Valid

GB/T 38218-2019Implementation guidance of energy management systems for fossil fired power generation enterprises (English PDF)

火力发电企业能源管理体系实施指南

Preview PDF

This is a limited preview

Buy now to download the full PDF (34 pages)

Need quotation for your management?

Get a formal quotation for GB/T 38218-2019 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

October 18, 2019

Implementation date

May 1, 2020

Scope

GB/T 38218-2019 is the English-translated version of 火力发电企业能源管理体系实施指南.

GB/T 38218-2019 is the Chinese standard "Implementation guidance of energy management systems for fossil fired power generation enterprises".

Its scope clause reads: This standard proposes systematic guidance for the establishment, implementation, maintenance and improvement of energy management systems for coal-fired and gas-fired power generation enterprises.

This standard applies to coal-fired and gas-fired power generation enterprises, including power generation enterprises that include cogeneration. Coal-fired, gas-owned power plants can refer to this Standard implementation. Its clauses include terms and definitions.

Found what you need?

Document preview — GB/T 38218-2019

National Standard of the People's Republic of China

ICS
27.010
Classification
F 01

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 Energy Management System
  • 4.1 General
  • 4.2 Management responsibilities
  • 4.2.1 Top Management
  • 4.2.2 Manager Representative
  • 4.3 Energy Policy
  • 4.4 Planning
  • 4.4.1 General
  • 4.4.2 Laws, regulations, standards and other requirements
  • 4.4.2.1 General
  • 4.4.2.2 Laws and Regulations
  • 4.4.2.3 Energy Standard
  • 4.4.2.4 Energy-related fiscal and taxation policies
  • 4.4.2.5 Other requirements
  • 4.4.3 Energy Review
  • 4.4.3.1 General
  • 4.4.3.2 Methods and tools
  • 4.4.3.3 Input for review
  • 4.4.3.4 Focus and content of energy review
  • 4.4.3.5 Guidelines for determining primary energy use
  • 4.4.3.6 Output of energy review
  • 4.4.4 Energy Benchmark
  • 4.4.4.1 General
  • 4.4.4.2 Establishment of an Energy Benchmark
  • 4.4.4.3 Application and adjustment of energy benchmarks
  • 4.4.5 Energy Performance Parameters
  • 4.4.5.1 General
  • 4.4.5.2 Establishment of energy performance parameters
  • 4.4.5.3 Application of energy performance parameters
  • 4.4.6 Energy Target, Energy Indicators and Energy Management Implementation Plan
  • 4.4.6.1 Energy targets and indicators
  • 4.4.6.2 Energy Management Implementation Plan
  • 4.5 Implementation and operation
  • 4.5.1 General
  • 4.5.2 Competence, training and awareness
  • 4.5.2.1 Planning for competence, training and awareness
  • 4.5.2.2 Contents of competence and awareness training
  • 4.5.2.3 Approaches to Competence and Awareness Training
  • 4.5.3 Information exchange
  • 4.5.3.1 Internal Information Exchange
  • 4.5.3.2 External Information Exchange
  • 4.5.4 File
  • 4.5.4.1 Document Requirements
  • 4.5.4.2 File Control
  • 4.5.5 Operation Control
  • 4.5.5.1 General
  • 4.5.5.2 Energy Management Operational Control Guidelines
  • 4.5.5.3 Implementation of Energy Management Operational Guidelines
  • 4.5.5.4 Energy Management and Operational Guidelines Implementation Effectiveness Evaluation
  • 4.5.6 Design
  • 4.5.6.1 General
  • 4.5.6.2 Design input
  • 4.5.6.3 Designed output
  • 4.5.6.4 Designed Energy Assessment
  • 4.5.6.5 Designed post-energy evaluation
  • 4.5.7 Procurement of energy services, products, equipment and energy
  • 4.5.7.1 General
  • 4.5.7.2 Supplier Management
  • 4.5.7.3 Purchasing Requirements
  • 4.5.7.4 Purchasing Control
  • 4.5.7.5 Procurement Verification
  • 4.6 Check
  • 4.6.1 Monitoring, Measurement and Analysis
  • 4.6.1.1 General
  • 4.6.1.2 Content
  • 4.6.1.3 Method
  • 4.6.1.4 Pathway
  • 4.6.1.5 Implementation
  • 4.6.2 Compliance Assessment
  • 4.6.3 Internal audit of the energy management system
  • 4.6.4 Non-compliance, correction, corrective action and preventive measures
  • 4.6.5 Record Control
  • 4.7 Management Review
  • Appendix A (informative) Energy Review Example

1 Scope

This standard proposes systematic guidance for the establishment, implementation, maintenance and improvement of energy management systems for coal-fired and gas-fired power generation enterprises.

This standard applies to coal-fired and gas-fired power generation enterprises, including power generation enterprises that include cogeneration. Coal-fired, gas-owned power plants can refer to this

Standard implementation.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.

Pieces. For undated references, the latest edition (including all amendments) applies to this document.

GB/T 2589 General rules for comprehensive energy consumption calculation

GB/T 13234 energy consumption calculation method

GB 17167 General rules for the provision and management of energy metering units

GB/T 21369 Energy measurement equipment provision and management requirements for thermal power generation enterprises

GB/T 23331-2012 Energy Management System Requirements

GB/T 29456-2012 Energy Management System Implementation Guide

3 Terms and definitions

The following terms and definitions as defined in GB/T 23331-2012 apply to this document.

3.1 Power generation standard coal consumption

During the reporting period, the power plant supplied the grid with a standard coal consumption of 1 kWh of electricity.

Note. Rewrite DL/T 1365-2014, definition 5.3.1.17.

3.2 Power supply standard coal consumption

During the reporting period, after deducting self-use electricity, the power plant will provide the standard coal consumption of 1kWh of electricity to the grid.

Note 1. The unit is gram per kWh (g/kWh).

Note 2. Rewrite DL/T 1365-2014, definition 5.3.1.19.

3.3 Power plant power rate powerfacilityconsumptionrateofpowergeneration

During the reporting period, the electricity used by the generator set for power generation production accounted for the percentage of power generation.

Note. Rewrite DL/T 1365-2014, definition 4.2.4.

3.4 Comprehensive plant power rate

During the reporting period, the total electricity consumption of the generator set used for power generation and transformer losses, related auxiliary energy systems, etc.

The percentage of electricity.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 34 pages — is available in the English PDF.

Similar standards

How to Download GB/T 38218-2019

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
34 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 38218-2019

$510.00