Valid

GB/T 39698-2020Confirmation methods for delivering common Portland cement (English PDF)

通用硅酸盐水泥出厂确认方法

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 39698-2020 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

December 14, 2020

Implementation date

November 1, 2021

Scope

GB/T 39698-2020 is the English-translated version of 通用硅酸盐水泥出厂确认方法.

GB/T 39698-2020 is the Chinese standard "Confirmation methods for delivering common Portland cement".

Its scope clause reads: This standard specifies the basic requirements for general portland cement factory confirmation methods, process quality control requirements, factory cement quality confirmation, Treatment of abnormal cement quality and emergency plan: This standard is applicable to the confirmation of the quality conformity of general Portland cement before leaving the factory:. Its clauses include terms and definitions.

Found what you need?

Document preview — GB/T 39698-2020

National Standard of the People's Republic of China

ICS
91.100.10
Classification
Q 11

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references

1 Scope

This standard specifies the basic requirements for general portland cement factory confirmation methods, process quality control requirements, factory cement quality confirmation,

Treatment of abnormal cement quality and emergency plan:

This standard is applicable to the confirmation of the quality conformity of general Portland cement before leaving the factory:

2 Normative references

The following documents are indispensable for the application of this document: For dated reference documents, only the dated version applies to this article

Pieces: For undated references, the latest version (including all amendments) applies to this document:

GB 175 General Portland Cement

GB/T 4131 Cement naming principles and terms

GB 6566 Radionuclide limits for building materials

GB/T 19001 Quality Management System Requirements

GB/T 30760 Technical specification for co-processing of solid waste in cement kilns

GB 31893 The limit and determination method of water-soluble chromium (VI) in cement

JC/T 738 Cement strength rapid inspection method

3 Terms and definitions

The following terms and definitions defined in GB/T 4131 and GB/T 19001 apply to this document:

3:1

Factory cement quality confirmation qualityconfirmationfordeliveringcommonPortlandcement

Through the quality monitoring of the whole process of cement production, the quality of the factory cement is predicted based on relevant information, and it is clear that it meets the requirements of the standard:

behavior:

3:2

Quality guarantee coefficient qualityguaranteecoefficient

Quantitatively characterize the safety degree of the factory cement meeting the requirements:

Note: This coefficient is used to judge the effectiveness of the quality management system: For a set of data that obeys or approximately obeys a normal distribution, the quality assurance coefficient can be combined with

Frame rate correspondence:

3:3

Coefficientofvariation

Cv

The ratio of the standard deviation of the data to its mean:

Note: It reflects the absolute value of data dispersion:

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Similar standards

How to Download GB/T 39698-2020

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 39698-2020

$105.00