Valid

GB/T 36718-2018General principles for energy conservation assessment—Alumina project (English PDF)

节能评估技术导则 氧化铝项目

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 36718-2018 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

September 17, 2018

Implementation date

April 1, 2019

Scope

GB/T 36718-2018 is the English-translated version of 节能评估技术导则 氧化铝项目.

GB/T 36718-2018 gives the technical guidelines for the energy conservation assessment of alumina projects. It applies to new, reconstructed and expanded projects producing metallurgical-grade alumina from bauxite, and other alumina technical transformation projects may refer to it.

It sets out the content and requirements of the assessment, beginning with the preparation stage: defining a scope consistent with the investment that covers energy purchase, storage, conversion, distribution and end use, including existing facilities the project relies on, and collecting basic data on the construction unit and on the project.

It draws on GB/T 31341, on the alumina energy consumption limit of GB 25327, on energy balance methods such as GB/T 28749 and GB/T 28751 and on YS/T 126 for equipment energy grades. It was issued on 17 September 2018 and has applied since 1 April 2019.

Found what you need?

Document preview — GB/T 36718-2018

National Standard of the People's Republic of China

ICS
27.010
Classification
F 01

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Energy conservation assessment content and requirements

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009.

1 Scope

This standard specifies the content and requirements for energy conservation assessment of alumina projects.

This standard is applicable to the energy conservation assessment of new, modified or expanded projects producing metallurgical grade alumina from bauxite, and other alumina technical transformation projects can refer to it for implementation.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this document. For undated references, the latest edition (including all amendments) applies to this document.

GB/T 2589 General rules for comprehensive energy consumption calculation

GB/T 3484 Enterprise Energy Balance General

GB 17167 Energy-using unit energy metering equipment management and general rules

GB/T 23331 Energy Management System Requirements

GB 25327 Alumina unit product energy consumption limit

GB/T 28749 enterprise energy balance network diagram drawing method

GB/T 28751 Enterprise Energy Balance Table Preparation Method

GB/T 31341 Energy Conservation Assessment Technical Guidelines

YS/T 126 alumina production special equipment energy consumption grade

HJ 473 Cleaner Production Standard Alumina Industry

3 Terms and definitions

The terms and definitions defined in GB 25327 and GB/T 31341 apply to this document.

4 Energy conservation assessment content and requirements

4.1 Preparation

4.1.1 Determining the scope of assessment

The scope of energy conservation assessment should be consistent with the scope of investment construction, and should reflect the integrity of the project, covering the entire process of energy purchase and storage, processing and conversion, transportation and distribution, and terminal use.

When the project relies on the construction of existing facilities, the relevant energy use of existing facilities should also be included in the scope of assessment.

The organization undertaking the energy conservation assessment shall fully communicate with the project construction unit, clarify the boundary of the energy use system of the project, and determine the scope of energy conservation assessment.

4.1.2 Collecting basic information

Collect basic data of alumina projects, including.

a) Basic situation of the construction unit.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 36718-2018

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 36718-2018

$145.00