GB/T 46247-2025Wind energy generation systems - Wind measurement application of ground-mounted remote sensing technology (English PDF)
风能发电系统 基于地面遥测技术的风能资源测量
This is a limited preview
Buy now to download the full PDF (29 pages)
Need quotation for your management?
Get a formal quotation for GB/T 46247-2025 in 30 minutes.
Issued by
State Administration for Market Regulation
Level / Type
National · Recommended
Issue date
October 5, 2025
Implementation date
October 5, 2025
Scope
GB/T 46247-2025 is the English-translated version of 风能发电系统 基于地面遥测技术的风能资源测量.
GB/T 46247-2025 — IEC 61400-50 specifies the methods and requirements for measuring wind speed (and related parameters such as wind direction and turbulence intensity) using instruments.
For in Wind energy and wind turbine technologies (such as resource assessment and wind turbine testing) described in other documents within the IEC 61400 series must...
Please use these measurements as input for some evaluation and testing procedures. This document is specifically for ground-based remote sensing wind instruments, i.e., instruments that...
This document specifies wind measurement equipment (such as ultrasonic radar or vertical profile radar) installed above or away from the instrument's installation location.
This document excludes other types of remote sensing equipment, such as forward-facing or scanning radar. The following provisions are specified in this document. a) Procedures and requirements for classifying ground-based remote sensing equipment to assess the uncertainty of the sensitivity of remote sensing equipment to meteorological conditions.
Temperature and weather conditions can vary between the location and time of remote sensing equipment calibration and the use case (specific measurement activity); b) Procedures and requirements for calibrating remote sensing equipment; c) Evaluation of wind speed measurement uncertainty; d) Additional checks on the performance of remote sensing equipment and measurement uncertainty during specific measurement activities; e) Applying wind speed uncertainties derived from remote sensing equipment calibration and classification to measurement results during a specific measurement activity (e.g., using...).
Uncertainty or calibration results interpolated to different heights); f) Reporting requirements.
Found what you need?
Document preview — GB/T 46247-2025
National Standard of the People's Republic of China
- ICS
- 27.180
- Classification
- F 11
Issued by: State Administration for Market Regulation
Contents
- Preface
- 1 Scope
- 2 Normative References
- 3 Terms and Definitions
- 4 Symbols, Units, and Abbreviations
- 5 General Principles
- 6 RSD Classification 7.
- 7 RSD Performance Verification
- 8 Evaluation of RSD Measurement Uncertainty
- 9 Other checks
- 10 Applications in SMC
- 11 Report
- Appendix A (Informative) Uncertainty caused by non-uniform airflow within the measurement volume
- References
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents".
Drafting.
This document is equivalent to IEC 61400-50-2:2022 "Wind power generation systems - Part 50-2.Ground-mounted remote sensing technology for wind measurement".
Application of technology.
The following minimal editorial changes have been made to this document.
---To align with existing standards, the standard name has been changed to "Wind Energy Resource Measurement Based on Ground Telemetry Technology for Wind Power Generation Systems".
Please note that some content in this document may involve patents. The issuing organization of this document assumes no responsibility for identifying patents.
This document was proposed by the China Machinery Industry Federation.
This document is under the jurisdiction of the National Technical Committee on Standardization of Wind Power (SAC/TC50).
1 Scope
IEC 61400-50 specifies the methods and requirements for measuring wind speed (and related parameters such as wind direction and turbulence intensity) using instruments. For in Wind energy and wind turbine technologies (such as resource assessment and wind turbine testing) described in other documents within the IEC 61400 series must...
Please use these measurements as input for some evaluation and testing procedures. This document is specifically for ground-based remote sensing wind instruments, i.e., instruments that...
This document specifies wind measurement equipment (such as ultrasonic radar or vertical profile radar) installed above or away from the instrument's installation location.
This document excludes other types of remote sensing equipment, such as forward-facing or scanning radar. The following provisions are specified in this document.
a) Procedures and requirements for classifying ground-based remote sensing equipment to assess the uncertainty of the sensitivity of remote sensing equipment to meteorological conditions.
Temperature and weather conditions can vary between the location and time of remote sensing equipment calibration and the use case (specific measurement activity);
b) Procedures and requirements for calibrating remote sensing equipment;
c) Evaluation of wind speed measurement uncertainty;
d) Additional checks on the performance of remote sensing equipment and measurement uncertainty during specific measurement activities;
e) Applying wind speed uncertainties derived from remote sensing equipment calibration and classification to measurement results during a specific measurement activity (e.g., using...).
Uncertainty or calibration results interpolated to different heights);
f) Reporting requirements.
2 Normative references
The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included.
For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies.
This document.
IEC 61400-50-1 Wind power generation systems – Part 50-1.Wind measurement based on devices installed on the wind measurement tower, nacelle and fairing Note. GB/T 46246-2025 Wind Energy Resource Measurement Based on Wind Measurement Equipment Installed on Wind Measurement Towers, Nacelles and Fairings for Wind Power Generation Systems (IEC 61400-50-1:2022, IDT)
3 Terms and Definitions
The following terms and definitions apply to this document.
accuracy
The degree to which the measured value of the measured object closely approximates the true value.
Complex terrain
The area or obstacles around the test site that can cause significant changes in terrain that can distort airflow.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 29 pages — is available in the English PDF.
Referenced standards
How to Download GB/T 46247-2025
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 46246-2025 — Wind energy generation systems - Wind measurement for applicationof meteorological mast, nacelle and spinner mounted instruments
GB/T 7463-2026 — Surface active agents - Determination of the power to disperse calcium soap - Acidimetric method (Modifled Schoenfeldt method)
GB/T 8336-2026 — Special threads gauges for gas cylinders
Secure payment via Stripe
Payments accepted
GB/T 46247-2025
$560.00