Valid

GB/T 38899-2020Implementation guidance for energy management system in chemical industry (English PDF)

化工行业能源管理体系实施指南

Preview PDF

This is a limited preview

Buy now to download the full PDF (21 pages)

Need quotation for your management?

Get a formal quotation for GB/T 38899-2020 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

June 2, 2020

Implementation date

January 1, 2021

Scope

GB/T 38899-2020 is the English-translated version of 化工行业能源管理体系实施指南.

GB/T 38899-2020 is the Chinese standard "Implementation guidance for energy management system in chemical industry". Its scope clause reads: This standard provides systematic guidance for chemical companies to establish, implement, maintain, and improve energy management systems.

This standard applies to chemical companies covered by the chemical industry (hereinafter referred to as "industry", excluding petroleum refining, ethylene and new coal chemical industry) (Hereinafter referred to as "enterprise"). Its clauses include terms and definitions; energy management system.

Found what you need?

Document preview — GB/T 38899-2020

National Standard of the People's Republic of China

ICS
27.010
Classification
F 01

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • Introduction IV
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Energy Management System
  • 4.1 General
  • 4.2 Management responsibilities
  • 4.2.1 Top management
  • 4.2.2 Management representative
  • 4.3 Energy Policy
  • 4.4 Planning
  • 4.4.1 General
  • 4.4.2 Laws, regulations and other requirements
  • 4.4.3 Energy review
  • 4.4.4 Energy benchmark
  • 4.4.5 Energy performance parameters
  • 4.4.6 Energy targets, energy indicators and energy management implementation plan
  • 4.5 Implementation and operation
  • 4.5.1 General
  • 4.5.2 Competence, training and awareness
  • 4.5.3 Information exchange
  • 4.5.4 File
  • 4.5.5 Operation control
  • 4.5.6 Design
  • 4.5.7 Procurement of energy services, products, equipment and energy
  • 4.6 Check
  • 4.6.1 Monitoring, measurement and analysis
  • 4.6.2 Evaluation of compliance
  • 4.6.3 Internal audit of the energy management system
  • 4.6.4 Non-conformance, correction, corrective actions and preventive measures
  • 4.6.5 Record Control
  • 4.7 Management review
  • References

1 Scope

This standard provides systematic guidance for chemical companies to establish, implement, maintain, and improve energy management systems.

This standard applies to chemical companies covered by the chemical industry (hereinafter referred to as "industry", excluding petroleum refining, ethylene and new coal chemical industry) (Hereinafter referred to as "enterprise").

2 Normative references

The following documents are essential for quoting this document. For dated reference documents, only the dated version applies to this article

Pieces. For the cited documents without date, the latest version (including all amendments) applies to this document.

GB 17167 General rules for the allocation and management of energy measuring instruments of energy-using units

GB/T 21367 Equipment and management requirements for energy measuring instruments in chemical enterprises

GB/T 23331-2012 Energy management system requirements

GB/T 29456-2012 Energy Management System Implementation Guide

GB/T 36713 Energy management system energy benchmark and energy performance parameters

3 Terms and definitions

The terms and definitions defined in GB/T 23331-2012 and GB/T 36713 apply to this document.

4 Energy management system

4.1 General

The establishment, implementation, maintenance and improvement of the energy management system of an enterprise shall include the following.

a) Define the management scope and boundary of the energy management system according to the organization structure, location and geographical scope of the enterprise, and determine the energy use,

The basic accounting unit of energy consumption (such as branches, production units, main energy-consuming equipment, etc.), and make it clear in the form of documents; energy

The management scope and boundary of the management system should cover the main production system and auxiliary production system of the production area of the company's main products

The whole process of energy utilization of the subsidiary production system, including energy purchase, storage, processing conversion, transmission and distribution and final use (including (Recycling of waste heat and pressure) various links;

b) The production process, equipment and production scale should meet the national industrial policy, industry access conditions and national, industrial and local laws and regulations

Regulatory requirements;

c) Establish the necessary management documents in accordance with the characteristics of the enterprise, and ensure that the documents are effectively implemented during the operation of the energy management system

Implement and continuously improve;

d) Plan feasible methods, determine appropriate management methods to meet the requirements of GB/T 23331-2012, and continuously improve the performance

Source performance and energy management system.

4.2 Management responsibilities

4.2.1 Top management

As the highest decision-maker or decision-making layer that commands and controls the enterprise, the top management establishes, implements, maintains and improves energy management in the enterprise […]

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 21 pages — is available in the English PDF.

Similar standards

How to Download GB/T 38899-2020

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
21 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 38899-2020

$375.00