GB/T 42034-2022Technical specification for floating production storage offloading unit (English PDF)

浮式生产储油装置总体技术规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (33 pages)

Need quotation for your management?

Get a formal quotation for GB/T 42034-2022 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

October 12, 2022

Implementation date

October 12, 2022

Scope

GB/T 42034-2022 is the English-translated version of 浮式生产储油装置总体技术规范.

GB/T 42034-2022 is the Chinese national specification for the overall design of a floating production storage and offloading unit (FPSO).

Its contents list covers the design basis and principles, the hull as a whole - load capacity, lightship weight, general layout, compartment planning, mooring form, loading and stability, motion performance, towing resistance and tank tests - and then crude oil export, hull structure analysis and design, outfitting, interior outfitting, machinery and piping, electrical systems, instrument control, communication, HVAC, anti-corrosion and the topside module.

Clause 1 applies it to the design of newly built FPSOs engaged in oil and gas development in sea areas under Chinese jurisdiction, and adds that FPSOs converted from old tankers and other offshore floating production facilities may take it as a design reference. Issued on 12 October 2022, it has applied since the same date.

Found what you need?

Document preview — GB/T 42034-2022

National Standard of the People's Republic of China

ICS
75.180.10
Classification
E 94

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 Design Basis and Principles
  • 4.1 Design basis
  • 4.2 Design principles and requirements
  • 5 hull overall
  • 5.1 Weight of floating unit
  • 5.1.1 Load capacity
  • 5.1.2 Empty ship weight
  • 5.2 Overall Design
  • 5.2.1 General
  • 5.2.2 General layout
  • 5.2.3 Compartment planning
  • 5.2.4 Profile
  • 5.3 Mooring form
  • 5.4 Overall Performance Analysis
  • 5.4.1 Loading and stability
  • 5.4.2 Sports performance
  • 5.4.3 Towing resistance
  • 5.4.4 Tank test
  • 6 Crude oil export
  • 6.1 General
  • 6.2 Export operation
  • 6.3 Crude oil export system
  • 7 Hull structure
  • 7.1 General
  • 7.2 Principles of Analysis
  • 7.2.1 Finite element analysis and check of cabin section
  • 7.2.2 Finite element analysis and check of local structure
  • 7.2.3 Fatigue analysis
  • 7.3 Design load
  • 7.4 Structural Design
  • 7.4.1 Mid-section design
  • 7.4.2 Typical strong frame design
  • 7.4.3 Hull girder structure design
  • 7.4.4 Hull bottom structure design
  • 7.4.5 Single-point strengthening structure design
  • 7.4.6 Anti-collision structural design
  • 7.4.7 Model buttress structure design
  • 7.4.8 Other special structural designs
  • 8 Outfitting
  • 8.1 Anchors, mooring and towing equipment
  • 8.1.1 Anchor device
  • 8.1.2 Mooring winches
  • 8.1.3 Wharf mooring lines
  • 8.1.4 Mooring outfitting
  • 8.1.5 Towing equipment
  • 8.1.6 Anti-collision and fender equipment
  • 8.2 Escape system
  • 8.2.1 Survival craft
  • 8.2.2 Rescue boats
  • 8.2.3 Life buoy
  • 8.2.4 Lifejackets
  • 8.2.5 Immersion thermal clothing
  • 8.2.6 Distress flare
  • 8.2.7 Throwing equipment
  • 8.2.8 Radio life-saving appliances
  • 8.2.9 Deck escape route
  • 8.2.10 Escape routes from accommodation and service spaces
  • 8.2.11 Means of escape from machinery spaces
  • 8.3 Mast signaling equipment
  • 8.3.1 Lights and shapes
  • 8.3.2 Acoustic signal
  • 8.3.3 Others
  • 8.4 Deck cranes
  • 8.5 Helideck
  • 8.6 Safe access and permanent inspection access
  • 9 Interior outfitting
  • 9.1 Cabin arrangement
  • 9.1.1 General
  • 9.1.2 Living compartments
  • 9.1.3 Kitchen and Dining Room
  • 9.1.4 Other premises
  • 9.2 Internal stairs, passages and entrances and exits
  • 9.2.1 Internal stairs
  • 9.2.2 Passages and entrances and exits
  • 9.3 Doors and windows
  • 9.3.1 Gate
  • 9.3.2 Windows
  • 10 turbines
  • 10.1 General
  • 10.2 Cargo system
  • 10.2.1 Cargo tanks
  • 10.2.2 Cargo pump
  • 10.3 Common system
  • 10.3.1 Inert gas system
  • 10.3.2 Instrument air and utility air systems
  • 10.3.3 Diesel and lubricating oil systems
  • 10.4 Water supply and drainage system
  • 10.4.1 Fresh water system
  • 10.4.2 Seawater systems
  • 10.4.3 Deck drainage system
  • 10.4.4 Anti-sea organisms devices and systems
  • 10.4.5 Domestic sewage treatment system
  • 10.5 Dedicated ballast system
  • 10.6 Valve remote control and liquid level monitoring system
  • 10.7 Fire protection system
  • 10.7.1 Water fire extinguishing system
  • 10.7.2 Deck fixed foam fire extinguishing system
  • 10.7.3 Helideck fixed foam fire extinguishing system
  • 10.7.4 Fixed gas fire extinguishing system
  • 10.7.5 Portable fire extinguishers
  • 10.7.6 Firefighter's outfit
  • 10.8 Piping design
  • 11 Electrical
  • 11.1 General
  • 11.2 Main power supply
  • 11.3 Emergency power supply
  • 11.4 Distribution system
  • 11.5 Lighting system
  • 11.6 Electric heat tracing system
  • 11.7 Arrangement and installation of electrical equipment
  • 11.8 Equipment and cables in hazardous areas
  • 11.9 Grounding, lightning protection and anti-interference measures
  • 12 instrument control
  • 12.1 General
  • 12.2 Control system setup
  • 12.3 Emergency shutdown system (ESD)
  • 12.4 Fire and gas detection system (FGS)
  • 12.5 Other supporting monitoring systems of the hull
  • 12.6 Instrumentation, cables and power supply
  • 13 Communication
  • 13.1 General
  • 13.2 Communication equipment configuration
  • 13.2.1 External communication system
  • 13.2.2 Internal communication system
  • 13.3 Radio Room, Power Supply and Antenna Layout Requirements
  • 14 HVAC25
  • 14.1 General
  • 14.2 Air conditioning and heating equipment
  • 14.3 Ventilation
  • 14.4 Refrigeration system
  • 15 Anticorrosion
  • 15.1 General
  • 15.2 Anti-corrosion coating
  • 15.3 Cathodic protection
  • 16 Upper module
  • 16.1 General
  • 16.2 Process system
  • 16.3 Common systems
  • 16.4 Module arrangement
  • 16.5 Fire fighting and rescue and escape system
  • 16.6 Machinery
  • 16.7 Electrical
  • 16.8 Instrument Control
  • 16.9 Communication
  • 16.10 Piping
  • 16.11 Module weight
  • 16.12 Module structure
  • 16.13 Corrosion protection
  • Reference

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules for Standardization Documents" to be drafted.

1 Scope

This document specifies the general design requirements for floating production storage units (FPSO).

2 Normative references

The contents of the following documents constitute the essential provisions of this document through normative references in the text. Among them, dated references For documents, only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document.

GB/T 4208 enclosure protection level (IP code)

Guidelines for Towing at Sea China Classification Society Floating Production Storage Unit (FPSO) Safety Rules State Administration of Work Safety International Life-saving Appliance Code (InternationalLife-savingApplianceCode, LSA) International Maritime Organization Ships, MARPOL) International Maritime Organization organization atsea,1972) International Maritime Organization

3 Terms and Definitions

The following terms and definitions apply to this document.

3.1 floating production storage offloading unit

Offshore installations floating on the water surface and moored at sea for a long time for oil and gas processing, storage and loading and unloading.

Note: referred to as "floating device".

3.2 General arrangement

Comprehensive and overall planning for the cabins, topside modules, living areas, passageways and various major equipment, facilities, systems, etc. of the floating unit planning and layout.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 33 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 42034-2022

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
33 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 42034-2022

$455.00