GB/T 35056-2018Technical specifications for rock bolting in coal mine roadways (English PDF)
煤矿巷道锚杆支护技术规范
This is a limited preview
Buy now to download the full PDF (30 pages)
Need quotation for your management?
Get a formal quotation for GB/T 35056-2018 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
May 14, 2018
Implementation date
December 1, 2018
Scope
GB/T 35056-2018 is the English-translated version of 煤矿巷道锚杆支护技术规范.
GB/T 35056-2018 is the Chinese technical specification for rock bolting in coal mine roadways, covering coal, rock and semi-coal-rock roadways.
It defines the terms used, from roadway types to rock bolts and their parts, and sets technical requirements for site investigation and geotechnical evaluation of the surrounding rock, support design, bolting materials and components, and installation.
It then deals with quality inspection of the bolting work, with its responsibilities, content, requirements and quality assessment, and with monitoring: station installation, comprehensive and daily monitoring, observation frequency, information feedback, abnormal situations, staff training and records.
Informative annexes describe the short-encapsulation pull test for resin bolts, the anchor pull test and the dual-height roof separation indicator. It was issued on 14 May 2018 and has applied since 1 December 2018.
Found what you need?
Document preview — GB/T 35056-2018
National Standard of the People's Republic of China
- ICS
- 73.100.10
- Classification
- D 97
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Technical requirements
- 4.1 Site investigation and geotechnical evaluation of roadway surrounding rock
- 4.2 Bolt Support Design
- 4.3 Bolt support materials and components
- 4.4 Bolt support construction
- 5 Bolt support construction quality inspection
- 5.1 Testing responsibilities
- 5.2 Test content
- 5.3 Testing requirements
- 5.4 Bolt support quality assessment
- 6 Bolt Support Monitoring
- 6.1 Monitoring type
- 6.2 Monitoring content
- 6.3 Station installation and protection
- 6.4 Drawing station position and instrument distribution diagram
- 6.5 Comprehensive monitoring
- 6.6 Daily monitoring
- 6.7 Frequency of observation
- 6.8 Monitoring Information Feedback
- 6.9 Abnormal situation
- 6.10 Monitoring personnel training
- 6.11 Archive system
- Appendix A (informative) Short anchor resin anchor drawing test
- Appendix B (informative) Anchor pull test
- Appendix C (informative) Installation and reading of double height roof separation indicator
- Reference
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
1 Scope
This standard stipulates the terminology and definition of bolt support technology for coal mine roadway, technical requirements, construction quality inspection of bolt support and bolt support monitor.
This standard is applicable to bolt support in coal mine roadway, coal roadway and semi-coal rock roadway.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this document. For undated references, the latest edition (including all amendments) applies to this document.
GB 175-2007 General Portland Cement
GB/T 228.1-2010 tensile testing of metallic materials - Part 1
GB/T 23561.1-2009 Determination of physical and mechanical properties of coal and rock - Part 1
Technical specification for GB 50086 geotechnical anchoring and shotcrete support engineering
MT146.1-2011 Resin anchors - Part 1. Anchoring agents
MT146.2-2011 Resin bolts Part 2. Metal rods and accessories
MT285 seam pipe anchor
MT/T 861 mining W-shaped steel strip
MT/T 1061-2008 resin anchor glass fiber reinforced plastic rod and its accessories
3 Terms and definitions
The following terms and definitions defined in GB/T 228.1-2010, MT146.1-2011, MT285 apply to this document.
3.1 Roadway
A tunnel for coal mine upgrading, transportation, ventilation, drainage, pedestrians, power supply, etc.
3.2 Coal alley
The coal seam area in the section accounts for 4/5 or 4/5 of the roadway.
3.3 Rock laneway
The rock area in the section accounts for 4/5 or 4/5 of the roadway.
3.4 Semi-coal rock roadway
The rock area (including the stone layer) in the section is greater than 1/5 to less than 4/5.
3.5 Anchor
A rod system that is installed in the surrounding rock and anchors the surrounding rock. Generally by rods, trays, nuts, washers, anchors or anchoring members […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 30 pages — is available in the English PDF.
Referenced standards
Normative references
- GB 175-2007Common portland cement
- GB/T 228.1-2010Metallic Materials — Tensile Testing — Part 1: Method of Test at Room Temperature
- GB/T 23561.1-2009Methods for determining the physical and mechanical properties of coal and rock - Part 1: General requirements for sampling
- GB 50086Technical code for engineering of ground anchorages and shotcrete support
- MT/T 861W-shaped steel strap for coal mine
- MT/T 1061-2008Fiber-glass reiuforced plastics bar of bolt and accessories
MT146.1-2011 · MT146.2-2011 · MT285
Cited by
- NB/T 11542-2024Technical specification for cage type cable to floor bolt-grouting support in coal mine roadway
- NB/T 11430-2023Technical requirements for TBM excavation in coal mine
- NB/T 11445-2023Technical specification for full-length anchored prestressed cable support of mine roadway
- NB/T 10728-2021Technical specification for paste filling roadway retaining in coal mine
- NB/T 10742-2021Design specification for intelligent fully mechanized mining face
Similar standards
How to Download GB/T 35056-2018
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 50086-2015 — Technical code for engineering of ground anchorages and shotcrete support
MT/T 1061-2008 — Fiber-glass reiuforced plastics bar of bolt and accessories
MT/T 861-2025 — W-shaped steel strap for coal mine
Secure payment via Stripe
Payments accepted
GB/T 35056-2018
$475.00