GB/T 48060-2026Stormwater pretreatment facilities for sponge city construction (English PDF)

海绵城市建设用雨水预处理设施

Preview PDF

Also coversGB/T48060-2026 + GBT48060-2026

This is a limited preview

Buy now to download the full PDF (24 pages)

Need quotation for your management?

Get a formal quotation for GB/T 48060-2026 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

August 28, 2026

Implementation date

March 1, 2027

Scope

GB/T 48060-2026 is the English-translated version of 海绵城市建设用雨水预处理设施.

Sponge city construction aims to manage urban rainfall by absorbing, storing and treating it, and this document deals with one element of that approach: facilities that pretreat stormwater before it enters further storage, infiltration or treatment. The title places it in the equipment and facility category used for sponge city projects.

Municipal designers, engineering consultants, construction contractors and suppliers of stormwater equipment are the main audience, as are the authorities and owners who need to specify or accept such facilities. Manufacturers can also use it to describe their products in terms that project teams will recognise. It is a recommended national standard, so it is voluntary unless adopted in a contract, design brief or local rule. It was issued on 28 August 2026 and takes effect on 1 March 2027 under the Ministry of Housing and Urban-Rural Development. It is an original Chinese document and does not adopt an international standard. Pretreatment protects downstream infiltration and storage components from debris and sediment.

Found what you need?

Document preview — GB/T 48060-2026

National Standard of the People's Republic of China

ICS
91.140.01
Classification
P40/44

Issued by: State Administration for Market Regulation; Standardization Administration of China

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions

Foreword

GB/T 48060-2026 is a recommended national standard (GB/T) of the People's Republic of China, issued on 28 August 2026 by the State Administration for Market Regulation and the Standardization Administration of China, with effect from 1 March 2027.

It is under the responsibility of the Ministry of Housing and Urban-Rural Development.

Classification: ICS 91.140.01; CCS P40/44.

1 Scope

Sponge city construction aims to manage urban rainfall by absorbing, storing and treating it, and this document deals with one element of that approach: facilities that pretreat stormwater before it enters further storage, infiltration or treatment. The title places it in the equipment and facility category used for sponge city projects.

Municipal designers, engineering consultants, construction contractors and suppliers of stormwater equipment are the main audience, as are the authorities and owners who need to specify or accept such facilities. Manufacturers can also use it to describe their products in terms that project teams will recognise. It is a recommended national standard, so it is voluntary unless adopted in a contract, design brief or local rule. It was issued on 28 August 2026 and takes effect on 1 March 2027 under the Ministry of Housing and Urban-Rural Development. It is an original Chinese document and does not adopt an international standard. Pretreatment protects downstream infiltration and storage components from debris and sediment.

Remaining clauses in the full document

  • 2 Normative references
  • 3 Terms and definitions

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 24 pages — is available in the English PDF.

How to Download GB/T 48060-2026

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
24 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 48060-2026

$420.00