GB/T 46104-2025Power fluctuation adaptability testing methods of water electrolysis system for hydrogen production (English PDF)

电解水制氢系统功率波动适应性测试方法

Open the GB/T 46104-2025 preview as PDF

Preview — first pages of GB/T 46104-2025 (full document: 27 pages)

This is a limited preview

Buy now to download the full PDF (27 pages)

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

August 29, 2025

Implementation date

December 1, 2025

Scope

GB/T 46104-2025 is the English-translated version of 电解水制氢系统功率波动适应性测试方法.

GB/T 46104-2025 is the Chinese national standard covering how an electrolyser copes with being run off wind and solar — the ramp rates and the minimum load it holds, the cold and hot start times, the hydrogen purity and the oxygen crossover at low load where the risk is highest, and the test profiles that stand in for a real day of renewable power. The crossover at low load is the safety limit that decides how far down a renewable-fed electrolyser can be turned. First edition, in force from 1 December 2025. Issued on 29 August 2025, it has been in force since 1 December 2025.

Document preview — GB/T 46104-2025

National Standard of the People's Republic of China

ICS
27.010
Classification
F 19

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • PrefaceIII
  • 1 Scope1
  • 2 Normative references1
  • 3 Terms, definitions and symbols1
  • 3.1 Terms and Definitions1
  • 3.2 Symbol3
  • 4 Test Conditions6
  • 4.1 Testing Boundaries6
  • 4.2 Test Conditions7
  • 5 Reagents7
  • 6 Test Preparation7
  • 6.1 Data Check7
  • 6.2 System Status Check7
  • 6.3 Data Collection Plan7
  • 6.4 Time Synchronization7
  • 7 Measuring instruments7
  • 7.1 General requirements7
  • 7.2 Measuring instruments and installation locations8
  • 7.3 Test instrument accuracy10
  • 8 Test items and test indicators11
  • 9 Test Method12
  • 9.1 Startup Test12
  • 9.2 Rated steady-state performance test15
  • 9.3 Multi-operating steady-state performance test22
  • 9.4 Variable Power Dynamic Performance Test24
  • 9.5 Shutdown Test25
  • 10 Test Report26
  • Appendix A (Informative) Thermal Neutral Voltage27
  • Reference29

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.

Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.

This document was proposed and coordinated by the National Hydrogen Energy Standardization Technical Committee (SAC/TC309).

This document was drafted by: Tongji University, China National Institute of Standardization, Tsinghua Sichuan Energy Internet Research Institute, Xi'an Longi Hydrogen Energy Technology Co., Ltd.

Co., Ltd., Tianjin Continental Hydrogen Equipment Co., Ltd., CSSC (Handan) Perri Hydrogen Energy Technology Co., Ltd., Sinopec New Star Petroleum Co., Ltd.

Limited Liability Company, State Grid Zhejiang Electric Power Co., Ltd. Electric Power Research Institute, State Power Investment Group Science and Technology Research Institute Co., Ltd., China Electric Power Research Institute Co., Ltd., Zhejiang Haozhen Hydrogen Energy Co., Ltd., Dalian Institute of Chemical Physics, Chinese Academy of Sciences, Guangdong Power Grid Co., Ltd.

Guangzhou Power Supply Bureau, Beijing Electric Power Equipment Factory Co., Ltd., Guoneng Hydrogen Technology (Beijing) Co., Ltd., Tsinghua University, Zhejiang University.

The main drafters of this document are: Zhang Cunman, Li Wenying, Yang Yanmei, Xu Wei, Ma Jun, Xiu Kai, Jin Liming, Liu Min, Liu Wei, Luan Hexin, Lü Hong, Yu Hongmei, Wan Yanming, Xu Guizhi, Lin Jin, Zhou Luli, Pan Jun, Chen Yan, Gao Shu, Li Ruixia, Jiao Le, Song Jie, Liu Yun, Li Hang, Gao Danhui, Li Yang, Wang Jiepeng, Ma Junbo, and Zhang Jiahang.

Test method for power fluctuation adaptability of water electrolysis hydrogen production system Warning. This document does not cover all possible safety issues. Users are responsible for taking appropriate safety, health and protection measures and ensuring Comply with the conditions stipulated by relevant national laws and regulations.

1 Scope

This document specifies the test conditions, reagents, test preparation, measuring instruments, test items, and other requirements for the power fluctuation adaptability test of the water electrolysis hydrogen production system.

Targets and test indicators, test methods and test reports.

This document is applicable to the power wave of alkaline water electrolysis hydrogen production system and proton exchange membrane water electrolysis hydrogen production system with a hydrogen production capacity of 5m3/h and above.

The power fluctuation adaptability test of the anion exchange membrane water electrolysis hydrogen production system shall be carried out in accordance with the above.

Note. Unless otherwise specified, the standard state in this document is temperature 0°C, pressure 101.325 kPa (absolute pressure), and the gas volumes in this document are all standard Volume in state.

2 Normative references

GB/T 19774

GB/T 24499

GB/T 37562-2019

3 Terms, definitions and symbols

3.1 Terms and Definitions

The terms and definitions defined in GB/T 19774, GB/T 24499, GB/T 37562-2019 and the following apply to this document.

3.1.1 The ability to adapt to changes in state (loading/unloading) performance

The electrolysis water hydrogen production system is within the maximum power and minimum power range allowed by the manufacturer.

3.1.2

The operating status of the water electrolysis hydrogen production system at the rated pressure, rated temperature and rated current specified by the manufacturer.

3.1.3 coldsteadystate

The main process equipment of the water electrolysis hydrogen production system, such as the power conversion unit, electrolyzer, gas-liquid separation system, etc., are operated without any power input. state.

Note. The electrolyte temperature is consistent with the ambient temperature, the instruments, valves, and pumps are powered on, the control and safety-related auxiliary facilities are in operation, and the hydrogen production system is in operation.

The preparatory work before startup has been completed. The preparatory work before startup includes replacement, purging, water replenishment, alkali solution/pure water circulation, instrument preheating, etc.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 27 pages — is available in the English PDF.

Referenced standards

Editions of GB/T 46104

EditionTitleRevisionStatus
GB/T 46104-2025Power fluctuation adaptability testing methods of water electrolysis system for hydrogen productioncurrent editionCurrent

This page sells the current edition, GB/T 46104-2025. Earlier editions are listed for reference only.

How to Buy GB/T 46104-2025

  1. 1Add to cart. Click the "Buy GB/T 46104-2025" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
27 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 46104-2025

$485.00

$410.00for partners