GB/T 47454-2026Interface requirements for extravehicular payloads of a space station (English PDF)
空间站舱外载荷接口要求
This is a limited preview
Buy now to download the full PDF (28 pages)
Need quotation for your management?
Get a formal quotation for GB/T 47454-2026 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
April 30, 2026
Implementation date
November 1, 2026
Scope
GB/T 47454-2026 is the English-translated version of 空间站舱外载荷接口要求.
GB/T 47454-2026 tells anyone building a payload that will ride outside a Chinese space station what interfaces it must provide.
It specifies the mechanical, power supply, information, thermal, robotic arm operation and maintenance interfaces and their verification, splitting payloads into standard ones, which attach through a load adapter on the Wentian and Mengtian experimental modules in a type I version without a fluid loop or a type II version with a fluid loop and a conducting cold plate, and non-standard ones, which use the passive docking points or the micro-spacecraft release mechanism for CubeSats of 1U to 6U and microsatellites of 10 kg to 200 kg.
It also covers entry and exit through the cargo airlock, ergonomics, safety and electromagnetic compatibility. Issued on 30 April 2026, it has applied since 1 November 2026.
Found what you need?
Document preview — GB/T 47454-2026
National Standard of the People's Republic of China
- ICS
- 49.020
- Classification
- V 71
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1 Scope
- 4 External Load Support Methods
- 5 Standard External Load Interface Requirements
- 6 Non-standard external load interface requirements
- 7 General Requirements
- 8 Interface Verification Requirements
1 Scope
4 External Load Support Methods
4.1 Classification of External Loads
Space station external payloads are divided into two categories. standard external payloads and non-standard external payloads. Standard external payloads include medium-sized and small-sized payloads.
Specifications, and their parameters should conform to the provisions of Table 1.
4.2 Standard External Load Support Methods and Load Adapters
4.2.1 The Wentian and Mengtian experimental modules are equipped with load adapters to provide mechanical, power, information, and thermal connections for medium and small standard external payloads. Mouth support.
4.2.2 Load adapters are divided into Type I load adapters (without fluid loop components and heat-conducting cold plates) and Type II load adapters (with fluid loop components and heat-conducting cold plates). Two types. body circuit components and thermally conductive cold plates.
4.2.3 Unless otherwise specified, the adapters configured for the space station are of the following four types.
a) Type I payload adapter for the Wentian experimental module;
b) Wentian Experimental Module Load Adapter Type II;
c) Mengtian Experimental Chamber Load Adapter Type I;
d) Mengtian Experimental Chamber Load Adapter Type II.
4.2.4 The load adapter consists of two parts. the active end and the passive end. See the schematic diagram of the active and passive ends.
Appendix A. The passive end is installed on the external exposed platform of the space station and connected to the space station payload support resources; the active end is installed on the external payload of the standard module.
On the payload, it connects to all interfaces of the standard external payload. In orbit, the active and passive ends of the payload adapter are connected via a robotic arm.
Connect and lock to achieve connectivity between space station payload support resources and standard module extravehicular payloads, as shown in Figure 1.
a) Schematic diagram of the Type I payload adapter for the Wentian/Mengtian experimental module
b) Schematic diagram of the Type II payload adapter for the Wentian/Mengtian experimental module
4.3 Non-standard external load support methods
4.3.1 The Tianhe core module and the Wentian experimental module are equipped with passive docking devices to provide mechanical, power, information, and thermal support for non-standard external payloads. Interface support.
4.3.2 The Mengtian Experiment Module is equipped with a space station micro-spacecraft release mechanism, which can realize the on-orbit release of micro-spacecraft through the operation of a robotic arm.
4.3.3 The outer walls of the Wentian and Mengtian experimental modules are equipped with wireless local area network antennas, which can provide wireless coverage for external payloads (including the standard module) within the coverage area. (External load) provides wireless access services.
4.4 Standard External Load Assembly Method
4.4.1 The mounting surface that contacts the active end of the load adapter is defined as the bottom surface, and the surface opposite the bottom surface is defined as the top surface. The remaining four... A face is defined as a side surface.
4.4.2 The target adapters for the small robotic arms installed on the external payload include Target Adapter Type II and Target Adapter Type III.
4.4.3 Before extravehicular activity (EVA), the astronauts should complete the connection of the target adapter type II, the payload adapter active end, and the standard EVA payload by the target adapter type II and payload active end.
The assembly of standard external loads varies depending on the installation location of the Type II target adapter. There are two assembly methods. top assembly and side assembly.
The type is shown in Figure 2. The coordinate system of the target adapter type II shall be implemented in accordance with the provisions of Appendix B.
4.4.4 When the robotic arm is in orbit caring for the standard external load, the operated objects are the target adapter type II, the standard external load, and the load adapter. A standard external payload assembly consisting of active components.
4.5 Methods for external loads entering and exiting the cabin
Standard cargo loads should be able to enter and exit the cabin via the cargo airlock of the Mengtian Experimental Cabin with the support of a robotic arm.
4.6 External Loads and External Care Methods
4.6.1 Extravehicular care operations for extravehicular loads include on-orbit installation, replacement, recovery, and transfer.
4.6.2 The space station primarily relies on robotic arms to perform extravehicular activity (EVA) care for external payloads. When necessary, EVA by astronauts can be used to achieve EVA. External care for external loads.
4.7 Layout of External Payload Support Interfaces
4.7.1 The Wentian experimental module exposure platform is equipped with a total of 10 Type I passive load adapters, providing power levels ranging from 100W to... 300W, located on the sky, the ground, and the windward side.
4.7.2 The Wentian experimental module exposure platform is equipped with 12 Type II passive load adapters, providing power levels ranging from 300W to... 1000W, located on both the sky and the ground.
4.7.3 The Mengtian experimental chamber exposure platform is equipped with a total of 17 Type I passive load adapters, providing power levels ranging from 200W to... 500W, located on the sky side, the ground side, the windward side, and the leeward side.
4.7.4 The Mengtian experimental chamber exposure platform is equipped with a total of 14 Type II passive load adapters, providing power levels ranging from 500W to... 1000W, located on both the sky and the ground.
4.7.5 The outer wall of the main column section of the Tianhe core module is equipped with one passive docking point in quadrant III-IV, providing a power supply level of [missing information]. 1500W.
4.7.6 The outer wall of the Wentian experimental module's working compartment is configured with two passive docking points in quadrant III, offset from the fourth quadrant, providing a power supply level of [missing information]. 1500W.
4.7.7 The Mengtian Experimental Module is equipped with a micro-aircraft release mechanism, utilizing the load transfer mechanism within the cargo airlock of the Mengtian Experimental Module to achieve cargo release.
It has the function of releasing objects out of the cabin, releasing them, and storing them back in the cabin after release.
5 Standard External Load Interface Requirements
This document specifies the interface requirements and verification procedures for mechanical, power supply, information, thermal, robotic arm operation, and maintenance of external payloads on the space station. Require.
This document applies to the interface design and verification of external payloads on the space station.
5.1 Installation Interface
The installation interface for standard external loads should meet the following requirements.
a) The installation interface location of the Wentian experimental module payload adapter type I active end is shown in Figure 3.
b) The installation interface location of the Wentian experimental module payload adapter type II active end is shown in Figure 4.
c) The installation interface of the active end of the Mengtian Experimental Chamber Load Adapter Type I and Mengtian Experimental Chamber Load Adapter Type II is the same, and the position is as follows. As shown in Figure 5.
5.2 Power Supply Interface
The standard external load power supply interface meets the following requirements.
a) During on-orbit operation.
1) The space station provides one 100V power supply interface to the external payloads via the payload adapter, including power supply for the Wentian experimental module.
The maximum power supply capacity of the interface includes three levels. 100W, 300W, and 1000W. The maximum power supply capacity of the Mengtian experimental module's power supply interface is... The electrical power is available in three levels..200W, 500W, and 1000W. The electrical power used during on-orbit testing of external loads should not exceed [a certain value].
The load power supply exceeds the maximum power of the load adapter's power supply interface;
2) The external load should provide one 100V, 50W inspection power supply interface for the active end of the load adapter;
3) The primary and secondary grounds inside the active end of the load adapter are isolated from the housing, and the active and passive ends of the load adapter are locked.
Subsequently, the active end shell is well connected to the overall cabin structure through the passive end, and the external loads should be grounded under these conditions.
The design resistance of the active terminal connection should not exceed 10mohm.
b) During robotic arm transfer. During the transfer of the external load from the robotic arm's operating cabin, power is supplied to the active end of the load adapter, which is controlled by the main load adapter.
The moving end provides one 100V, 50W transfer power interface for the external payload. The robotic arm power interface and grounding should comply with... The provisions of GB/T 47446.
c) The positive and return lines between the active terminal of the load adapter and the power supply interface circuits inside the external load should be electrically isolated from each other. The resistance should be no less than 10Mohm.
d) The inspection power supply interface inside the external load and the transfer power supply interface inside the active end of the load adapter should be disconnected in the initial state.
e) The transfer power supply interface, load power supply interface and inspection power supply interface share the connector with active terminal code X5.
f) The external load should be selected according to the power supply level of the passive end of the load adapter during the on-orbit test, and the corresponding connector should be selected.
The power supply connector contact assignments are shown in Table 2.
g) The design of the power supply interface for external payloads should meet the power supply and distribution design requirements of the space station.
5.3 Information Interface
The standard external load information interface meets the following requirements.
a) During on-orbit operation.
1) The application information system provides one 1553B bus interface and two bus-type interfaces to the external loads via the load adapter.
FC-AE-1553 interface, 1 28V command bus, 2 (channels 1 and 2 in Table 3) or 4 programmable commands and Four-channel analog telemetry uses a connector with the active end code X1.Specific contact definitions are shown in Table 3. The communication protocol should conform to... The provisions of GB/T 34829.
5.4 Thermal Interface
5.4.1 Standard external loads can be configured with either load adapter type I or load adapter type II according to their own heat dissipation requirements.
5.4.2 The standard external load thermal interface using the Type I load adapter active end shall meet the following requirements.
a) The surface of the active end mounting lug of the Type I load adapter is 0.5mm higher than the upper surface of the main body. The external load mounting surface should not be in contact with the mounting surface.
Thermally conductive physical contact occurs on the upper surface of the active end other than the earpiece;
b) The temperature of the active terminal of the load adapter type I should be measured and monitored through the inspection interface. When the measured temperature value is lower than the minimum temperature of the active terminal... At low storage temperatures, a continuous power supply of no less than 50W should be provided to the active end through the inspection power supply interface to enable the active end to perform main functions. Dynamic thermal control;
c) The external load should cover the entire upper surface of the Type I active end of the load adapter as much as possible. Areas that cannot be covered should be insulated.
5.4.3 The standard external load thermal interface using the Type II load adapter active end shall meet the following requirements.
a) The layout of the active end of the Wentian experimental module load adapter type II to the external load thermal interface is shown in Figure 6.
5.5 Robotic Arm Operation Interface
5.5.1 Standard external loads shall be equipped with target adapter type II, and the interface with the external load shall comply with the provisions of GB/T 47446.
5.5.2 Standard external loads shall be equipped with a load adapter active end. The load adapter tolerance shall be not less than 37mm radially and not less than [missing value] axially. 37mm, triaxial attitude deviation better than 1°
5.5.3 Standard external payloads using the top-mounted assembly method can be moved between the Wentian and Mengtian experimental modules via robotic arm operation.
Installation and recycling of the passive end of the load adapter.
5.5.4 Standard external payloads using a side-mounting method can be partially loaded onto the Wentian and Mengtian experimental modules via robotic arm operation.
Installation and recycling of the passive end of the load adapter.
5.5.5 When the standard external load is assembled on the top surface, the standard external load, the target adapter type II, and the active end of the load adapter are connected... The relative positions of them meet the following requirements.
a) The geometric center of the load adapter's active end body is located on the upper surface of the active end. The Wentian Load Adapter Type I and Mengtian Load Adaptor... The distance from the geometric center of the active end body of the device/Type II to both positioning surface 1 and positioning surface 2 is 200mm; Wentian load adapter II The distance from the geometric center of the active end body to positioning surface 1 is 165mm, and the distance to positioning surface 2 is 200mm. (Target suitable)
The projection of the origin of the Type II coordinate system onto the upper surface of the active end should coincide with the geometric center of the active end body, and the deviation should not exceed [value missing]. 1mm.
b) The mounting surface of the target adapter type II should be parallel to the upper surface of the active end, with a deviation of no more than 0.2° and a distance of 500mm ± 1mm.
c) The O1zY1z axis of the target adapter type II coordinate system should point to the side of the manual operation interface of the active end.
d) External payloads installed in the resource compartments of the Wentian and Mengtian experimental modules, with their target adapter type II coordinate system origin along O1zZ1z.
The distance between the axial direction and the envelope of the external load body should be 234mm ± 1mm. External load, target adapter type II, load appropriate The relative positions of the active terminals of the transmitter are shown in Figure 8.
e) The external load installed in the payload compartment of the Mengtian experimental module, whose target adapter type II coordinate system O1zY1z axis is parallel to the external load along O1z... The distance between the two body envelopes along the Z1z axis should not exceed 1/2 of the maximum allowable envelope at that location. External loads and target suitability... The relative positions of the Type II load adapter and the active end of the load adapter are shown in Figure 9.
6 Non-standard external load interface requirements
6.1 Hanging Point Connection Device Interface
6.1.1 Installation Interface
External loads installed via the attachment point docking device must meet the following requirements for their installation interfaces.
a) The external payload should be equipped with a small robotic arm target adapter and a docking point active end, and the docking should be achieved through robotic arm operation.
The docking and reliable connection between the active and passive ends of the point docking device.
b) For non-permanently installed external loads, in the event of a failure at the active end of the docking point assembly, there should be sufficient capacity to support the active end of the docking point assembly.
The ability to unlock, separate from, and reclaim the passive end.
c) External payloads (including the small robotic arm target adapter and the main docking device) installed in the Tianhe core module via the docking point assembly.
The weight of the moving end should not exceed 500 kg, its axial length along the hull should not exceed 1650 mm, and its height from the bulkhead should not exceed [missing information]. 2000mm, and the width should not exceed 1200mm.
d) External payloads (including the small robotic arm target adapter and the main docking device) installed on the Wentian experimental module via the docking point assembly.
The weight of the moving end should not exceed 2000 kg, its axial length along the hull should not exceed 1650 mm, and its height from the bulkhead should not exceed [missing information]. 2000mm, and the width should not exceed 1200mm.
e) When the external load weight is no more than 1000 kg, Target Adapter Type II should be installed; when the external load weight is greater than 1000 kg... At that time, Target Adapter Type III should be installed. The external load, the target adapter of the small robotic arm, and the active end of the docking point device form a group... The assembly accuracy, dimensional envelope, and center of gravity should meet the requirements of relevant technical documents and interface data sheets.
f) The interface between the external payload and the target adapter of the small robotic arm shall comply with the provisions of GB/T 47446.
g) The mechanical interface between the external load and the active end of the attachment point docking device shall comply with the provisions of the relevant technical documents.
6.1.2 Power Supply Interface
The power supply interface for external loads installed via the attachment point docking device must meet the following requirements.
a) During on-orbit operation.
1) The space station provides one 100V power supply interface to the external payloads via the docking point, and its maximum power is not large. At 1500W;
2) The external load should provide one 100V, 50W inspection power supply interface for the active end of the docking point device;
3) The design of the power supply interface, grounding design, and power supply interface connectors for external loads shall comply with the relevant technical documents.
b) During robotic arm transfer. The robotic arm provides one 100V, 100W power supply interface to the active end of the docking device, which is then connected to the docking point.
The active end of the receiving device supplies power to the external load, and the power supply interface with the robotic arm and grounding should comply with the provisions of GB/T 47446.
6.1.3 Information Interface
The information interface of the external load installed via the attachment point docking device meets the following requirements.
a) During on-orbit operation.
1) The application information system provides one 1553B bus interface and two bus-type interfaces to the external payloads via the docking point connection device.
FC-AE-1553 interface, 1 28V command bus, 4 programmable control commands, and 4 analog telemetry signals;
2) The external load should provide two temperature measurement channels for the active end of the docking device;
3) The communication protocols and information interface connectors of the external payloads shall comply with the provisions of the relevant technical documents.
b) During robotic arm transfer. The robotic arm provides one 1553B bus interface for the external payload, with the external payload's RT address being 30.
The RT address of the active end of the point docking device is 29, and the information interface with the robotic arm should comply with the provisions of GB/T 47446.
6.1.4 Hot Interface
External payloads installed in the Tianhe core module via the attachment point docking device should achieve heat dissipation through their own thermal design.
External payloads installed on the Wentian experimental module via the docking point assembly can be connected to the module via the liquid circuit disconnector configured on the docking point assembly.
External load heat dissipation is achieved through a fluid loop. The load heat dissipation through the fluid loop should not exceed 1000W. (This refers to the connection point docking device and the external fluid...)
The specific interfaces of the circuit should comply with the provisions of the relevant technical documents.
6.1.5 Robotic Arm Operation Interface
When the camera of the small robotic arm is obstructed by the external load or the line of sight between the camera and the target exceeds the measurement range, a device should be installed on the external load.
Install a vision measurement camera, ensuring its main axis is directly aligned with the target. The raw measurement images from the vision measurement camera are transmitted via the LVDS interface.
The image format, transmission requirements, and transmission protocol transmitted to the robotic arm should comply with the relevant technical documents. The visual measurement camera interface should also comply with... The provisions of GB/T 47446.
External loads installed via the docking point device should be determined based on the size and mass characteristics of the operated object, and the relationship between the small robotic arm target adapter and the small machine.
The relative positional relationship between the robotic arm and the camera was determined, and the tolerance design parameters of the interface equipment were determined through dynamic simulation of the robotic arm's load operation.
The relative positions of the external load, the active end of the docking device, and the target adapter should comply with the relevant technical documents.
6.2 Interface of the release mechanism for the micro-aircraft
6.2.1 General Rules
The Mengtian Experiment Module payload bay is equipped with a space station micro-spacecraft release mechanism, capable of releasing CubeSats ranging from 1U to 6U in orbit and weighing [weight missing].
For microsatellites weighing 10kg to 200kg, the specific interfaces should comply with the relevant technical documents of the space station's micro-spacecraft release mechanism.
6.2.2 CubeSat Release Interface
6.2.2.1 Specifications and Dimensions
The micro-aircraft release mechanism is equipped with a CubeSat release unit, capable of releasing CubeSats of six different sizes. 1U, 1.5U, 2U,... 3U, 3U, 6U. Described in cubestar coordinate system. Cubestar specifications, maximum envelope length, length tolerance, and guide rail cross-sectional dimensions are detailed below. The dimensional tolerance is ±0.1mm, as shown in Figure 12.
6.2.2.2 Mechanical Interface
The mechanical interface of the CubeSat meets the following requirements.
a) The CubeSat and its release unit are in direct contact via four parallel guide rails on the surface of the CubeSat. The CubeSat should be positioned along the X-axis.
Guide rails are provided at each of the apex corners, allowing the cubesat release unit to slide into the corresponding guide rail slots;
b) In a faulty state where its components cannot be deployed, the mean surface-to-mass ratio of the CubeSat should be at least 30% greater than that of the space station;
c) The specific interface should comply with the relevant regulations for the release mechanism interface of the space station's micro-spacecraft.
6.2.2.3 Electrical Interface
The electrical interfaces of the CubeSat meet the following requirements.
a) The cubestar should be equipped with power-on protection measures, including at least two release switches and one power-off fuse, of which one protection measure should be In the grounding circuit, a power-off safety pin is installed on the CubeSat itself to keep it in a power-off state; this pin should be removed before exiting the spacecraft.
b) After the cubesat is filled into the cubesat release unit, it de-energizes itself by pressing the release switch on the end face of the guide rail.
Status. During the extravehicular activity (EVA) and the release of the CubeSat by the robotic arm, no electrical or information pathways are provided to the CubeSat.
c) A direct connection interface for the CubeSat should be provided within the operational window provided by the micro-spacecraft release unit to meet on-orbit operation requirements.
Grounding requirements during operation. When the cubesat is within the release unit and not connected to a direct contact interface, the cubesat achieves grounding via the guide rail surface. Indirect overlap.
d) The specific interface should comply with the relevant regulations for the release mechanism interface of the space station's micro-spacecraft.
6.2.2.4 Hot Interface
The thermal boundary between the micro-spacecraft release mechanism and the CubeSat is the contact surface between the CubeSat release unit's backplate and the CubeSat.
The contact surface between the guide rail inside the release unit and the CubeSat guide rail. During the CubeSat release mission, the micro-spacecraft release mechanism provides the CubeSat with... The temperature range of the thermal interface is -15°C to 55°C.
6.2.3 Microsatellite Release Interface
6.2.3.1 Mechanical Interface
The micro-aircraft release mechanism is equipped with a microsatellite release unit to achieve on-orbit release of the microsatellite. The mechanical interface of the microsatellite conforms to the following... Require.
a) Microsatellites weigh between 10kg and 200kg, with a maximum envelope size not exceeding 1000mm × 500mm × 700mm.
The detailed definition of the star coordinate system shall comply with the provisions of Appendix B;
b) In the event of a malfunction where its components cannot be deployed, the average surface-to-mass ratio of the microsatellite should be at least 30% greater than that of the space station;
c) It should comply with the specifications for the release mechanism interface of the space station's micro-spacecraft.
6.2.3.2 Electrical Interface
The electrical interfaces of microsatellites should meet the following requirements.
a) Microsatellites should be equipped with power-on protection measures, including at least two release switches and one power-off fuse, one of which should be in place upon connection.
In the ground loop. The microsatellite itself is equipped with a power-off safety pin to keep it in a power-off state, which should be removed before exiting the capsule.
b) A direct connection interface for the microsatellite should be installed within the operable area inside the astronaut cabin to meet the grounding requirements during on-orbit operation.
When the satellite is connected to the microsatellite release unit but not to a direct connection interface, the microsatellite releases via a push plate from the microsatellite release unit. The contact surfaces achieve indirect overlap.
c) It should comply with the specifications for the release mechanism interface of the space station's micro-spacecraft.
6.2.3.3 Hot Interface
The thermal boundary between the micro-aircraft release mechanism and the microsatellite is the contact surface between the microsatellite release unit's backplate and the microsatellite.
The contact surface between the guide rail inside the release unit and the microsatellite guide rail. During the microsatellite release mission, the micro-vehicle release mechanism provides the microsatellite with... The temperature range of the thermal interface is -15°C to 55°C.
6.3 Wireless LAN Interface
The space station is equipped with an external wireless local area network (WLAN) to provide wireless communication services to extravehicular payloads within the coverage area. The communication protocol should comply with [the relevant regulations/standards]. The provisions of GB/T 47459.
7 General Requirements
7.1 Entering and exiting the cabin
7.1.1 The entry and exit of external loads into and out of the hold shall comply with the provisions of GB/T 42178 for cargo entry and exit.
7.1.2 Extravehicular payloads transported upwards via the spacecraft's sealed cabin should be payloads that astronauts can transfer inside the cabin. (Transfer process...)
During the process, its external dimensions should meet the size constraints of the space station docking passage, and the specific parameters are shown in Figure 13.
7.2 Ergonomics
The ergonomics of the external loads meet the following requirements.
a) Fasteners requiring extravehicular activity by astronauts should be equipped with M5 non-disengaging fasteners;
b) Connectors requiring extravehicular activity by astronauts should be JYH series connectors;
c) For operations that require astronauts to perform outside the cabin, the pushing or pulling force should not exceed 88 N, and the rotational torque should not exceed 250 N·cm;
d) An auxiliary positioning component can be designed on the external payload mounting surface using the active end structure of the payload adapter to assist astronauts in completing payload adaptation.
The active end of the actuator is assembled with the external payload inside the orbital module;
e) It should comply with the requirements of the space station mission section of the ergonomic requirements for manned spaceflight engineering and pass the ergonomic evaluation.
7.3 Security
The safety of external loads meets the following requirements.
a) There should be no components that could potentially harm astronauts or damage extravehicular activity equipment;
b) Failure of external payloads should not affect the safety of the space station and astronauts, nor should it increase the difficulty of replacing external payloads. It may affect the operation of other load devices;
c) Measures should be in place to prevent misoperation, prevent the generation of hazards, and control and protect against hazards to ensure the safety of external load failures. Isolated from the space station;
d) No liquid should spill;
e) It shall comply with the provisions of GB/T 35439, GB/T 47455 and the outline of safety for manned spaceflight engineering.
7.4 Electromagnetic Compatibility
The electromagnetic compatibility (EMC) of external payloads should comply with the electromagnetic compatibility and residual magnetism regulations for the space station. Testing and verification should be conducted, and test results should be provided.
The results showed that it had no electromagnetic impact on the space station and met the magnetic field strength requirements.
8 Interface Verification Requirements
8.1 After the design, development and testing of the external payload are completed, the relevant interface self-verification work should be completed before the flight product leaves the factory.
8.2 Before carrying out on-orbit upgrades of external payloads, relevant interface verification and confirmation work should be completed.
8.3 External payloads should complete the access confirmation process with the space application mission support system.
8.4 External loads shall undergo site access confirmation (including interface access confirmation and safety access confirmation) in accordance with GB/T 47455.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 28 pages — is available in the English PDF.
How to Download GB/T 47454-2026
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
GB/T 47454-2026
$495.00