Valid

GB/T 90.3-2010Fasteners -- Quality assurance system (English PDF)

紧固件 质量保证体系

Preview PDF

This is a limited preview

Buy now to download the full PDF (8 pages)

Need quotation for your management?

Get a formal quotation for GB/T 90.3-2010 in 30 minutes.

Issued by

Standardization Administration of China

Level / Type

National · Recommended

Issue date

January 10, 2011

Implementation date

October 1, 2011

Scope

GB/T 90.3-2010 is the English-translated version of 紧固件 质量保证体系.

GB/T 90.3-2010 — GB/T of the provisions of section 90 of the fastener manufacturer and distributor of quality assurance system should follow requirements. These requirements the purpose is to reduce or prevent substandard fasteners, in order to achieve the specified characteristics close to zero-defect quality goals.

This section describes the raw material from the reception, through the manufacturing process to claim the delivery to the dealer or user (assembler) of.

Found what you need?

Document preview — GB/T 90.3-2010

National Standard of the People's Republic of China

ICS
21.060.20
Classification
J 13

Issued by: Standardization Administration of China

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions

Foreword

This section GB/T 90 (hereinafter referred to in this section) is the national standard "fasteners acceptance inspection, packaging and quality assurance" series of standards First, the series includes.

--- GB/T 90.1-2002 fasteners acceptance inspection;

--- GB/T 90.2-2002 fastener marking and packaging;

This section GB/T 90 Part 3.

This part identical with ISO 16426:2002 "Fastener Quality Assurance System" (in English), the main editorial changes are as follows.

--- In the reference file, instead of using our standards with international standards (Chapter 2).

--- With GB/T 19000-2008 "Quality Planning" Terms and definitions instead of the ISO 16426 "Quality Plan" term (see 3.1).

Appendix A of this section is informative appendix.

This part is proposed by China Machinery Industry Federation.

This part of the National Standardization Technical Committee fasteners (SAC/TC85) centralized.

This section is responsible for drafting unit. Productivity Promotion Center in the machine.

Participated in the drafting of this section. general industrial machinery parts and components product quality supervision and inspection center, Ningbo Kowloon Fastener Manufacturing Co.

the company.

This part of the National Standardization Technical Committee Secretariat responsible for the interpretation of fasteners.

This section is the first issue.

Fastener Quality Assurance System

1 Scope

GB/T of the provisions of section 90 of the fastener manufacturer and distributor of quality assurance system should follow requirements. These requirements the purpose is to reduce or prevent substandard fasteners, in order to achieve the specified characteristics close to zero-defect quality goals.

This section describes the raw material from the reception, through the manufacturing process to claim the delivery to the dealer or user (assembler) of.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document.

GB/T 90.1-2002 fasteners acceptance inspection (idt ISO 3269:2000) GB/T 3098.17-2000 Fasteners - Preloading test for detection of hydrogen embrittlement - Parallel bearing surface method (idt ISO 15330:1999) GB/T 19000-2008 Quality Management System - Fundamentals and vocabulary (ISO 9000:2005, IDT)

3 Terms and definitions

This standard uses the following terms and definitions.

Quality Planning advancedqualityplanning Part of quality management (command and control an organization with regard to quality coordinated activities), we are committed to setting quality objectives (in terms of quality Objective pursued) and provides the necessary operational processes (the inputs into output of interrelated set of activities or interacting) and related Resources to achieve quality goals.

Note. The preparation of quality plan (for a specific project, product, process or contract provisions by whom and which procedures and associated resources files when used) may be qualitative Part of the amount planned.

Restructuring alter

After the original manufacturing process, any process change fastener geometry, mechanical performance or operating characteristics.

Process capability index value Cpk value is a measure of process capability. Step average and it has the upper and lower limits of a normal distribution and characteristics Standard deviation of the relevant characteristics.

Customer

Institutions or individuals receiving product.

Note. A customer can be a user or dealer.

Mixed commingling

Load the same type of fasteners in different production batches of the same package.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 8 pages — is available in the English PDF.

Referenced standards

How to Download GB/T 90.3-2010

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
8 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 90.3-2010

$175.00