GB/T 48106-2026Guidelines for post evaluation of photovoltaic power project (English PDF)

光伏发电项目后评价导则

Preview PDF

Also coversGB/T48106-2026 + GBT48106-2026

This is a limited preview

Buy now to download the full PDF (24 pages)

Need quotation for your management?

Get a formal quotation for GB/T 48106-2026 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

August 28, 2026

Implementation date

December 1, 2026

Scope

GB/T 48106-2026 is the English-translated version of 光伏发电项目后评价导则.

This document provides guidelines for the post evaluation of photovoltaic power projects. Post evaluation is the review carried out after a plant has been built and has operated for a period, comparing actual outcomes with those expected at the planning and approval stage, and drawing lessons for future investment and operation.

Project owners and investors, power generation companies, engineering and consulting firms, lenders, and government bodies that supervise energy projects are the main users. For solar developers the review is a way to learn why a plant performs above or below its forecast and to improve later projects. Because it is a guideline, it offers direction on how to conduct the evaluation rather than fixed performance thresholds.

It is a recommended (GB/T) standard, so it is voluntary unless an investor, lender or authority requires it. It was issued on 28 August 2026 and takes effect on 1 December 2026.

Found what you need?

Document preview — GB/T 48106-2026

National Standard of the People's Republic of China

ICS
27.160
Classification
K83

Issued by: State Administration for Market Regulation; Standardization Administration of China

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions

Foreword

GB/T 48106-2026 is a recommended national standard (GB/T) of the People's Republic of China, issued on 28 August 2026 by the State Administration for Market Regulation and the Standardization Administration of China, with effect from 1 December 2026.

It is under the responsibility of the Ministry of Industry and Information Technology (Electronics).

Classification: ICS 27.160; CCS K83.

1 Scope

This document provides guidelines for the post evaluation of photovoltaic power projects. Post evaluation is the review carried out after a plant has been built and has operated for a period, comparing actual outcomes with those expected at the planning and approval stage, and drawing lessons for future investment and operation.

Project owners and investors, power generation companies, engineering and consulting firms, lenders, and government bodies that supervise energy projects are the main users. For solar developers the review is a way to learn why a plant performs above or below its forecast and to improve later projects. Because it is a guideline, it offers direction on how to conduct the evaluation rather than fixed performance thresholds.

It is a recommended (GB/T) standard, so it is voluntary unless an investor, lender or authority requires it. It was issued on 28 August 2026 and takes effect on 1 December 2026.

Remaining clauses in the full document

  • 2 Normative references
  • 3 Terms and definitions

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 24 pages — is available in the English PDF.

How to Download GB/T 48106-2026

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
24 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 48106-2026

$420.00