GB/T 43727-2024Thyristor valves for thyristor controlled series capacitors(TCSC) - Electrical testing (English PDF)
This is a limited preview
Buy now to download the full PDF (28 pages)
Need quotation for your management?
Get a formal quotation for GB/T 43727-2024 in 30 minutes.
Issued by
State Administration for Market Regulation, China National Standardization Administration
Level / Type
National · Recommended
Issue date
March 15, 2024
Implementation date
October 1, 2024
Scope
GB/T 43727-2024 (Thyristor valves for thyristor controlled series capacitors(TCSC) - Electrical testing) is available as an English-translated PDF.
GB/T 43727-2024 — This document specifies routine and type tests on thyristor valves for use in thyristor controlled series capacitor (TCSC) installations for AC transmission.
The tests specified in this document are for air-insulated valves operating in capacitive lift mode or bypass mode. For valves with other insulation types for valves operated in the inductive lift mode, the test requirements and acceptance criteria shall be determined by agreement between the purchaser and the seller.
Found what you need?
Document preview — GB/T 43727-2024
National Standard of the People's Republic of China
- ICS
- 29.240.99
- Classification
- K 46
Issued by: State Administration for Market Regulation, China National Standardization Administration
Contents
- Preface
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Thyristor Controlled Series Capacitor Device (TCSC) Valves and Valve Operation
- 4.1 TCSC and TCSC valve
- 4.2 Current and voltage of TCSC valve in capacitive lift mode
- 4.3 TCSC typical operation mode
- 5 General requirements
- 5.1 Type test execution guidelines
- 5.2 Insulation test conditions
- 5.3 Operating test conditions
- 5.4 Criteria for successful type testing
- 6 Experimental Overview
- 7 Insulation test of valve terminal to valve chamber
- 7.1 Test Purpose
- 7.2 Sample
- 7.3 Test requirements
- 8 Insulation test between valve terminals
- 8.1 Test Purpose
- 8.2 Test sample
- 8.3 Test requirements
- 9 Periodic triggering and shut-off test
- 9.1 Test Purpose
- 9.2 Sample
- 9.3 Test requirements
- 10 Fault current test
- 10.1 Test Purpose
- 10.2 Test sample
- 10.3 Test requirements
- 11 Valve electromagnetic interference resistance test
- 11.1 Test Purpose
- 11.2 Sample
- 11.3 Test requirements
- 12 Special performance test
- 12.1 Test Purpose
- 12.2 Sample
- 12.3 Test requirements
- 13 Routine test
- 13.1 General
- 13.2 Appearance Inspection
- 13.3 Wiring Check
- 13.4 Voltage balancing circuit inspection
- 13.5 Withstand voltage test
- 13.6 Partial discharge test
- 13.7 Inspection of auxiliary components
- 13.8 Trigger Check
- 13.9 Cooling system pressure test
- 14 Description of type test results
- Appendix A (Informative) Operating conditions and rated parameters of thyristor valves for thyristor-controlled series capacitor devices
- A.1 Overview
- A.2 TCSC characteristics
- A.3 Operating range
- A.4 Rated reactive power
- A.5 Power Oscillation Damping (POD)
- A.6 Subsynchronous Resonance Suppression
- A.7 Harmonics
- A.8 Control of interaction between multiple TCSCs in parallel circuits
- A.9 Operating range, overvoltage and load cycle
- Appendix B (Informative) Valve Component Fault Tolerance
- Reference
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.
This document is equivalent to IEC 62823:2019 "Electrical testing of thyristor valves for thyristor controlled series capacitors (TCSC)".
The following minimal editorial changes were made to this document.
---Added formula number;
--- Add "Note 3" in 3.7 (see 3.7);
--- Add "Note" in 5.2.1 and 8.2 (see 5.2.1 and 8.2);
---Change the name of the insulation test between valve terminals and valve chamber and the insulation test between valve terminals from "AC test" to "AC voltage test" (See Table 2, 7.3.1, 8.3.1 and 8.3.2.1);
--- Correct the "maintain test voltage Utv11min" in the AC voltage insulation test procedure between valve terminals to "maintain test voltage Utv1 15s"(see 8.3.1.2);
--- Change the text symbol "SIPLV" of the valve arrester operating impulse protection level to "USIPLv" to conform to the writing rules of the quantity symbol.
Then (see 8.3.2.1).
1 Scope
This document specifies routine and type tests on thyristor valves for use in thyristor controlled series capacitor (TCSC) installations for AC transmission.
The tests specified in this document are for air-insulated valves operating in capacitive lift mode or bypass mode. For valves with other insulation types for valves operated in the inductive lift mode, the test requirements and acceptance criteria shall be determined by agreement between the purchaser and the seller.
2 Normative references
The contents of the following documents constitute the essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to this document.
IEC 60060-1:2010 High-voltage test technology Part 1: General definitions and test requirements (High-voltagetesttech-Note. GB/T 16927.1-2011 High voltage test technology Part 1: General definitions and test requirements (IEC 60060-1:2010, MOD) IEC 60071-1 Insulation coordination - Part 1: Definitions, principles and rules Definitions, principles and rules) Note. GB/T 311.1-2012 Insulation coordination Part 1: Definitions, principles and rules (IEC 60071-1:2006, MOD) IEC 60071-2 Insulation coordination-Part 2: Application guide Note. GB/T 311.2-2013 Insulation coordination Part 2: Guidelines for use (IEC 60071-2:1996, MOD) urements Note. GB/T 7354-2018 High voltage test technology Partial discharge measurement (IEC 60270:2000, MOD)
3 Terms and definitions
The following terms and definitions apply to this document.
Thyristor valve
The electrical and mechanical combination of a thyristor stage, including all connections, auxiliary components and mechanical structure, capable of being installed with a thyristor controlled series capacitor the phase reactors are connected in series.
Valve section
An electrical combination of several thyristor stages and other components that scales to give the electrical performance of a complete valve.
Note. This term is mainly used to define the test sample during valve testing.
Thyristor level
The component of a thyristor valve, consisting of an anti-parallel thyristor pair and its directly connected auxiliary components and reactor (if any).
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 28 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 16927.1-2011High-voltage test techniques -- Part 1: General definitions and test requirements
- GB/T 7354-2018High-voltage test techniques -- Partial discharge measurements
IEC 60060 · IEC 60071 · GB/T 311.1-2012 · GB/T 311.2-2013 · IEC 60270
How to Download GB/T 43727-2024
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 16927.1-2011 — High-voltage test techniques -- Part 1: General definitions and test requirements
GB/T 7354-2018 — High-voltage test techniques -- Partial discharge measurements
GB/T 47316-2026 — Road vehicles - Visibility - Method for establishment of eyellipses for driver eye location
Secure payment via Stripe
Payments accepted
GB/T 43727-2024
$500.00