Valid

GB/Z 17624.5-2025Electromagnetic compatibility - General - Part 5: High power electromagnetic (HPEM) effects on civil systems (English PDF)

电磁兼容 综述 第5部分:高功率电磁环境(HPEM)对民用系统的影响

Preview PDF

This is a limited preview

Buy now to download the full PDF (35 pages)

Need quotation for your management?

Get a formal quotation for GB/Z 17624.5-2025 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

December 3, 2025

Implementation date

December 3, 2025

Scope

GB/Z 17624.5-2025 is the English-translated version of 电磁兼容 综述 第5部分:高功率电磁环境(HPEM)对民用系统的影响.

GB/Z 17624.5-2025 is the Chinese standard "Electromagnetic compatibility - General - Part 5: High power electromagnetic (HPEM) effects on civil systems".

Its scope clause reads: This document is a technical guideline that provides guidelines for defining the field, voltage, and current requirements for high-power electromagnetic environments (HPEMs) in civil systems.

Background information on standards related to effects. With the emergence of new transient antenna technologies and the widespread use of digital electronic products, electronic devices in The possibility of interference or damage in these environments is receiving increasing attention.

This document first provides an overview of this issue and lists... The relevant terms and definitions are introduced, the relevant HPEM electromagnetic environment is described, and the various effects of the HPEM electromagnetic environment on civilian systems are discussed.

Effects. Finally, the protective technologies for electronic systems in these environments are summarized. More detailed information can be found in other documents of the IEC 61000 series. Provided separately in the package. Its clauses include terms and definitions.

Found what you need?

Document preview — GB/Z 17624.5-2025

National Standard of the People's Republic of China

ICS
33.100.20
Classification
L 06

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • Introduction
  • 1.Scope
  • 2 Normative References
  • 3.Terms and Definitions
  • 4.Overview 5.
  • 4.1 Overview
  • 4.2 Case Study of HPEM on System Effects
  • 4.3 Conventional Electromagnetic Protection Measures for Civil Systems
  • 5.Classification of High-Power Electromagnetic Environments 8.
  • 5.1 Overview
  • 5.2 Radiation and Conduction in HPEM Environments
  • 5.3 Narrowband (Continuous Wave) Waveform
  • 5.4 Ultra-wideband (short pulse) transient environment
  • 5.5 Repetition Rate Excitation
  • 6.The impact of high-power electromagnetic environment on the system
  • 6.1 Overview
  • 6.2 System Topology Description
  • 6.3 Case Study 14.The Impact of HPEM on Electronic Systems and Components
  • 6.4 Burnout and permanent damage to components and subsystems
  • 6.4.1 Overview
  • 6.4.2 Device Damage
  • 6.4.3 Transient transmission effects on personal computers
  • 6.4.4 Building-level conducted interference test
  • 6.5 Logical disorder and service interruption
  • 7.The concept of HPEM protection
  • 7.1 Overview
  • 7.2 Strategy for Selecting Immunity Levels
  • 7.3 Summary of HPEM Protection Technology
  • 7.4 Implementation of HPEM Protection
  • 7.4.1 Overview
  • 7.4.2 Protection against intentional penetration
  • 7.4.3 Protection against unintentional penetration
  • 7.4.4 Other methods of HPEM protection
  • References

1 Scope

This document is a technical guideline that provides guidelines for defining the field, voltage, and current requirements for high-power electromagnetic environments (HPEMs) in civil systems.

Background information on standards related to effects. With the emergence of new transient antenna technologies and the widespread use of digital electronic products, electronic devices in

The possibility of interference or damage in these environments is receiving increasing attention. This document first provides an overview of this issue and lists...

The relevant terms and definitions are introduced, the relevant HPEM electromagnetic environment is described, and the various effects of the HPEM electromagnetic environment on civilian systems are discussed.

Effects. Finally, the protective technologies for electronic systems in these environments are summarized. More detailed information can be found in other documents of the IEC 61000 series.

Provided separately in the package.

2 Normative references

The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included.

For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies.

This document.

Note. GB/T 4365-2024 Electrotechnical Terminology - Electromagnetic Compatibility (IEC 60050-161.2021, IDT)

IEC 61000-2-13 Electromagnetic compatibility (EMC) - Part 2-13.High power electromagnetic environment (HPEM) - Radiated and conducted electromagnetic fields

IEC 61000-4-4 Electromagnetic compatibility (EMC) – Part 4-4.Test and measurement techniques – Electrical fast transient/burst immunity test fasttransient/burstimmunitytest]

Note. GB/T 17626.4-2018 Electromagnetic compatibility testing and measurement techniques - Electrical fast transient/burst immunity test (IEC 61000-4-4.2012)

IDT)

IEC 61000-4-5 Electromagnetic compatibility (EMC) – Part 4-5.Test and measurement techniques – Surge (impulse) immunity test [Elec- test1),Amendment1(2000)]

1) There is a merged version 1.1, which includes IEC 61000-4-5.1995 and its amendment 1 (2000).

Note. GB/T 17626.5-2019 Electromagnetic compatibility testing and measurement techniques - Surge (impulse) immunity test (IEC 61000-4-5.2014, IDT)

3 Terms and Definitions

The terms and definitions defined in IEC 60050-161 and the following terms and definitions apply to this document.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 35 pages — is available in the English PDF.

Referenced standards

Normative references

IEC 61000-2-13 · IEC 61000-4-4 · IEC 61000-4-5

Similar standards

How to Download GB/Z 17624.5-2025

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
35 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/Z 17624.5-2025

$545.00