GB/T 41029-2021Specification for offshore well abandonment operation of oil&gas drilling (English PDF)
石油天然气钻井海洋弃井作业规程
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 41029-2021 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
December 31, 2021
Implementation date
July 1, 2022
Scope
GB/T 41029-2021 is the English-translated version of 石油天然气钻井海洋弃井作业规程.
GB/T 41029-2021 lays down the operating rules for abandoning offshore oil and gas wells.
It defines terms such as submarine wellhead remnants and special wells, including high gas-oil ratio wells, wells with corrosive H2S or CO2 and wells with high formation pore pressure, and it sets general requirements for wellbore integrity assessment, isolation barriers and cement plugs, including minimum plug lengths and the depth at which casings and piles are cut below the seabed.
It then gives the procedures for temporary and permanent abandonment and the rules for the abandonment plan and the abandonment report. It applies to exploration and development in Chinese internal waters, territorial sea, contiguous zone, exclusive economic zone and continental shelf, and can serve as a reference overseas. It was issued on 31 December 2021 and has applied since 1 July 2022.
Found what you need?
Document preview — GB/T 41029-2021
National Standard of the People's Republic of China
- ICS
- 75.020
- Classification
- E 13
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 General requirements, principles and procedures for well abandonment operations
- 4.1 General Requirements
- 4.2 Operation procedure for temporary well abandonment
- 4.3 Operation Procedures for Permanent Well Abandonment
- 4.4 Other well abandonment principles and requirements
- 5 Well Abandonment Information and Reports
- 5.1 Preparation of well abandonment plan
- 5.2 Compilation and storage of abandonment report
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1. Structure and Drafting Rules of Standardization Documents" drafted.
1 Scope
This document specifies the requirements for well abandonment operation procedures and data management in offshore oil and gas exploration and development operations.
This document applies to the internal waters, territorial sea, contiguous zone, exclusive economic zone, continental shelf of the People's Republic of China, and the People's Republic of China Oil and gas exploration and development operations in other sea areas under its jurisdiction. Operation in overseas waters can also be used for reference.
2 Normative references
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document.
GB/T 19139 Test method for oil well cement
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1 Submarine wellhead remnants
After the well abandonment operation, the objects left on the bottom of the seabed (the bottom of the water body in the case of internal water) and above the mud surface near the wellhead.
3.2 Special well
Oil and gas wells that meet one or more of the following conditions, depending on their final state before they are abandoned.
a) Gas wells and oil wells with a gas-oil ratio exceeding 350 (m3/m3) under standard conditions;
b) Wells that contain corrosive fluids such as H2S and CO2 in the formation and are prone to corrosion after abandonment;
c) Wells with maximum formation pore pressure equivalent density higher than 1.30g/cm³.
4 General requirements, principles and procedures for well abandonment operations
4.1 General Requirements
4.1.1 Before the well abandonment operation, the integrity of the wellbore should be assessed, and remedial measures should be taken if the integrity requirements are not met.
4.1.2 After the well abandonment operation, the oil and gas layers and other permeable formations should be effectively isolated, so that the formation fluids between different pressure layers cannot interact with each other.
For channeling, there should be at least two barriers to ensure that the formation fluid does not leak into the channel of the seabed mud surface.
4.1.3 Casings and annuluses that do not achieve effective cement isolation shall not be used as isolation barriers for permanent well abandonment.
4.1.4 The first cement plug in the perforation section, in the casing above the open hole or above the liner hanger shall be probed to the top of the cement plug and the pressure test shall be qualified.
4.1.5 The length of the last sealing cement plug for permanent well abandonment shall not be less than 50m, and the top surface of the cement plug is located 4m~30m below the seabed mud surface.
4.1.6 When the well is permanently abandoned, when the flow channel between the oil, gas and water permeable layers is blocked with cement plugs, the length of a single cement plug shall not be less than 50m;
The vertical height of the cement plug above the top of the oil, gas and water permeable layer in inclined wells and horizontal wells shall not be less than 30m.
4.1.7 When the well is permanently abandoned in the waters within the territorial sea, the cutting position of all casings, piles, etc. shall be 4m deeper than the seabed mud surface.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
Similar standards
How to Download GB/T 41029-2021
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 19139-2003 — Procedure for testing well cements
GB/T 19139-2012 — Testing of well cements
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
Secure payment via Stripe
Payments accepted
GB/T 41029-2021
$150.00