Valid

GB/T 42440-2023Shale gas—The technical requirements for water supply and transportation system of industrial fracturing (English PDF)

页岩气 工厂化压裂用水输送系统技术要求

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 42440-2023 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

May 23, 2023

Implementation date

September 1, 2023

Scope

GB/T 42440-2023 is the English-translated version of 页岩气 工厂化压裂用水输送系统技术要求.

This document sets out the technical requirements for the water supply and transport system used in the industrial fracturing of shale gas. It covers the design water volume, the intake of water, and the supply and transfer arrangements of the water delivery system.

It also covers the health, safety and environmental protection requirements that apply to such a system, together with the requirements on saving energy and water.

The document applies to the surface engineering design of fracturing water delivery systems for onshore shale gas fields that are newly built, expanded or reconstructed.

Found what you need?

Document preview — GB/T 42440-2023

National Standard of the People's Republic of China

ICS
75.020
Classification
E 16

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 Basic Requirements
  • 5 Design water volume
  • 6 fetch water
  • 7 Water supply to water
  • 8 Health, safety, environmental protection (HSE) and energy saving, water saving
  • Appendix A (informative) Example of shale gas industrial fracturing water delivery system

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules for Standardization Documents" drafting.

1 Scope

This document specifies the design water volume, water intake, water supply and transfer of water delivery system for industrial fracturing of shale gas, as well as health, safety and environmental protection. (HSE) and energy-saving, water-saving and other technical requirements.

This document is applicable to the surface engineering design of the factory fracturing water delivery system for newly built, expanded and reconstructed onshore shale gas fields.

2 Normative references

The contents of the following documents constitute the essential provisions of this document through normative references in the text. Among them, dated references For documents, only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document.

GB 50013 Outdoor Water Supply Design Standards

GB 50265 Code for Design of Pumping Stations

NB/T 14002.3 Shale Gas Reservoir Stimulation Part 3: Fracturing Flowback Fluid Recovery and Treatment Methods

SY/T 6331 Technical Code for Energy Conservation in Gas Field Surface Engineering Design

3 Terms and Definitions

The following terms and definitions apply to this document.

3.1 Reuse water

After the fracturing flowback fluid is treated, it is used to prepare water for shale gas fracturing fluid.

3.2 Water supply system

The general term for various facilities used for industrial fracturing of shale gas to transport clean water.

Note: Including water supply pumping station, water supply pipe network, water supply and storage facilities and ancillary facilities.

3.3 Water transfer system

The general term for various facilities that transfer fracturing flowback fluid, reused water, clean water and their mixed fluids through factory fracturing of shale gas.

Note: Including water transfer pumping station, water transfer pipe network, water transfer and storage facilities and ancillary facilities.

4 Basic requirements

4.1 The shale gas industrial fracturing water delivery system includes water intake, water supply system and water transfer system, see Appendix A for examples.

4.2 The shale gas industrial fracturing water delivery system should be based on urban planning, platform deployment, drilling test progress, natural and geological conditions, water supply and transfer The scale and other conditions, combined with the gas reservoir and drilling and production projects of the development plan, are comprehensively determined through technical and economic comparison.

4.3 The design of the shale gas industrial fracturing water delivery system should be based on the principle of combining short-term and long-term and focusing on the short-term, with overall planning and phased implementation

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 42440-2023

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 42440-2023

$180.00