GB/T 37445-2019Ships and marine technology - Marine environment protection - Arrangement and management of port waste reception facilities (English PDF)
Also coversGBT37445-2019
Open the GB/T 37445-2019 preview as PDF
This is a limited preview
Buy now to download the full PDF
Issued by
State Administration for Market Regulation, China National Standardization Administration
Level / Type
National · Recommended
Issue date
May 10, 2019
Implementation date
December 1, 2019
Scope
GB/T 37445-2019 (Ships and marine technology - Marine environment protection - Arrangement and management of port waste reception facilities) is available as an English-translated PDF.
GB/T 37445-2019 — This standard provides methods for handling waste and cargo residues from ships when unloading and onshore management. Port reception The provision, operation and use of PRFs are intrinsically linked. This standard covers the design, operation and management of PRFs. Designed for this standard Ports and terminals for existing PRFs are designed to improve their systems; they can also be used in new ports and terminals where PRFs are being developed. The parties to the International Convention for the Prevention of Pollution from Ships (MARPOL) are responsible for ensuring the ports provided by their ports and terminals. Receiving facilities (PRFs) are sufficient to meet ship requirements without causing undue delays. In addition to the requirements of the receiving facility, MARPOL It does not limit the management of ships that discharge waste and cargo residues at ports and terminals, but ports and terminals may need to consider countries and regions. And local regulations. When these regulations may exceed MARPOL's scope, the International Maritime Organization (IMO) will unload at ports and terminals. Identification of the necessity of ship management of waste and cargo residues as part of environmental protection management measures to avoid, Reduce and eliminate pollution caused by ships. This standard applies to the management of waste and cargo residues specified by MARPOL at the port and terminal, including Develop various rules and issues to be considered during the Port Waste Management Plan (PWMP), PWMP implementation, and PRF operations. PRF Any operation should be determined by rules and procedures in the PWMP. The PRF operating procedure should be tightly integrated with the development of the PWMP. This standard specifies the relevant rules and matters in the following aspects. ---Development of port waste management strategies; ---PRF design and operation; ---The development, implementation and implementation of PWMP; ---PRF management and responsibility. This standard applies to ports and terminals of any size. This standard does not specify the size or location of the PRF in each port, but Provides relevant principles to consider and can be applied to ports or terminals of any size or type (eg marina, fishing port, container terminal, Oil terminals, ro-ro ship terminals, cruise terminals, ferry terminals, bulk or general cargo loading docks, ship repair or recycling facilities, offshore terminals, etc.). This standard can also be applied to inland ports, small boat terminals and ports where PRFs are configured according to regional settings.
Document preview — GB/T 37445-2019
National Standard of the People's Republic of China
- ICS
- 47.020.99
- Classification
- U 47
Issued by: State Administration for Market Regulation, China National Standardization Administration
Contents
- Foreword
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard uses the translation method equivalent to ISO 16304.2018 "ship and marine technology marine environmental protection port waste reception
Facilities layout and management.
This standard has made the following editorial changes.
---6.4 The second-level column item symbol is adjusted from "-" to ".";
--- Tables in Appendix A and Appendix B add numbers and tables;
--- Appendix A, the introduction of the guidance word "waste type and treatment plan see Table A.1";
--- Appendix B, the introduction of the guide "the conversion factor between waste volume and weight is shown in Table B.1".
This standard is proposed and managed by the National Marine Machinery Standardization Technical Committee (SAC/TC137).
This standard was drafted. China Shipbuilding Industry Comprehensive Technology and Economic Research Institute.
1 Scope
This standard provides methods for handling waste and cargo residues from ships when unloading and onshore management. Port reception
The provision, operation and use of PRFs are intrinsically linked. This standard covers the design, operation and management of PRFs. Designed for this standard
Ports and terminals for existing PRFs are designed to improve their systems; they can also be used in new ports and terminals where PRFs are being developed.
The parties to the International Convention for the Prevention of Pollution from Ships (MARPOL) are responsible for ensuring the ports provided by their ports and terminals.
Receiving facilities (PRFs) are sufficient to meet ship requirements without causing undue delays. In addition to the requirements of the receiving facility, MARPOL
It does not limit the management of ships that discharge waste and cargo residues at ports and terminals, but ports and terminals may need to consider countries and regions.
And local regulations. When these regulations may exceed MARPOL's scope, the International Maritime Organization (IMO) will unload at ports and terminals.
Identification of the necessity of ship management of waste and cargo residues as part of environmental protection management measures to avoid,
Reduce and eliminate pollution caused by ships.
This standard applies to the management of waste and cargo residues specified by MARPOL at the port and terminal, including
Develop various rules and issues to be considered during the Port Waste Management Plan (PWMP), PWMP implementation, and PRF operations. PRF
Any operation should be determined by rules and procedures in the PWMP. The PRF operating procedure should be tightly integrated with the development of the PWMP.
This standard specifies the relevant rules and matters in the following aspects.
---Development of port waste management strategies;
---PRF design and operation;
---The development, implementation and implementation of PWMP;
---PRF management and responsibility.
This standard applies to ports and terminals of any size. This standard does not specify the size or location of the PRF in each port, but
Provides relevant principles to consider and can be applied to ports or terminals of any size or type (eg marina, fishing port, container terminal,
Oil terminals, ro-ro ship terminals, cruise terminals, ferry terminals, bulk or general cargo loading docks, ship repair or recycling facilities, offshore terminals, etc.).
This standard can also be applied to inland ports, small boat terminals and ports where PRFs are configured according to regional settings.
2 Normative references
There is no content in this chapter.
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Receiving ability adequacy
The PRF can meet the needs of the ship's normal port of call, does not hinder the use of the ship, does not cause undue delay, and helps protect the environment.
ability.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Buy GB/T 37445-2019
- 1Add to cart. Click the "Buy GB/T 37445-2019" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 46830.2-2026 — Plastics - Liquid crystal polymer (LCP) moulding and extrusion materials - Part 2: Preparation of test specimens and determination of properties
GB/T 28593-2026 — Sand and dust weather warning levels
GB/T 19608.3-2026 — Classification of special environmental conditions - Part 3: Plateau
Secure payment via Stripe
Payments accepted
GB/T 37445-2019
$300.00