GB/T 42599-2023Wind energy generation systems - Electrical simulation model validation (English PDF)
风能发电系统 电气仿真模型验证
This is a limited preview
Buy now to download the full PDF (37 pages)
Need quotation for your management?
Get a formal quotation for GB/T 42599-2023 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
May 23, 2023
Implementation date
May 23, 2023
Scope
GB/T 42599-2023 is the English-translated version of 风能发电系统 电气仿真模型验证.
GB/T 42599-2023 is the Chinese standard "Wind energy generation systems - Electrical simulation model validation".
Its scope clause reads: This document specifies the verification procedure for electrical simulation models of wind turbines and wind farms for power system and grid stability analysis: The test data for model verification is obtained according to the IEC 61400-21 series of documents: This document applies to the general model and other fundamental frequency wind turbine and wind farm models: The wind turbine model verification project includes fault ride-through capability and control characteristic simulation verification: Fault ride-through capability including wind power generation The unit model responds to voltage drop and voltage rise under balance and unbalance: Control features include active power control, frequency control, inertial Quantity control and reactive power control: The test data used for the verification of the wind turbine model is based on the test procedures specified in IEC 61400-21-1: The certificate is at the output end of the wind turbine: Since IEC 61400-21-2, which specifies the content and methods of wind farm testing, is still in the preparation stage, this document does not specify wind power in detail: The reference point for wind farm model verification is the wind farm access point (hereinafter referred to as "grid connection point"): Note: The wind farm access point is also called the grid connection point of the wind farm: The model verification procedure specified in this document is based on the comparison of test data and simulation data, and the verification results do not depend on the selection of simulation software:. Its clauses include terms, definitions, abbreviations and subscripts.
Found what you need?
Document preview — GB/T 42599-2023
National Standard of the People's Republic of China
- ICS
- 27.180
- Classification
- F11
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms, Definitions, Abbreviations and Subscripts
- 4 Symbols and units
- 5 Model Validation Procedure Requirements
- 6 General methods for model validation
- 7 Wind Turbine Model Validation
- 8 Wind Farm Model Validation
- Appendix A (Informative) Wind Turbine Model Verification Report
- Appendix B (Informative) Wind Farm Model Verification Report
- Appendix C (informative) Typical power grid for inter-model verification
- Appendix D (Informative) Uncertainty of Model Validation
- Appendix E (Normative) Digital second-order critically damped low-pass filter
- Appendix F (Informative) Additional Verification Method for Active Power Recovery Characteristics of Voltage Drop Fault
- Appendix G (informative) Model common software interface in different software environments
1 Scope
This document specifies the verification procedure for electrical simulation models of wind turbines and wind farms for power system and grid stability analysis:
The test data for model verification is obtained according to the IEC 61400-21 series of documents: This document applies to the general model and other fundamental frequency wind turbine and wind farm models:
The wind turbine model verification project includes fault ride-through capability and control characteristic simulation verification: Fault ride-through capability including wind power generation
The unit model responds to voltage drop and voltage rise under balance and unbalance: Control features include active power control, frequency control, inertial
Quantity control and reactive power control: The test data used for the verification of the wind turbine model is based on the test procedures specified in IEC 61400-21-1:
The certificate is at the output end of the wind turbine:
Since IEC 61400-21-2, which specifies the content and methods of wind farm testing, is still in the preparation stage, this document does not specify wind power in detail:
The reference point for wind farm model verification is the wind farm access point (hereinafter referred to as "grid connection point"):
Note: The wind farm access point is also called the grid connection point of the wind farm:
The model verification procedure specified in this document is based on the comparison of test data and simulation data, and the verification results do not depend on the selection of simulation software:
2 Normative references
The contents of the following documents constitute the essential provisions of this document through normative references in the text: Among them, dated references
For documents, only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document:
Note: GB/T 2900:53-2001 Electrotechnical Terminology Wind Turbine Generating Sets (IEC 60050-415:1999, IDT):
IEC 61400-21-1 Wind power generation systems Part 21-1: Measurement and evaluation methods for electrical characteristics of wind turbines (Winden- turbines)
IEC 61400-27-1 Wind energy generation system Part 27-1: General model of electrical simulation model (Windenergy
Note: GB/T 36237-2023 General electrical simulation model of wind power generation system (IEC 61400-27-1:2020, IDT):
3 Terms, Definitions, Abbreviations and Subscripts
3:1 Terms and Definitions
The terms and definitions defined in IEC 60050-415 and the following apply to this document:
3:1:1 application range
Applicability of the electrical simulation model:
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 37 pages — is available in the English PDF.
Referenced standards
Normative references
GB/T 2900 · IEC 60050 · IEC 61400
Similar standards
GB 38031-2025|GB/T42599-2023|GB/T 1|GB/T 2900|GB/T 36237-2023|GB/T 25387.1|GB/T 25388.1|GB/T 25389.1
How to Download GB/T 42599-2023
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 2900.1-2008 — Electrotechnical terminology - Fundamental terms
GB/T 2900.10-2013 — Electrotechnical terminology -- Electric cables
GB/T 2900.100-2017 — Electrotechnical terminology -- Superconductivity
Secure payment via Stripe
Payments accepted
GB/T 42599-2023