GB/T 36271.2-2021Power installations exceeding 1 kV a. c. and 1.5 kV d. c. - Part 2: D. c. (English PDF)
This is a limited preview
Buy now to download the full PDF (51 pages)
Need quotation for your management?
Get a formal quotation for GB/T 36271.2-2021 in 30 minutes.
Issued by
State Administration for Market Regulation, China National Standardization Administration
Level / Type
National · Recommended
Issue date
August 20, 2021
Implementation date
March 1, 2022
Scope
GB/T 36271.2-2021 (Power installations exceeding 1 kV a. c. and 1.5 kV d. c. - Part 2: D. c.) is available as an English-translated PDF.
GB/T 36271.2-2021 is the Chinese standard "Power installations exceeding 1 kV a. c. and 1.5 kV d. c. - Part 2: D. c.". Its scope clause reads: This document specifies the design and installation requirements of power facilities in DC systems with a nominal voltage above 1.5kV.
This document applies to the following facilities. a) Converter station or DC switch station; b) One or more DC power generation or storage units such as solar power farms or battery storage units on a plant site. including DC equipment Equipment and cables and all related power electronic equipment, control equipment, switchgear and electrical auxiliary systems.
Excluding different plants Connection between site DC power generation or storage units; c) DC facilities installed on offshore facilities for power generation, transmission, distribution and storage of electricity; d) DC terminal stations between underground cables and overhead lines or between underground cables in different sections.
This document does not apply to the design and installation of the following facilities. ---Overhead lines and underground cables between independent facilities; ---Electrified railway; ---Mining equipment and facilities; ---Ship facilities and offshore facilities for oil extraction; ---Electrostatic equipment such as electrostatic precipitator and spraying device; ---Test site; ---Medical X-ray equipment and other medical equipment; ---Valve Hall.
This document does not apply to live work. This document does not apply to the design of pre-installed thyristor valves, voltage source converter (VSC) valves and switchgear.
Found what you need?
Document preview — GB/T 36271.2-2021
National Standard of the People's Republic of China
- Classification
- K 09
Issued by: State Administration for Market Regulation, China National Standardization Administration
Contents
- Foreword
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Basic requirements
- 4.1 General
- 4.2 Electrical requirements
- 4.3 Mechanical requirements
- 4.4 Climate and environmental conditions
- 4.5 Special requirements
- 5 Insulation
- 5.1 General
- 5.2 Choice of insulation level
- 5.3 Test of withstand voltage
- 5.4 Minimum electrical clearance of live parts
- 5.5 Minimum electrical clearance under special conditions
- 5.6 Test connection area
- 6 Device
- 6.1 General
- 6.2 Special requirements
- 7 Facilities
- 7.1 General
- 7.2 Outdoor open facilities
- 7.3 Indoor open facilities
- 7.4 Pre-installed switchgear
- 7.5 Building
- 7.6 High and low voltage prefabricated substation
- 7.7 Electrical facilities on poles, telephone poles and towers
- 8 Safety measures
- 8.1 General
- 8.2 Protection against direct contact
- 8.3 Protective measures for workers indirectly contacting live parts
- 8.4 Protective measures for operators on power facilities
- 8.5 Preventing the danger of arc fault
- 8.6 Prevention of direct lightning strike
- 8.7 Fire protection
- 8.8 Prevent leakage of insulating liquid
- 8.9 Signs and markings
- 9 Protection, control and auxiliary systems
- 10 Grounding system
- 10.1 General
- 10.2 Basic requirements
- 10.3 Grounding system design
- 10.4 Grounding system construction
- 10.5 Measuring
- 10.6 Maintenance
- 11 Inspection and test
- 11.1 General
- 11.2 Special performance inspection
- 11.3 Installation and commissioning process test
- 11.4 Trial run
- 12 Operation and Maintenance Manual
- Appendix B (Normative) Calculation method of allowable contact voltage
- References
1 Scope
This document specifies the design and installation requirements of power facilities in DC systems with a nominal voltage above 1.5kV.
This document applies to the following facilities.
a) Converter station or DC switch station;
b) One or more DC power generation or storage units such as solar power farms or battery storage units on a plant site. including DC equipment
Equipment and cables and all related power electronic equipment, control equipment, switchgear and electrical auxiliary systems. Excluding different plants
Connection between site DC power generation or storage units;
c) DC facilities installed on offshore facilities for power generation, transmission, distribution and storage of electricity;
d) DC terminal stations between underground cables and overhead lines or between underground cables in different sections.
This document does not apply to the design and installation of the following facilities.
---Overhead lines and underground cables between independent facilities;
---Electrified railway;
---Mining equipment and facilities;
---Ship facilities and offshore facilities for oil extraction;
---Electrostatic equipment such as electrostatic precipitator and spraying device;
---Test site;
---Medical X-ray equipment and other medical equipment;
---Valve Hall.
This document does not apply to live work.
This document does not apply to the design of pre-installed thyristor valves, voltage source converter (VSC) valves and switchgear.
2 Normative references
The contents of the following documents constitute the indispensable clauses of this document through normative references in the text. Among them, dated quotations
Only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to
This document.
GB/T 311.1 Insulation coordination Part 1.Definitions, principles and rules (GB/T 311.1-2012, IEC 60071-1.2006,
MOD)
GB/T 311.2-2013 Insulation coordination Part 2.Guidelines for use (IEC 60071-2.1996, MOD)
GB/T 311.3 Insulation coordination Part 3.Insulation coordination procedures for HVDC converter stations (GB/T 311.3-2017,
IEC 60071-5.2014, MOD)
GB/T 4208 enclosure protection class (IP code) (GB/T 4208-2017, IEC 60529.2013, IDT)
GB/T 11022-2020 Common technical requirements for high-voltage AC switchgear and control equipment standards (GB/T 11022-2020,
IEC 62271-1.2017, MOD)
GB/T 12476.3 Electrical equipment for combustible dust environment Part 3.Classification of places where combustible dust is or may be present (GB/T 12476.3-2017,IEC 60079-10-2.2009,MOD)
GB/T 40617 | GB/T 40437 | GB/T 40431 | GB/Z 36271.3 | GB/T 36291.2 | GB/T 36291.1 | […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 51 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 311.2-2013Insulation co-ordination -- Part 2: Application guide
- GB/T 311.3Insulation co-ordination -- Part 3: Procedures for high-voltage direct current (HVDC) converter stations
- GB/T 311.3-2017Insulation co-ordination -- Part 3: Procedures for high-voltage direct current (HVDC) converter stations
- GB/T 4208Degrees of protection provided by enclosures (IP code)
- GB/T 4208-2017Degrees of protection provided by enclosures (IP code)
- GB/T 11022-2020Common specifications for high-voltage alternating-current switchgear and controlgear standards
GB/T 311.1 · GB/T 311.1-2012 · IEC 60071 · IEC 60529.2013 · IEC 62271 · IEC 60079
How to Download GB/T 36271.2-2021
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 11022-2020 — Common specifications for high-voltage alternating-current switchgear and controlgear standards
GB/T 12476.3-2017 — Electrical apparatus for use in the presence of combustible dust -- Part 3: Classification of areas where combustible dusts are or may be present
GB/T 311.11-2025 — Insulation co-ordination - Part 11: Definitions, principles and rules for HVDC system
Secure payment via Stripe
Payments accepted
GB/T 36271.2-2021
$420.00