Valid

GB/T 39903-2021Work breakdown structures for project and programme management (English PDF)

Also coversGBT39903-2021

Open the GB/T 39903-2021 preview as PDF

Preview — first pages of GB/T 39903-2021

This is a limited preview

Buy now to download the full PDF

Issued by

State Administration for Market Regulation, China National Standardization Administration

Level / Type

National · Recommended

Issue date

March 9, 2021

Implementation date

October 1, 2021

Scope

GB/T 39903-2021 (Work breakdown structures for project and programme management) is available as an English-translated PDF.

GB/T 39903-2021 — This document provides guidance for organizations engaged in project or program management to carry out work breakdown structure related activities. This document is applicable to all types of public or private organizations, organizations or units of different sizes, and projects of varying complexity, scale, and duration. Or project group. This document provides terms and definitions, concepts, features, benefits, uses, integrated applications, and related relationships related to the work breakdown structure. Description of the content. This document does not give guidelines for the preparation and application of work breakdown structure practices related to work processes, methods or tools. For examples of the work breakdown structure and its relationship with other breakdown structures, see Appendix A and Appendix B, respectively.

Document preview — GB/T 39903-2021

National Standard of the People's Republic of China

Classification
A 02

Issued by: State Administration for Market Regulation, China National Standardization Administration

Contents

  • 1 Scope1
  • 2 Normative references1
  • 3 Terms and definitions1
  • 4 Work breakdown structure concept2
  • 4.1 Overview2
  • 4.2 Objective2
  • 4.3 Application Scenario3
  • 4.4 Hierarchical decomposition3
  • 4.5 Mother-child relationship3
  • 4.6 Progressive details4
  • 5 Features, organization and relationship with other structures of work breakdown structure4
  • 5.1 Features of Work Breakdown Structure4
  • 5.2 Compilation4
  • 5.3 Work Breakdown Structure Association Relationship6
  • 5.4 Management and control of work breakdown structure7
  • 5.5 Application and benefits of work breakdown structure7
  • Appendix A (informative) Work Breakdown Structure---Example9
  • Appendix B (informative) Relevance to other breakdown structures---Example15
  • Appendix C (informative) Optional hierarchical work breakdown structure18

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents"

Drafting.

The translation method used in this document is equivalent to ISO 21511.2018 "Work Breakdown Structure for Project and Program Management".

This document has made the following minimal editorial changes. In order to coordinate with the existing standards, the standard name is changed to ``Project Work Breakdown Results''

Construction".

This document was proposed and managed by the National Project Management Standardization Technical Committee (SAC/TC343).

1 Scope

This document provides guidance for organizations engaged in project or program management to carry out work breakdown structure related activities.

This document is applicable to all types of public or private organizations, organizations or units of different sizes, and projects of varying complexity, scale, and duration.

Or project group.

This document provides terms and definitions, concepts, features, benefits, uses, integrated applications, and related relationships related to the work breakdown structure.

Description of the content. This document does not give guidelines for the preparation and application of work breakdown structure practices related to work processes, methods or tools.

For examples of the work breakdown structure and its relationship with other breakdown structures, see Appendix A and Appendix B, respectively.

2 Normative references

There are no normative references in this document.

3 Terms and definitions

The following terms and definitions apply to this document.

3.1

100% rule

The work breakdown structure should cover all the work required to complete the scope of the project or program.

Note. The one-hundred-percent principle applies to both the parent unit and the sub-unit of the work breakdown structure. 100% of the work breakdown of the sub-unit layer corresponds to all of the parent unit layer

the work.

3.2

Functional breakdown structure

Decomposition of the functions required to complete the project or program work unit.

3.3

Hierarchical decomposition

The process of dividing the scope of a project or program into smaller work breakdown structural units.

3.4

Managementinformationsystem

Hardware and software used to support information compilation, project or program indicator analysis and reporting.

3.5

Organizational breakdown structure

The decomposition of the management team in the organization, or the decomposition of the management team that performs project or program work.

Note. The organizational breakdown structure can include partners or subcontractors. It is used to describe the project, the work of the program and the organizational unit that manages or performs these activities

Relationship between.

3.6

Parent element

The work is broken down into two or more sub-level work units.

Note. The sub-level work units are called subunits.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

How to Buy GB/T 39903-2021

  1. 1Add to cart. Click the "Buy GB/T 39903-2021" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 39903-2021

$305.00

$260.00for partners