GB/T 43595-2023Directives for commissioning and operation of hydraulic turbines, pump-turbines and storage pumps (English PDF)
水轮机、水泵水轮机和蓄能泵启动试验及试运行导则
This is a limited preview
Buy now to download the full PDF (34 pages)
Need quotation for your management?
Get a formal quotation for GB/T 43595-2023 in 30 minutes.
Issued by
State Administration for Market Regulation, China National Standardization Administration
Level / Type
National · Recommended
Issue date
December 28, 2023
Implementation date
January 1, 2025
Scope
GB/T 43595-2023 is the English-translated version of 水轮机、水泵水轮机和蓄能泵启动试验及试运行导则.
GB/T 43595-2023 — This document gives the general start-up test and trial operation procedures for hydraulic turbines, water pump turbines, and energy storage pumps, and provides the start-up procedures for the above equipment: Provide guidance on dynamic testing and trial operation: This document does not describe in detail the start-up test and trial operation of the auxiliary equipment of the hydraulic turbine, water pump turbine and energy storage pump: It is considered that the auxiliary equipment the start-up test and trial operation of auxiliary equipment are completed separately: This document is applicable to unit equipment with a capacity of 15MW and above or a nominal diameter of 3m and above, and a capacity below 15MW or with a nominal diameter of Unit equipment with a diameter of less than 3m shall be implemented in accordance with IEC 62006: This document is binding only with the consent of the parties: This document does not include matters of purely commercial interest unless the matter is closely related to commissioning and commissioning work: This document does not cover flow channels, gates, drainage pumps, cooling water equipment, generators, generator motors, electrical devices (such as circuit breakers, transformers) and other single commissioning, unless its commissioning is inseparable from the start-up test of the turbine, water pump turbine and energy storage pump: When the relevant documents, drawings or information specified in this document are provided by one (or more) suppliers, each supplier shall provide information related to its own business: related information:
Found what you need?
Document preview — GB/T 43595-2023
National Standard of the People's Republic of China
- ICS
- 27.140
- Classification
- K 55
Issued by: State Administration for Market Regulation, China National Standardization Administration
Contents
- Preface
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 3.1 Units and equipment
- 3.2 Tests, cycles and operating modes
- 4 Operating conditions
- 4.1 General provisions
- 4.2 Documents, information and guidance
- 4.3 Final installation phase before starting the test
- 5 Start test
- 5.1 General provisions
- 5.2 Launching the overall command and organizational structure of the test
- 5.3 Preparation before starting
- 5.4 First start
- 5.5 Starting the test phase
- 5.6 End of startup test
- 6 Runs
- 6.1 General provisions
- 6.2 Assessment operation period
- 6.3 Commercial operation
- Appendix A (informative) Conversion of reversible pump turbine under different operating conditions
- A:1 General provisions
- A:2 From standby (ready) to standby (auxiliary system operational) (01 and 10)
- A:3 From standby (auxiliary system is running) to no-load (synchronous grid connection) (12)
- A:4 From no-load (synchronized to the grid) to standby (21)
- A:5 From no-load to turbine operation (23)
- A:6 From turbine operation to no-load (synchronous grid connection) (32)
- A:7 From no-load to synchronous phase-modulated operation (turbine direction) (24)
- A:8 From synchronous phase-modulated operation (turbine direction) to no-load (42)
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents" Drafting:
This document is equivalent to IEC 60545:2021 "Guidelines for startup testing and commissioning of hydraulic turbines, water pump turbines and energy storage pumps":
This document has made the following minimal editorial changes:
---Change the name of the standard to "Guidelines for startup testing and trial operation of hydraulic turbines, water pump turbines and energy storage pumps";
---Introductory words have been added before the items in 5:1:6:2, 5:1:6:3 and 5:1:6:5 respectively:
Please note that some content in this document may be subject to patents: The publisher of this document assumes no responsibility for identifying patents:
1 Scope
This document gives the general start-up test and trial operation procedures for hydraulic turbines, water pump turbines, and energy storage pumps, and provides the start-up procedures for the above equipment:
Provide guidance on dynamic testing and trial operation:
This document does not describe in detail the start-up test and trial operation of the auxiliary equipment of the hydraulic turbine, water pump turbine and energy storage pump: It is considered that the auxiliary equipment the start-up test and trial operation of auxiliary equipment are completed separately:
This document is applicable to unit equipment with a capacity of 15MW and above or a nominal diameter of 3m and above, and a capacity below 15MW or with a nominal diameter of Unit equipment with a diameter of less than 3m shall be implemented in accordance with IEC 62006:
This document is binding only with the consent of the parties:
This document does not include matters of purely commercial interest unless the matter is closely related to commissioning and commissioning work:
This document does not cover flow channels, gates, drainage pumps, cooling water equipment, generators, generator motors, electrical devices (such as circuit breakers, transformers) and other single commissioning, unless its commissioning is inseparable from the start-up test of the turbine, water pump turbine and energy storage pump:
When the relevant documents, drawings or information specified in this document are provided by one (or more) suppliers, each supplier shall provide information related to its own business:
related information:
2 Normative reference documents
This document has no normative references:
3 Terms and definitions
The following terms and definitions apply to this document:
3.1 Units and equipment 3.1.1 hydraulic machinery Turbines, storage pumps, pump turbines, valves, thrust bearings and guide bearings used in hydropower stations and pumped storage power stations:
Note 1: Including hydraulic conversion device and various types of water inlet main valves:
Note 2: Excluding turbine regulating system, see IEC 60308 for relevant terms of turbine regulating system:
[Source: IEC TR61364:1999,3:1, modified] 3.1.2 hydraulic machine Pelton or impact turbine, accumulator pump or pump turbine:
[Source: IEC TR61364:1999,3:1] 3.1.3 water turbine A device that converts water energy into mechanical energy:
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 34 pages — is available in the English PDF.
How to Download GB/T 43595-2023
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
Secure payment via Stripe
Payments accepted
GB/T 43595-2023
$500.00