Valid

GB/T 39888-2021Earned value management in project and programme management (English PDF)

项目和项目群管理中的挣值管理

Preview PDF

This is a limited preview

Buy now to download the full PDF (44 pages)

Need quotation for your management?

Get a formal quotation for GB/T 39888-2021 in 30 minutes.

Issued by

State Administration for Market Regulation, China National Standardization Administration

Level / Type

National · Recommended

Issue date

March 9, 2021

Implementation date

October 1, 2021

Scope

GB/T 39888-2021 is the English-translated version of 项目和项目群管理中的挣值管理.

GB/T 39888-2021 — This document aims to provide guidance on earned value management practices in project and program management. This document is applicable to organizations and departments of any form or size, including public organizations or private organizations, as well as various complex processes.

The degree, scale, duration of the project or program group.

This document is divided into the following sections. a) Terms and definitions; b) The purpose and benefits of earned value management; c) Integration and relationship with project or program management; d) Process and process description overview; e) Basic requirements of earned value management system; f) Use of earned value management system.

This document does not provide guidance on the use of specific processes, methods or tools in the practice of earned value management.

Cost, schedule and performance analysis, commonly used formulas and related explanations, and the integration of earned value with other project or program management processes and other parameters See Appendix A, Appendix B, and Appendix C.

Found what you need?

Document preview — GB/T 39888-2021

National Standard of the People's Republic of China

Classification
A 02

Issued by: State Administration for Market Regulation, China National Standardization Administration

Contents

  • 1 Scope1
  • 2 Normative references1
  • 3 Terms, definitions and abbreviations1
  • 3.1 Terms and definitions1
  • 3.2 Abbreviations3
  • 4 Overview of Earned Value Management3
  • 4.1 Earned Value Management3
  • 4.2 The purpose and benefits of earned value management3
  • 4.3 Earned Value Management System Guidelines4
  • 4.4 Earned Value Management Planning4
  • 4.5 Use of Earned Value Measures and Performance Indicators4
  • 5 Earned Value Management Process5
  • 5.1 Overview5
  • 5.2 Step 1.Break down the scope of the project or programme6
  • 5.3 Step 2.Assign responsibilities6
  • 5.4 Step 3.Establish work schedule6
  • 5.5 Step 4.Develop a phased budget7
  • 5.6 Step 5.Assign target performance indicators7
  • 5.7 Step 6.Set a baseline for performance measurement8
  • 5.8 Step 7.Authorize and perform work8
  • 5.9 Step 8.Accumulate and report performance data9
  • 5.10 Step 9.Analyze performance data9
  • 5.11 Step 10.Take management measures10
  • 5.12 Step 11.Maintain the baseline10
  • 6 Review of Earned Value Management System11
  • 6.1 Overview11
  • 6.2 Comprehensive baseline review11
  • 6.3 Demonstration review11
  • 6.4 Monitoring12
  • Appendix A (informative) Cost and schedule performance measurement analysis using earned value management information13
  • A.1 Overview13
  • A.2 Performance Metrics and Predictive Indicators13
  • A.3 Cost performance measurement14
  • A.4 Schedule performance measurement14
  • A.5 Additional benefits of performance measurement analysis15
  • Appendix B (informative) Progress analysis using earned value management information (earned progress)16
  • B.1 Earning progress16
  • B.2 Prerequisites for Earning Progress16
  • B.3 Instructions for the use of earned progress performance metrics17
  • B.4 Terms and formulas for earning progress17
  • B.5 The purpose and benefits of earning progress18
  • Appendix C (informative) Integration of earned value management with other project or program management processes19

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents"

Drafting.

The translation method used in this document is equivalent to ISO 21508.2018 "Earned Value Management in Project and Program Management".

This document was proposed and managed by the National Project Management Standardization Technical Committee (SAC/TC343).

1 Scope

This document aims to provide guidance on earned value management practices in project and program management.

This document is applicable to organizations and departments of any form or size, including public organizations or private organizations, as well as various complex processes.

The degree, scale, duration of the project or program group.

This document is divided into the following sections.

a) Terms and definitions;

b) The purpose and benefits of earned value management;

c) Integration and relationship with project or program management;

d) Process and process description overview;

e) Basic requirements of earned value management system;

f) Use of earned value management system.

This document does not provide guidance on the use of specific processes, methods or tools in the practice of earned value management.

Cost, schedule and performance analysis, commonly used formulas and related explanations, and the integration of earned value with other project or program management processes and other parameters

See Appendix A, Appendix B, and Appendix C.

2 Normative references

There are no normative references in this document.

3 Terms, definitions and abbreviations

3.1 Terms and definitions

The following terms and definitions apply to this document.

3.1.1

Activity

The work that needs to be carried out in order to complete the project or program.

Note. It can also be considered as a working element.

3.1.2

Actualcost

The cost incurred by the completed work.

Note. Actual cost is also called "actual cost of work done".

3.1.3

Budget at completion

The total projected cost of completing work related to work packages (3.1.19), activities (3.1.1), or control accounts (3.1.4).

3.1.4

Control account

Management control points, used to integrate the scope, budget, and actual cost (3.1.2) of the project or programme, work package (3.1.19) or activity (3.1.1)

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 44 pages — is available in the English PDF.

How to Download GB/T 39888-2021

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
44 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 39888-2021

$360.00