Valid

GB/T 45977-2025Aircraft auxiliary power system vocabulary (English PDF)

飞机辅助动力系统术语

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 45977-2025 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

August 1, 2025

Implementation date

February 1, 2026

Scope

GB/T 45977-2025 is the English-translated version of 飞机辅助动力系统术语.

GB/T 45977-2025 is the Chinese national vocabulary for aircraft auxiliary power systems. It defines the terms in two groups: the system and subsystem terms and the performance characteristic terms.

The first group covers the auxiliary power system itself, which generates, transmits and converts energy independently of the main engine for engine starting, ground maintenance and in-flight emergencies, and then the integrated power unit (IPU), the auxiliary power unit (APU), the emergency power unit (EPU), the ram air turbine (RAT) and the electronic controller.

The document has no normative references and closes with a bibliography and an index. It applies to the research, production, use and maintenance of aircraft auxiliary power systems. It was issued on 1 August 2025 and has applied since 1 February 2026.

Found what you need?

Document preview — GB/T 45977-2025

National Standard of the People's Republic of China

ICS
49.020
Classification
V 31

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 3.1 System/Subsystem Terminology
  • 3.2 Performance characteristic terms
  • References
  • Index

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.

1 Scope

This document defines common terminology relating to aircraft auxiliary power systems.

This document is applicable to the scientific research, production, use and maintenance of aircraft auxiliary power systems.

2 Normative references

This document has no normative references.

3 Terms and Definitions

3.1 System/Subsystem Terminology

3.1.1 Auxiliary power system

Independent of the main engine, it generates, transmits and converts energy for the aircraft to achieve engine starting, aircraft ground maintenance, air emergency and other scenarios An integrated system that meets energy needs.

Note: Auxiliary power systems include but are not limited to energy generation devices (such as combined power units, auxiliary power units, emergency power units, etc.), engine starters (such as air turbine starter and starting control valve, gas turbine starter, etc.), electronic controller, aircraft accessory casing, intake subsystem, exhaust subsystem, Install subsystems and supporting accessories.

3.1.2 Integrated power unit

A small turbine power unit that is combined with an auxiliary power unit (3.1.3) and an emergency power unit (3.1.4) by sharing a gearbox or turbine.

3.1.3 Auxiliary power unit

A small gas turbine power plant that provides compressed air and/or shaft power to an aircraft.

Note 1. The auxiliary power unit is not used for direct propulsion of the aircraft.

Note 2. The auxiliary power unit generally consists of a compressor, a combustion chamber, a turbine, an accessory gearbox and supporting accessories.

3.1.4 Emergency power unit

A small, non-air-breathing turbine power unit that provides emergency shaft power for an aircraft.

Note: Emergency power unit includes but is not limited to turbine, gas generator, fuel tank, gearbox and control components.

3.1.5 Ram air turbine

A turbine power unit that uses ram air as energy to provide emergency power for aircraft.

3.1.6 Electronic controller

Electronic components that implement the auxiliary power system (3.1.1) functions of starting control, steady-state control, parking control, status monitoring, and health management.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

How to Download GB/T 45977-2025

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 45977-2025

$165.00