Scope

GB/T 44773-2024 is the English-translated version of 高压直流换流站直流功率远方自动控制(ADC)技术规范.

GB/T 44773-2024 is the Chinese national standard covering the system that lets a dispatch centre set the power of an HVDC link of ±100 kV and above and hold it in closed loop — the control, monitoring and alarm required of the master station and of the substation at the converter station, the security policy that decides what a remote command may do, the availability and control performance indicators, and the simulation and field tests before it goes live. An informative appendix lists the telemetry, telesignalling, teleadjustment and remote control points. First edition, under the China Electricity Council. In force from 1 May 2025. Issued on 26 October 2024, it has been in force since 1 May 2025.

Document preview — GB/T 44773-2024

National Standard of the People's Republic of China

ICS
29.240.01
Classification
F 21

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • PrefaceIII
  • 1 Scope1
  • 2 Normative references1
  • 3 Terms and Definitions1
  • 4 Abbreviations2
  • 5 General Requirements2
  • 5.1 Basic Requirements2
  • 5.2 System Architecture2
  • 5.3 System Design Requirements3
  • 6 Basic requirements of the master station4
  • 6.1 Control requirements4
  • 6.2 Monitoring and Alarm4
  • 6.3 Security Policy5
  • 6.4 Statistical Analysis5
  • 7 Basic requirements for substations6
  • 7.1 Control requirements6
  • 7.2 Monitoring and Alarm6
  • 7.3 Security Policy7
  • 7.4 Statistical Analysis7
  • 8 Performance Indicators7
  • 8.1 System Availability7
  • 8.2 Control performance indicators7
  • 9 Test8
  • 9.1 Test Verification Method8
  • 9.2 Simulation Test8
  • 9.3 Field Test8
  • Appendix A (Informative) ADC Telemetry, Telesignaling, Teleadjustment, and Remote Control Information Table9

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.

Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.

This document was proposed by the China Electricity Council.

This document is under the jurisdiction of the National Technical Committee for Standardization of Power System Management and Information Exchange (SAC/TC82).

This document was drafted by: China Southern Power Grid Co., Ltd., China Southern Power Grid Ultra-High Voltage Transmission Company, State Grid Corporation of China, Guangdong Power Grid Co., Ltd., China Southern Power Grid Research Institute Co., Ltd., NARI Technology Co., Ltd., Nanjing NARI BAO ELECTRIC LIMITED.

The main drafters of this document are: Hu Yaping, Zhou Huafeng, Li Jianshe, Gao Hongliang, Liu Jinbo, Xie Guiquan, Gu Huijie, Ding Xiaobing, Liu Kemeng, Nie Yongquan, Wu Wencong, Jiang Wei, Zhao Ruifeng, Li Jin, Wang Jialei, Lu Jiangang, Li Wei, Wu Xiaogang, Chen Genjun, Zhang Kefeng, Peng Chaoyi, He Yubin, Huang Jinhua, He Xiqi, Zhao Huashi, Ye Zhou, Huang Cong, Huang Jianxiang, Xu Danli, Li Wenchao, and Peng Zongming.

Remote automatic control of DC power in HVDC converter stations (ADC) Technical Specifications

1 Scope

This document specifies the system configuration of the DC power remote automatic control master station and substation of the ±100kV and above HVDC converter station.

System architecture, functions, performance, information interaction and testing requirements.

This document is applicable to the design of ADC technology equipment for new (renovation, expansion) construction of power dispatching organizations and converter stations with voltage levels of ±100kV and above.

design, construction, commissioning and operation.

2 Normative references

GB/T 13498

GB/T 13729

GB/T 22390.1

GB/T 33590.2

GB/T 36572

IEC 60870

3 Terms and Definitions

The terms and definitions defined in GB/T 13498, GB/T 33590.2 and GB /Z 14429 and the following terms and definitions apply to this document.

3.1

According to the grid operation conditions, the DC active power control target is calculated in real time, and the DC power of the converter station is automatically closed-loop controlled to achieve the goal of A technical support system for remotely regulating the active power and power regulation rate of a DC transmission system.

Note. Its technical equipment system mainly includes the dispatching organization energy management system, telecontrol transmission channel, DC converter station remote terminal equipment or SCADA system, The DC control and protection system of the flow station, as well as the application software and hardware that realize the DC power automatic control function, is referred to as the ADC system.

3.2 DC control unit DC control unit

HVDC system control objects modeled in the dispatching agency energy management system.

Note. One DC control unit corresponds to a two-terminal, multi-terminal or back-to-back DC transmission system.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 17 pages — is available in the English PDF.

Referenced standards

Editions of GB/T 44773

EditionTitleRevisionStatus
GB/T 44773-2024Technical specifications for remote automatic power control(ADC) of high voltage direct current converter stationcurrent editionCurrent

This page sells the current edition, GB/T 44773-2024. Earlier editions are listed for reference only.

How to Buy GB/T 44773-2024

  1. 1Add to cart. Click the "Buy GB/T 44773-2024" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
17 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 44773-2024

$290.00

$245.00for partners