Valid

GB/T 44639.2-2024Railway applications - Energy measurement system on board trains - Part 2: Energy measurement (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (69 pages)

Need quotation for your management?

Get a formal quotation for GB/T 44639.2-2024 in 30 minutes.

Issued by

State Administration for Market Regulation, China National Standardization Administration

Level / Type

National · Recommended

Issue date

September 29, 2024

Implementation date

April 1, 2025

Scope

GB/T 44639.2-2024 (Railway applications - Energy measurement system on board trains - Part 2: Energy measurement) is available as an English-translated PDF.

GB/T 44639.2-2024 — This document specifies the requirements for the energy measurement functions in an energy measurement system for measuring energy directly taken from and/or Electrical energy fed back to the traction grid system.

This document specifies the current measurement function (e.g. current sensor), voltage measurement function (e.g. voltage sensor) and energy calculation function (e.g. energy meter), as well as the consistency of voltage measurement function, current measurement function, energy calculation function and complete energy measurement function Testing requirements.

This document specifies the metrological requirements for Level 1 electrical energy measurement systems. This document applies to Level 1 electrical energy measurement systems.

The data flow between the functional blocks of the electric energy measurement function and the connection relationship between the functional blocks are shown in Figure 2. Figure 2 Electric energy measurement function structure diagram

Found what you need?

Document preview — GB/T 44639.2-2024

National Standard of the People's Republic of China

ICS
45.060
Classification
S 34

Issued by: State Administration for Market Regulation, China National Standardization Administration

Contents

  • Preface
  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms, definitions, abbreviations and symbols
  • 3.1 Terms and Definitions
  • 3.2 Abbreviations
  • 3.3 Symbols
  • 4 General requirements
  • 4.1 Overview
  • 4.2 Electric energy measurement function
  • 4.3 Sensor
  • 4.4 Electric energy calculation function
  • 5 Conformance Test
  • 5.1 General Principles 29
  • 5.2 Experimental Framework
  • 5.3 Design Review
  • 5.4 Type inspection
  • 5.5 Factory Inspection
  • Appendix A (Normative) EMF Configuration
  • Appendix B (Informative) EMF Accuracy Expression
  • Appendix C (Informative) Recalibration and its mechanism recommendations
  • Appendix D (Normative) External magnetic induction test
  • Appendix E (Informative) Durability Test
  • References

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.

This document is part 2 of GB/T 44639 "Electric Energy Measurement System for Rail Transit Trains".

Lower part.

--- Part 1: General;

--- Part 2: Electrical energy measurement;

--- Part 3: Data processing;

--- Part 4: Communications;

--- Part 5: Conformance test;

--- Part 6: Requirements other than billing.

This document is modified to adopt IEC 62888-2:2018 "Rail transit train power measurement system Part 2: Power measurement".

This document has made the following structural adjustments compared to IEC 62888-2:2018.

--- Appendix A corresponds to Appendix B of IEC 62888-2:2018;

--- Appendix B corresponds to Appendix C of IEC 62888-2:2018;

--- Appendix C corresponds to Appendix D of IEC 62888-2:2018;

--- Appendix D corresponds to Appendix A of IEC 62888-2:2018.

The technical differences between this document and IEC 62888-2:2018 and the reasons are as follows.

---Replace IEC 60085 (see 4.3.3.3, 4.3.4.2, 4.4.3.5) with the normative reference GB/T 11021 to adapt to my country's technology Conditions, increase operability;

--- Replace IEC 60068-2-1 (see 5.4.2.4) with the normative reference GB/T 2423.1 to adapt to my country's technical conditions, and add Operability;

--- Replace IEC 60068-2-30 (see 5.4.2.6) with the normative reference GB/T 2423.4 to adapt to my country's technical conditions, and add Increase operability;

--- Replace IEC 60121 (see 5.4.3.11.1) with the normative reference GB/T 3954 to adapt to my country's technical conditions and increase Operability;

--- Replace IEC 60529 (see 5.4.2.3) with the normative reference GB/T 4208 to adapt to my country's technical conditions and increase operability Sex;

--- Replace IEC 60028 (see 5.4.3.11.1) with the normative reference GB/T 5585.1 to adapt to my country's technical conditions, and add Operability;

--- Replace IEC 61000-4-2 (see 5.4.4.5.3) with the normative reference GB/T 17626.2 to adapt to my country's technical conditions, and add Increase operability;

--- Replace IEC 61000-4-3 (see 5.4.4.5.4) with the normative reference GB/T 17626.3 to adapt to my country's technical conditions, and add Increase operability;

--- Replace IEC 61000-4-4 (see 5.4.4.5.5) with the normative reference GB/T 17626.4 to adapt to my country's technical conditions, and add Increase operability;

--- Replace IEC 61000-4-5 (see 5.4.4.5.7) with the normative reference GB/T 17626.5 to adapt to my country's technical conditions, and add Increase operability;

--- Replace IEC 61000-4-6 (see 5.4.4.5.6) with the normative reference GB/T 17626.6 to adapt to my country's technical conditions, and add Increase operability;

--- Replace IEC 61869 with the normative reference GB/T 20840 (all parts) (see 4.3.2.1, 4.3.2.2.1, 5.4.2.11.1,

--- Replace IEC 62497-1 with the normative reference GB/T 32350.1 (see 4.3.2.2.1, 4.3.2.2.2, 5.3.2.5, 5.4.2.11.1,

--- Deleted the following information. "If EMF is included as a function of traction equipment or auxiliary equipment, there is no need to classify the equipment type.

Marking. " (see 4.2.1.3 of IEC 62888-2:2018) to meet the requirements of Class 1 electrical energy measurement;

--- Deleted the description of "other voltages may be agreed upon by the parties concerned." in the rated voltage (see 4.2.2.1 of IEC 62888-2:2018) to Adapt to the technical conditions of our country;

--- Deleted the description of "other frequencies may be agreed upon by the parties concerned" in the rated frequency (see 4.2.2.3 of IEC 62888-2:2018) to Adapt to the technical conditions of our country;

--- Changed "Continuous magnetic induction from external sources", "Radio frequency electromagnetic field 30kHz~2GHz", "Conducted interference induced by radio frequency field 150kHz~ 80MHz" and "external magnetic induction at the reference frequency", the reference values of the influencing quantities are changed from "equal to zero" to "environmental electromagnetic Field" (see Table 1, Table 1 of IEC 62888-2:2018) to adapt to practical applications;

--- Deleted the requirements for frequencies of 16.7 Hz and 60 Hz (see 4.3.2.3.4, Table 18, 5.4.4.4.3 of IEC 62888-2:2018) because There is no 16.7Hz and 60Hz power supply standard in my country;

--- Deleted the description of analog sensors "The rated value shall be determined by agreement between the supplier and the purchaser." (see IEC 62888-2:2018 4.3.3.1.2) to adapt to my country's national conditions;

--- Changed the functional random vibration test requirements to vibration test requirements (see 5.4.2.8, 5.4.2.8 of IEC 62888-2:2018) to Consistent with GB/T 25119-2021 requirements;

--- Changed the electromagnetic compatibility requirement to "During the test, the ECF should not show any temporary degradation, loss of function or loss of performance." (See 4.4.7.1.3, 4.4.7.1.4, 4.4.7.1.3, 4.4.7.1.4 of IEC 62888-2:2018) to be consistent with GB/T 24338.4-2018 Requires consistency;

--- Changed the test site ambient temperature range to between 5°C and 40°C (see 5.4.3.10, 5.4.3.11.1, 5.4.4.2.2, IEC 62888-2:2018 5.4.3.10, 5.4.3.11.1, 5.4.4.2.2) to adapt to my country's national conditions;

--- Changed the requirement of "A.8 EMF without VMF" to "if applicable" (see A.8, B.8 of IEC 62888-2:2018) to apply should be applied in practice.

The following editorial changes were made to this document.

--- Deleted the standard description of the frequency variation range (see Table 18 of IEC 62888-2:2018), because the frequency specified in the national standard the rate range does not match the actual usage of the equipment;

--- Deleted the European description of frequency change control (see footnote c of Table 18 of IEC 62888-2:2018) and changed the traction unit Description of the operating frequency variation range (see footnote c of Table 18, footnote c of Table 18 of IEC 62888-2:2018) to adapt to my country's national conditions;

--- Deleted the description of the relevant guidelines for heat and fire resistance tests in European countries (see Note 5.4.2.7 of IEC 62888-2:2018);

--- Added the reference standard description of AC active power under harmonic conditions (see B.4.1) to adapt to practical applications.

Introduction

Energy efficiency is essential to meet the challenges of supporting energy policies, protecting the environment and conserving natural resources.

Energy efficiency, especially the standardization of overall energy efficiency of rail transit vehicles, has attracted great attention from the rail transit industry, and relevant standards are being gradually formulated.

The main contents include the definition and boundary of energy efficiency, influencing factors, test methods, etc. GB/T 44639 "Electric Energy Measurement for Rail Transit Trains" the "Electricity Measurement System" aims to standardize the process of obtaining train power data and ensure the reliability of the data. It consists of six parts.

--- Part 1: General. The purpose is to specify the system-level requirements of the energy measurement system and to implement one or more General requirements for equipment with multiple functions.

--- Part 2: Electric energy measurement. The purpose is to specify the requirements for the electric energy measurement function for measuring the electric energy consumed and regenerated by the traction unit.

And the requirements for the voltage measurement function, current measurement function and electric energy calculation function that constitute the electric energy measurement function.

--- Part 3: Data processing. The purpose is to specify the data processing system and ground data collection service in the electric energy measurement system requirements.

--- Part 4: Communications. The purpose is to specify the requirements for on-board data communication services and vehicle-to-ground communication services of the energy measurement system.

These communication services enable data to be transferred between functions within the energy measurement system, between the energy measurement system and other on-board units, and between data Handles exchanges between the system and ground servers.

--- Part 5: Conformance test. The purpose is to specify the consistency test of new energy measurement systems installed on traction units Arrangements, and conformance testing procedures for replacement of equipment and auxiliary components.

--- Part 6: Requirements other than billing. The purpose is to clarify the requirements for energy consumption benchmark testing, daily energy consumption monitoring, and technology research and development.

Able to measure the specific requirements of the system.

The functional structure, main sub-functions and data flow of the train power measurement system are shown in Figure 1.

Figure 1 Schematic diagram of EMS functional structure and data flow

Rail transit train power measurement system Part 2: Electrical energy measurement

1 Scope

This document specifies the requirements for the energy measurement functions in an energy measurement system for measuring energy directly taken from and/or Electrical energy fed back to the traction grid system.

This document specifies the current measurement function (e.g. current sensor), voltage measurement function (e.g. voltage sensor) and energy calculation function (e.g. energy meter), as well as the consistency of voltage measurement function, current measurement function, energy calculation function and complete energy measurement function Testing requirements.

This document specifies the metrological requirements for Level 1 electrical energy measurement systems.

This document applies to Level 1 electrical energy measurement systems.

The data flow between the functional blocks of the electric energy measurement function and the connection relationship between the functional blocks are shown in Figure 2.

Figure 2 Electric energy measurement function structure diagram

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 69 pages — is available in the English PDF.

Referenced standards

How to Download GB/T 44639.2-2024

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
69 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 44639.2-2024

$1,175.00