GB/T 43327.6-2023Petroleum and natural gas industries - Specific requirements for offshore structures - Part 6: Marine operations (English PDF)
石油天然气工业 海洋结构物特殊要求 第6部分:海上作业
This is a limited preview
Buy now to download the full PDF (127 pages)
Need quotation for your management?
Get a formal quotation for GB/T 43327.6-2023 in 30 minutes.
Issued by
State Administration for Market Regulation, China National Standardization Administration
Level / Type
National · Recommended
Issue date
November 27, 2023
Implementation date
March 1, 2024
Scope
GB/T 43327.6-2023 is the English-translated version of 石油天然气工业 海洋结构物特殊要求 第6部分:海上作业.
GB/T 43327.6-2023 — This document specifies requirements and guidance for the planning and engineering design of offshore operations, including the design and analysis of components required for offshore operations: software, systems, equipment and processes, and methods or procedures for safely performing these operations: This document applies to offshore operations on offshore structures, including: ---Steel and concrete gravity base structures (GB S); ---Pile-based steel structure and compliant tower; ---Tension Leg Platform (TLP); ---Deep draft floating body (DDF), including deep draft column platform or deep draft caisson device (DDCV); ---Semi-submersible production platform (FPSS); ---Floating production, storage and offloading unit (FPSO); ---Other types of floating production systems (FPS); ---Mobile offshore units (MOU); ---The upper modules and components of the above structures; ---Underwater foundations and similar structures; ---Gravity anchors, anchor piles, towed embedded anchors, suction anchors or other types of anchors; ---Tendon base; ---Related mooring systems: This document also applies to modifications to existing structures, such as the installation of new topside blocks: This document does not apply to the following offshore operations: a) Not exposed to the marine environment such as construction on land construction sites; b) Drilling, process and petrochemical operations; c) Daily routine offshore operations during the service life of the structure; d) Drilling operations on mobile offshore drilling units; e) Installation of subsea pipelines, risers and umbilicals; f) Diving operations:
Found what you need?
Document preview — GB/T 43327.6-2023
National Standard of the People's Republic of China
- ICS
- 75.180.10
- Classification
- E 94
Issued by: State Administration for Market Regulation, China National Standardization Administration
Contents
- Preface
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Symbols and abbreviations
- 4.1 Symbol
- 4.2 Abbreviations
- 5 General
- 5.1 Requirement
- 5.2 Jurisdiction
- 5.3 HSE Plan
- 5.4 Risk Management
- 5.5 Job Safety Analysis
- 5.6 Environmental Impact Study
- 5.7 Operation, qualification, work and safety training
- 5.8 Incident reporting
- 5.9 Personnel tracking
- 5.10 Approval from Government Agencies
- 6 Organization, documentation and planning
- 6.1 General
- 6.2 Organization and communication
- 6.3 Quality Assurance and Management Procedures
- 6.4 Technical procedures
- 6.5 Technical Documentation
- 6.6 Certification and documentation
- 6.7 Systems and Equipment
- 7 Marine meteorology and seismic requirements
- 7.1 General
- 7.2 Weather restricted and weather unrestricted operations
- 7.3 Meteorological conditions
- 7.4 Meteorological acceptance criteria
- 7.5 Climate window
- 7.6 Job duration
- 7.7 Marine meteorological forecast
- 7.8 Earthquake
- 8 Weight Control
- 8.1 General
- 8.2 Weight control level
- 8.3 Margin for Level A
- 8.4 Weight and center of gravity constraints
- 8.5 Weight Control Audit
- 8.6 Dimensional control
- 9 Stability
- 9.1 Overview
- 9.2 General requirements
- 9.3 Stability calculation
- 9.4 Complete stability
- 9.5 Damage stability
- 9.6 Single vessel transport
- 9.7 Multi-ship transport
- 9.8 Classified ships
- 9.9 Self-floating structure
- 9.10 Shipment operations
- 9.11 Watertight integrity and temporary closures
- 9.12 Tilt test
- 10 Ballast operations
- 10.1 Overview
- 10.2 Ballast system
- 10.3 Damage protection
- 10.4 Protection measures against water intrusion under damaged conditions
- 10.5 Control and indication systems
- 10.6 Pump
- 10.7 Valve arrangement
- 10.8 Exhaust system
- 10.9 Air Cushion System Capabilities
- 10.10 System Test
- 11 Shipment
- 11.1 Overview
- 11.2 Classification of shipment
- 11.3 Loaded structures
- 11.4 Site and Marina
- 11.5 Barge
- 11.6 Connecting beams, slideways and sliding shoes
- 11.7 Temporary mooring systems
- 11.8 Bottom loading
- 11.9 Pumps and ballast
- 11.10 Shipment by trailer, SPMT or hydraulic skid
- 11.11 Traction system design, redundancy and backup
- 11.12 Floating to semi-submersible vessel or barge
- 11.13 Barge Recovery and Shipment Fixing
- 11.14 Tugboat
- 11.15 Management and Organization
- 11.16 Shipping Manual
- 12 Tow
- 12.1 Overview
- 12.2 General requirements
- 12.3 Towing power requirements, fleet composition and towing arrangements
- 12.4 Tow 54 out of dry dock
- 12.5 Offshore towage
- 12.6 Maritime towage
- 12.7 Dry towing or towing on heavy barges
- 12.8 Towage Manual
- 13 Temporary mooring and offshore positioning operations
- 13.1 General
- 13.2 Environmental conditions
- 13.3 Determination of mooring response
- 13.4 Mooring line design
- 13.5 Anchor design
- 13.6 Accessory design
- 13.7 Mooring line component design
- 13.8 Clearance under extreme conditions
- 13.9 Mooring tension
- 13.10 Other positioning methods
- 14 Floating construction and outfitting
- 14.1 General
- 14.2 Structural strength and stress
- 14.3 Building fleet
- 14.4 Welding
- 15 Upper module float installation
- 15.1 Overview
- 15.2 Environmental considerations
- 15.3 Structural considerations
- 15.4 Clearance
- 15.5 Upper module lowering guide system
- 15.6 Factors to consider in assignments
- 15.7 Floatover Manual
- 16 Pre-arranged mooring system
- 16.1 General
- 16.2 Installation plan
- 16.3 Installation of towed embedded anchor
- 16.4 Flat anchor installation
- 16.5 Suction anchor installation
- 16.6 Anchor pile installation
- 16.7 Gravity Anchor Installation
- 16.8 Mooring system connections
- 16.9 Chain
- 16.10 Wire rope
- 16.11 Synthetic fiber rope
- 16.12 Tension leg platform tendon
- 16.13 Mooring Installation Manual
- 17 Offshore installation operations
- 17.1 Requirement
- 17.2 Installation location
- 17.3 The effects and corresponding movements of floating structures
- 17.4 Systems and Equipment
- 17.5 Slip launching
- 17.6 Floating
- 17.7 Righting
- 17.8 Ballast
- 17.9 Lifting and lowering by external means
- 17.10 Devolution via ballast
- 17.11 Active and passive seabed precise positioning
- 17.12 Penetration of skirt structures
- 17.13 Bottom foundation grouting
- 17.14 Piling
- 17.15 Accessories for pre-arranged mooring systems
- 17.16 Connections of the musculotendinous system
- 17.17 Offshore completion
- 17.18 Workbook
- 18 Hoisting operations
- 18.1 General
- 18.2 Rigging geometry
- 18.3 Action and action effects
- 18.4 Strength of slings, and shackles
- 18.5 Design Verification
- 18.6 Lifting point design
- 18.7 Gap
- 18.8 Anti-collision parts and guides
- 18.9 Heave compensation hoisting operations
- 18.10 Hoisting operations of dynamic positioning ships
- 18.11 Empirical methods
- 18.12 Hoisting Operation Manual
- 19 Abandonment and demolition
- 19.1 Overview
- 19.2 Demolition plan
- 19.3 Preparation for dismantling
- 19.4 Demolition
- 19.5 Transport and disposal
- 19.6 Site Cleanup
- Appendix A (informative) Additional information and guidance
- Appendix B (Informative) Regional Information
- Reference
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents" Drafting:
This document is Part 6 of GB/T 43327 "Special Requirements for Marine Structures in the Oil and Gas Industry": GB/T 43327 has been the following sections were published:
---Part 6: Offshore operations:
This document is equivalent to ISO :19901-6:2009 "Special requirements for offshore structures in the oil and gas industry - Part 6: Offshore Operation":
This document has made the following minimal editorial changes:
---Incorporates the technical errata content of ISO :19901-6:2009/Cor1:2011, and the outer margins of the clauses involved Indicated with vertical double lines (||):
Please note that some content in this document may be subject to patents: The publisher of this document assumes no responsibility for identifying patents:
Introduction
Offshore operations have high technical content, high construction risks, high operating costs, complex operating procedures, and are affected by geological, meteorological and marine environmental conditions:
Severely restrictive features: The overall goal of GB/T 43327.6 is to ensure that specified and recognized safety standards are met wherever offshore operations are carried out:
within the full or confidence level: The design and implementation of offshore operations require special attention to national regulations in the operating area, and many factors need to be considered and reasonably controlled:
elements, as well as other standards, specifications and guidelines to ensure an acceptable level of safety in offshore operations:
GB/T 43327 "Special Requirements for Marine Structures in the Oil and Gas Industry" is applicable to various types of marine structures: This series of standards is intended to Provides wide freedom in the choice of structural configurations, materials and technologies so that innovation is not hindered: Therefore, when using these international standards when doing so, it is necessary to make reasonable engineering judgment: GB/T 43327 is planned to consist of nine parts:
---Part 1: Marine hydrometeorological design and operations: The purpose is to provide for the hydrology and meteorology in the design, construction and operation of offshore structures:
General requirements for condition determination and use:
---Part 2: Seismic design regulations and guidelines: The purpose is to provide procedures and standards for defining the seismic design of marine structures:
various requirements:
---Part 3: Upper module structure: The purpose is to provide the full life cycle of the design, construction, installation and maintenance of the superstructure module structure:
recommended practices:
---Part 4: Geotechnical engineering and foundation design: The purpose is to give provisions for the geotechnical and foundation engineering of marine structures:
---Part 5: Weight Management: The purpose is to stipulate the management and control of the weight and center of gravity of offshore facilities at each stage of the life cycle:
Require:
---Part 6: Offshore operations: The purpose is to provide requirements and guidance for planning and engineering design of offshore operations:
---Part 7: Positioning systems for offshore floating structures and offshore mobile devices: The purpose is to provide information on floating structures and mobile offshore Design, analysis and evaluation of upper device positioning systems:
---Part 8: Marine Soil Survey: The purpose is to give recommendations and guidelines for marine soil surveys:
---Part 10: Marine Geophysical Survey: The purpose is to give requirements and guidelines for marine geophysical surveys:
Special requirements for offshore structures in the oil and gas industry Part 6: Offshore operations
1 Scope
This document specifies requirements and guidance for the planning and engineering design of offshore operations, including the design and analysis of components required for offshore operations:
software, systems, equipment and processes, and methods or procedures for safely performing these operations:
This document applies to offshore operations on offshore structures, including:
---Steel and concrete gravity base structures (GB S);
---Pile-based steel structure and compliant tower;
---Tension Leg Platform (TLP);
---Deep draft floating body (DDF), including deep draft column platform or deep draft caisson device (DDCV);
---Semi-submersible production platform (FPSS);
---Floating production, storage and offloading unit (FPSO);
---Other types of floating production systems (FPS);
---Mobile offshore units (MOU);
---The upper modules and components of the above structures;
---Underwater foundations and similar structures;
---Gravity anchors, anchor piles, towed embedded anchors, suction anchors or other types of anchors;
---Tendon base;
---Related mooring systems:
This document also applies to modifications to existing structures, such as the installation of new topside blocks:
This document does not apply to the following offshore operations:
a) Not exposed to the marine environment such as construction on land construction sites;
b) Drilling, process and petrochemical operations;
c) Daily routine offshore operations during the service life of the structure;
d) Drilling operations on mobile offshore drilling units;
e) Installation of subsea pipelines, risers and umbilicals;
f) Diving operations:
2 Normative reference documents
The contents of the following documents constitute essential provisions of this document through normative references in the text: Among them, the dated quotations for undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document:
ISO 15544 Requirements and guidance for emergency response in offshore production installations in the oil and gas industry (Petroleum and natural sponse) ISO 17776 Management of major accident hazards during the design period of new offshore production units in the oil and gas industry (Petroleum
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 127 pages — is available in the English PDF.
How to Download GB/T 43327.6-2023
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
Secure payment via Stripe
Payments accepted
GB/T 43327.6-2023
$2,075.00