GB/T 41135.2-2021Current and voltage sensors or detectors, to be used for fault passage indication purposes - Part 2: System aspects (English PDF)
故障路径指示用电流和电压传感器或探测器 第2部分:系统应用
This is a limited preview
Buy now to download the full PDF (77 pages)
Need quotation for your management?
Get a formal quotation for GB/T 41135.2-2021 in 30 minutes.
Issued by
State Administration for Market Regulation, China National Standardization Administration
Level / Type
National · Recommended
Issue date
December 31, 2021
Implementation date
July 1, 2022
Scope
GB/T 41135.2-2021 is the English-translated version of 故障路径指示用电流和电压传感器或探测器 第2部分:系统应用.
GB/T 41135.2-2021 is the Chinese standard "Current and voltage sensors or detectors, to be used for fault passage indication purposes - Part 2: System aspects".
Its scope clause reads: This document describes electrical phenomena and power system responses during faults according to the most widely used distribution system architectures and fault topologies, This defines the functionality of the Fault Path Indicator (FPI) and the Power Distribution Unit (DSU) (including current and/or voltage sensors for the FPI, DSU) sexual requirements: FPI and DSU are a single device or a combination of multiple devices/functions that can be used to detect faults and indicate the location of the fault: This document is intended to guide the user according to the adopted scheme and operating rules (which are customary, and/or depend on national statutes to provide Constraints on electrical continuity and power quality), selecting the appropriate FPI/DSU and proper operating scheme: Note 1: Fault location refers to the location relative to the FPI/DSU installation point in the grid (upstream or downstream of the FPI/DSU location) or the fault current through the FPI/DSU Orientation of DSU: Considering the characteristics and operating conditions of the power system with the FPI/DSU installed, the fault location can be: --- Derived directly from the FPI/DSU, or; ---From a centralized system that uses more FPI or DSU information: Note 2: This document mainly focuses on the system response during the fault, which is classified by the FPI/DSU fault detection capability level described in GB/T 41135:1 "Core basis", all the requirements in GB/T 41135:1 are specified in detail:. Its clauses include terms and definitions.
Found what you need?
Document preview — GB/T 41135.2-2021
National Standard of the People's Republic of China
- Classification
- K 41
Issued by: State Administration for Market Regulation, China National Standardization Administration
Contents
- Preface
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 FPI/DSU selection requirements for fault detection based on grid operation mode and fault type
- 5 Principles of fault detection based on grid and fault type
- Appendix A (Informative) Example of Fault Detection for FPI or DSU in Ring Network
1 Scope
This document describes electrical phenomena and power system responses during faults according to the most widely used distribution system architectures and fault topologies,
This defines the functionality of the Fault Path Indicator (FPI) and the Power Distribution Unit (DSU) (including current and/or voltage sensors for the FPI, DSU) sexual requirements: FPI and DSU are a single device or a combination of multiple devices/functions that can be used to detect faults and indicate the location of the fault:
This document is intended to guide the user according to the adopted scheme and operating rules (which are customary, and/or depend on national statutes to provide
Constraints on electrical continuity and power quality), selecting the appropriate
FPI/DSU and proper operating scheme:
Note 1: Fault location refers to the location relative to the FPI/DSU installation point in the grid (upstream or downstream of the FPI/DSU location) or the fault current through the FPI/DSU Orientation of DSU: Considering the characteristics and operating conditions of the power system with the FPI/DSU installed, the fault location can be:
--- Derived directly from the FPI/DSU, or;
---From a centralized system that uses more FPI or DSU information:
Note 2: This document mainly focuses on the system response during the fault, which is classified by the FPI/DSU fault detection capability level described in GB/T 41135:1
"Core basis", all the requirements in GB/T 41135:1 are specified in detail:
2 Normative references
The contents of the following documents constitute essential provisions of this document through normative references in the text: Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document:
GB/T 41135:1 Current and voltage sensors or detectors for fault path indication - Part 1: General principles and requirements (GB/T 41135:1-2021,IEC 62689-1:2016,MOD)
3 Terms and Definitions
The terms and definitions defined in GB/T 41135:1 and the following apply to this document:
3:1 Terms and Definitions Related to Neutral Grounding
3:1:1 arc-suppression coil
It is connected between the neutral point and the ground of the power system to compensate for the phase-to-ground capacitive current in the case of a single-phase ground fault (resonance-ground system):
Reactor:
NOTE: In order to make ground fault detection and/or fault removal easier, a pure reactor with a high quality factor Q is usually used instead of a resistive-reactive impedance:
[Source: GB/T 2900:95-2015, 3:4:10]
3:2 Abbreviations and symbols
Abbreviations and symbols defined in GB/T 41135:1 apply to this document:
GB/T 19212.5 | GB/T 10228 | GB/T 8286 | GB/T 19212.14 | GB/T 10230.2 | GB/T 41135.1 | […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 77 pages — is available in the English PDF.
Referenced standards
Normative references
GB/T 41135 · IEC 62689
How to Download GB/T 41135.2-2021
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 41135.1-2021 — Current and voltage sensors or detectors, to be used for fault passage indication purposes - Part 1: General principles and requirements
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 41135.2-2021
$575.00