GB/T 41831-2022Requirements for the competence evaluation of project management professionals (English PDF)
项目管理专业人员能力评价要求
This is a limited preview
Buy now to download the full PDF (27 pages)
Need quotation for your management?
Get a formal quotation for GB/T 41831-2022 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
October 12, 2022
Implementation date
October 12, 2022
Scope
GB/T 41831-2022 is the English-translated version of 项目管理专业人员能力评价要求.
GB/T 41831-2022 specifies the requirements for the competence evaluation of project management professionals: the terms and definitions, the dimensions of evaluation, the five competence levels with the core competence requirements of each, the evaluation methods, and the use of the evaluation results.
It applies to the graded evaluation of personnel engaged in project management work by enterprises, public institutions, government bodies, social organisations and industries, and may serve local authorities as a basis for recruiting, developing, appointing and awarding professional titles to project management staff.
Competence is assessed on three dimensions - knowledge, competence and personal qualities, and experience - and graded from level 1 (project management assistant) through junior, intermediate and senior professional to level 5 (expert).
A normative annex classifies the project management knowledge areas and their content, and an informative annex defines the competence and quality indicators; key terms (project, project management, program, portfolio) are taken from GB/T 23691-2009.
It is a first edition, issued on 12 October 2022 and in force from the same date. Classification: ICS 03.100.40, CCS A01. The document runs to 27 pages, delivered complete in English translation.
Found what you need?
Document preview — GB/T 41831-2022
National Standard of the People's Republic of China
- ICS
- 03.100.40
- Classification
- A01
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- ForewordIII
- IntroductionIV
- 1 Scope1
- 2 Normative references1
- 3 Terms and definitions1
- 4 Dimensions of competence evaluation for project management professionals2
- 4.1 General2
- 4.2 Knowledge requirements2
- 4.3 Competence and quality requirements2
- 4.4 Experience requirements2
- 5 Competence levels and core competence requirements for project management professionals2
- 5.1 General2
- 5.2 Level 1: Project management assistant3
- 5.3 Level 2: Junior project management professional4
- 5.4 Level 3: Intermediate project management professional5
- 5.5 Level 4: Senior project management professional6
- 5.6 Level 5: Expert project management professional7
- 6 Competence evaluation of project management professionals8
- 6.1 General8
- 6.2 Methods of competence evaluation9
- 6.3 Results of competence evaluation and their application10
- Annex A (normative) Classification and content of project management knowledge areas11
- Annex B (informative) Classification and definitions of competence and quality indicators for project management professionals13
- Bibliography21
Foreword
This document is drafted in accordance with GB/T 1.1-2020, Directives for standardization - Part 1: Rules for the structure and drafting of standardizing documents.
Attention is drawn to the possibility that some elements of this document may be the subject of patent rights. The issuing body of this document assumes no responsibility for identifying such patent rights.
This document was proposed by and is under the jurisdiction of the National Technical Committee on Project Management of Standardization Administration of China (SAC/TC 343).
Drafting organisations of this document: Xinjiang Goldwind Science and Technology Co., Ltd., Weibozhili (Beijing) Management Consulting Co., Ltd., China International Talent Exchange Foundation, Huawei Technologies Co., Ltd., Xiamen Biaopu Standardization Service Co., Ltd., ZTE Corporation, China Quality Certification Centre, Taiji Computer Co., Ltd., Beijing Century TAL Education Technology Co., Ltd., China Association for Standardization, China Standard Technology Group Co., Ltd., Development and Reform Bureau of Licang District of Qingdao, Hangzhou Institute of Quality and Technical Supervision and Testing, Beijing Low-Carbon Clean Energy Research Institute, National Center of Ocean Standards and Metrology, Beijing Institute of Remote Sensing Equipment, SGS-CSTC Standards Technical Services Co., Ltd., Chongqing Changan Automobile Co., Ltd., Shanghai Nuclear Engineering Research and Design Institute Co., Ltd., Qian'an Dianzan Enterprise Management Consulting Service Co., Ltd., Changyuan Shenrui Relay Protection Automation Co., Ltd., Guangdong Zhitong Talent Chain Co., Ltd., Hangzhou Saiyang Standard Information Consulting Co., Ltd., Fancheng Design Co., Ltd., Zhejiang Association for Product and Engineering Standardization, and Qingdao Rongyuan Culture and Tourism Group Co., Ltd.
Principal drafters of this document: Xiao Yang, Wu Feng, Wan Jinfa, Tang Yirong, Sun Hu, Kou Xin, Chen Zhiyong, Zhang Baozhong, Zhang Wei, Wu Xiangke, Yu Biao, Jia Baoshan, Hu Baisong, Jin Hong, Chen Lun, Wang Jun, Xue Mei, Wang Linfeng, Shen Xiaobin, Yang Jun, Zhang Zhixiao, Jin Aidie, Ying Lei, Shi Jun, Song Sitao, Wang Zhongyu, Liu Zhen, Sun Jian, Tong Jun, Zheng Hong, Ye Shenglin, Zhang Yange, Zhou Jin, Wang Ping, Wang Huijuan, Shi Qing, Wang Guimei, Huang Yueming, Lai Xinli, Li Xuemei, Chen Guomin, Zhuang Yuan, Zhang Shoulong, Xu Jianxi, Ning Pengwei, Hou Lin, Su Lin, Deng Mingting, Li Wenwen.
Introduction
Project management is the vehicle and organisational form for work that is cross-functional and innovative in nature, such as implementing strategy, organisational transformation, technical research, product development, process optimisation, building standardization systems, engineering delivery, market development and digital transformation in all kinds of organisations. Government departments at all levels, industry associations, enterprises and public institutions, universities and other organisations attach ever greater importance to establishing project management mechanisms and to developing project management talent.
Project managers are key figures who lead, organise, coordinate and support project teams in achieving specific project objectives, and they have their own distinctive competence requirements. This document mainly describes the dimensions of competence evaluation, the level framework and the evaluation methods for project management professionals. It can meet the needs of all kinds of organisations for selecting, developing, appointing and evaluating project management talent, and it indicates a path of growth for all project management practitioners.
Following the requirements for the competence evaluation of project management professionals established in this document helps:
- to clarify the dimensions on which project management professionals are evaluated;
- to clarify the competence and quality requirements for project management professionals at different levels;
- to clarify the methods of competence evaluation for project management professionals;
- project management professionals to identify the direction and path for improving their own competence and for their career development;
- organisations to define on a sound basis the criteria for selecting, developing and evaluating project management talent.
1 Scope
This document specifies the terms and definitions for the competence evaluation of project management professionals, the dimensions of competence evaluation, the five levels into which competence is divided, the core competence requirements for each level, the methods of competence evaluation, and the results of competence evaluation and their application.
This document applies to the graded evaluation of project management competence of personnel engaged in project management work, carried out by all kinds of organisations such as enterprises, public institutions, government bodies and social organisations (hereinafter referred to as organisations) and by all industries. It may also be used as a basis by provinces, cities, districts and counties for the introduction, development, professional title assessment and appointment of project management professionals.
2 Normative references
There are no normative references in this document.
3 Terms and definitions
For the purposes of this document, the following terms and definitions apply.
3.1 Project
Time-bound effort undertaken to create a unique product or provide a unique service.
[Source: GB/T 23691-2009, 2.1.1]
3.2 Project management
Coordinated activities of planning, organising, implementing, monitoring and controlling carried out to achieve the established objectives of a project.
[Source: GB/T 23691-2009, 2.1.4]
3.3 Program
Group of related projects that require coordinated management to achieve a common objective.
[Source: GB/T 23691-2009, 2.1.3]
3.4 Portfolio
Projects (3.1), programs (3.3) and other work grouped together to facilitate effective management in order to achieve strategic objectives. The projects (3.1), programs (3.3) and other work in a portfolio are not necessarily interdependent or directly related.
[Source: GB/T 23691-2009, 2.1.15]
3.5 Professionals
Persons in an organisation who work full-time or part-time in a particular professional field, or for whom that professional field is an important part of their work.
Note: includes persons who provide consulting, training and other supporting and service work for that professional field.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 27 pages — is available in the English PDF.
Referenced standards
How to Download GB/T 41831-2022
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
Secure payment via Stripe
Payments accepted
GB/T 41831-2022
$335.00