off like operational controls. However, when the limit control is when cutting off, the pre-automatic clipping of the process value no longer exists before the protection device is triggered. Therefore, the limiting control is different from the protection device.
The protective device cannot be cut off, and most of it works through its dedicated actuator. This guidance technical document and operational control the system is independent of the protection device.
Subsystem control tasks can vary with the overall device operating conditions. In order to adapt to various control tasks, the structural transformation is carried out. The following are optional structures available for the device.
--- between the operation control and the limit control;
--- Within the limit control;
--- In the operation control.
Therefore, for process tasks, structural transformation is not an isolated control solution, they are involved in this section along with clipping control.
(See Appendix A to Appendix G).
2 Symbols, subscripts, abbreviations
The following symbols, subscripts and abbreviations apply to this section.
2.1 Symbol
Speed
Power P;
Heat Q;
Heat flux Q;
Temperature ;
Temperature difference delta;
Material stress sigma;
GB/Z21193.1-2007/IEC/TR62140-1:2002
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 32 pages — is available in the English PDF.
How to Download GB/Z 21193.1-2007
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/Z 21193.2-2008 — Fossil-fired steam power stations -- Part 2: Drum-level control
GB/Z 21193.3-2007 — Fossil-fired steam power stations -- Part 3: Steam-temperature controls
GB/Z 102.17-2026 — Semiconductor devices - Discrete devices - Part 17: Magnetic and capacitive coupler for basic and reinforced insulation
Secure payment via Stripe
Payments accepted
GB/Z 21193.1-2007
$545.00